steering SUBARU LEGACY 1995 Service Repair Manual
[x] Cancel search | Manufacturer: SUBARU, Model Year: 1995, Model line: LEGACY, Model: SUBARU LEGACY 1995Pages: 2248, PDF Size: 48.81 MB
Page 159 of 2248
![SUBARU LEGACY 1995 Service Repair Manual B2M0154
4. Intake Manifold
A: REMOVAL
1) Release fuel pressure. <Ref. to 2-8 [W1A0].>
2) Disconnect connector from mass air flow sensor.
3) Remove air intake duct, air cleaner upper cover and air
clea SUBARU LEGACY 1995 Service Repair Manual B2M0154
4. Intake Manifold
A: REMOVAL
1) Release fuel pressure. <Ref. to 2-8 [W1A0].>
2) Disconnect connector from mass air flow sensor.
3) Remove air intake duct, air cleaner upper cover and air
clea](/img/17/57432/w960_57432-158.png)
B2M0154
4. Intake Manifold
A: REMOVAL
1) Release fuel pressure.
2) Disconnect connector from mass air flow sensor.
3) Remove air intake duct, air cleaner upper cover and air
cleaner element.
G2M0280
4) Disconnect accelerator cable1.
5) Disconnect cruise control cable
2. (With cruise control
model)
B2M0334
6) Disconnect hoses from pressure sources switching
solenoid valve.
G2M0286
7) Remove power steering pump from bracket.
(1) Loosen lock bolt and slider bolt, and remove front
side V-belt.
B2M0340
(2) Remove pipe with bracket from intake manifold.
8
2-7SERVICE PROCEDURE
4. Intake Manifold
Page 160 of 2248

B2M0334
(3) Remove bolts which install power steering pump
from bracket.
B2M0029
(4) Place power steering pump on the right side wheel
apron.
B6M0160
8) Disconnect spark plug cords from ignition coil.
H2M1246
9) Disconnect engine coolant hoses from throttle body.
H2M1259A
10) Disconnect engine coolant hose1from idle air con-
trol solenoid valve.
11) Disconnect air by-pass hose
2from idle air control
solenoid valve.
9
2-7SERVICE PROCEDURE
4. Intake Manifold
Page 167 of 2248

B6M0160
14) Connect spark plug cords to ignition coil.
B2M0334
15) Install power steering pump on bracket.
(1) Install power steering pump on bracket, and tighten
bolts.
Tightening torque:
20.1±2.5 N⋅m (2.05±0.25 kg-m, 14.8±1.8 ft-lb)
B2M0340
(2) Install power steering pipe bracket on right side
intake manifold.
G2M0286
(3) Install front side V-belt, and adjust it.
B2M0017
(4) Install V-belt cover.
16
2-7SERVICE PROCEDURE
4. Intake Manifold
Page 240 of 2248

2. Engine
A: REMOVAL
1. Set the vehicle on lift arms.
2. Open front hood and support with a stay.
3. Release fuel pressure.
4. Disconnect battery cable and remove battery from vehicle.
5. Drain coolant.
6. Remove cooling system.
With A/C
7. Collect refrigerant, and remove pressure hoses.
8. Remove air intake system.
9. Remove canister and bracket.
10. Disconnect connectors, cables and hoses.
11. Remove power steering pump from bracket.
12. Remove front exhaust pipe and center exhaust pipe.
13. Remove nuts which hold lower side of transmission to
engine.
14. Remove nuts which install front cushion rubber onto front
crossmember.
AT model
15. Separate torque converter from drive plate.
16. Remove pitching stopper.
17. Disconnect fuel delivery hose, return hose and evaporation
hoses.
18. Support engine with a lifting device and wire ropes.
19. Support transmission with a garage jack.
20. Remove bolts which hold upper side of transmission to
engine.
21. Remove engine from vehicle.
6
2-11SERVICE PROCEDURE
2. Engine
Page 248 of 2248

G2M0286
11) Remove power steering pump from bracket.
(1) Loosen lock bolt and slider bolt, and remove front
side V-belt.
B2M0340
(2) Remove pipe with bracket from intake manifold.
B2M0334
(3) Remove bolts which install power steering pump
from bracket.
B2M0029
(4) Place power steering pump on the right side wheel
apron.
G2M0290
12) Remove front exhaust pipe and center exhaust pipe.
(1) Lift-up the vehicle.
(2) Remove nuts which install front exhaust pipe onto
engine.
14
2-11SERVICE PROCEDURE
2. Engine
Page 252 of 2248

B: INSTALLATION
1. Install engine to transmission.
2. Tighten bolts which hold upper side of transmission to engine.
3. Remove lifting device and wire rope.
4. Remove garage jack.
5. Install pitching stopper.
AT model
6. Install torque converter onto drive plate.
7. Install canister and bracket.
8. Install power steering pump on bracket.
9. Tighten nuts which hold lower side of transmission to engine.
10. Tighten nuts which install front cushion rubber onto cross-
member.
11. Install front exhaust pipe and center exhaust pipe.
12. Connect hoses, connectors and cables.
13. Install air intake system.
Air intake duct
Air cleaner element and upper cover.
With A/C
14. Install A/C pressure hoses.
15. Install cooling system.
16. Install battery onto the vehicle, and connect cables.
17. Fill coolant.
18. Check ATF level, and connect if necessary. [AT]
19. Correct power steering oil, and bleed air.
20. Remove front hood stay, and close front hood.
21. Take off the vehicle from lift arms.
18
2-11SERVICE PROCEDURE
2. Engine
Page 254 of 2248

G2M0302
5) Install pitching stopper.
Tightening torque:
T1: 49±5 N⋅m (5.0±0.5 kg-m, 36.2±3.6 ft-lb)
T2: 57±10 N⋅m (5.8±1.0 kg-m, 42±7 ft-lb)
G2M0294
6) Install torque converter onto drive plate. (AT model)
(1) Tighten bolts which hold torque converter to drive
plate.
(2) Tighten other bolts while rotating the engine by
using ST.
ST 499977000 CRANK PULLEY WRENCH
CAUTION:
Be careful not to drop bolts into torque converter
housing.
Tightening torque:
25±2 N⋅m (2.5±0.2 kg-m, 18.1±1.4 ft-lb)
(3) Clog plug onto service hole.
G2M0272
7) Install canister and bracket.
B2M0334
8) Install power steering pump on bracket.
(1) Install power steering pump on bracket, and tighten
bolts.
Tightening torque:
39±10 N⋅m (4.0±1.0 kg-m, 29±7 ft-lb)
20
2-11SERVICE PROCEDURE
2. Engine
Page 255 of 2248
![SUBARU LEGACY 1995 Service Repair Manual B2M0340
(2) Install power steering pipe bracket on right side
intake manifold, and install spark plug codes.
G2M0286
(3) Install front side V-belt, and adjust it.
<Ref. to 1-5 [01A0].>
G2M0292
9) Tigh SUBARU LEGACY 1995 Service Repair Manual B2M0340
(2) Install power steering pipe bracket on right side
intake manifold, and install spark plug codes.
G2M0286
(3) Install front side V-belt, and adjust it.
<Ref. to 1-5 [01A0].>
G2M0292
9) Tigh](/img/17/57432/w960_57432-254.png)
B2M0340
(2) Install power steering pipe bracket on right side
intake manifold, and install spark plug codes.
G2M0286
(3) Install front side V-belt, and adjust it.
G2M0292
9) Tighten nuts which hold lower side of transmission to
engine.
Tightening torque:
50±4 N⋅m (5.1±0.4 kg-m, 36.9±2.9 ft-lb)
G2M0303
10) Tighten nuts which install front cushion rubber onto
crossmember.
Tightening torque:
69±15 N⋅m (7.0±1.5 kg-m, 51±11 ft-lb)
CAUTION:
Be sure to tighten front cushion rubber mounting bolts
in the innermost elliptical hole in the front crossmem-
ber.
21
2-11SERVICE PROCEDURE
2. Engine
Page 388 of 2248

4. CHECK FOR THE AWD FUNCTION
If“tight-corner braking”occurs when the steering wheel is
fully turned at low speed:
1) Determine the applicable trouble code and check the
corresponding duty solenoid C (transfer) for improper
operation.
2) If the solenoid is operating properly, check transfer
clutch pressure.
3) If oil pressure is normal but“tight-corner braking”
occurs:
Check the transfer control valve for sticking, and the trans-
fer clutch facing for wear.
44
3-2SERVICE PROCEDURE
3. Performance Test
Page 461 of 2248

G6M0095
17. Transmission Control Module
A: REMOVAL
1) Disconnect battery ground cable.
B3M0377A
2) Remove lower cover and then disconnect connector.
OBD0040
3) Remove TCM from steering support beam.
4) Disconnect connectors form TCM
1.
OBD0040
B: INSTALLATION
1) Connect connectors to TCM1.
2) Install TCM to steering support beam.
Tightening torque:
7.4±2.0 N⋅m (0.75±0.2 kg-m, 5.4±1.4 ft-lb)
3) Installing procedure hereafter is in the reverse order of
removal.
11 3
3-2SERVICE PROCEDURE
17. Transmission Control Module