bleed SUZUKI GRAND VITARA 1999 2.G Service Workshop Manual
[x] Cancel search | Manufacturer: SUZUKI, Model Year: 1999, Model line: GRAND VITARA, Model: SUZUKI GRAND VITARA 1999 2.GPages: 801, PDF Size: 12.15 MB
Page 83 of 801
YH4
GRAND
VITARA
For CAMI production vehicle
For IWATA production vehicle
1B-12 AIR CONDITIONING (OPTIONAL)
PERFORMANCE DIAGNOSIS
1) Confirm that vehicle and environmental conditions are as fol-
lows.
Vehicle is not exposed to direct sun.
Ambient temperature is within 15C ± 35C (59F ± 95F).
2) Make sure that high pressure valve (1) and low pressure valve
(2) of manifold gauge are firmly closed.
3) Connect high pressure charging hose (3) to high pressure ser-
vice valve (5) on vehicle, and connect low pressure charging
hose (4) to low pressure service valve (6) on vehicle.
4) Bleed the air in charging hoses (3), (4) by loosening their respec-
tive nuts on manifold gauge, utilizing the refrigerant pressure.
When a hiss is heard, immediately tighten nut.
CAUTION:
Do not interchange high and low pressure charging
hoses by mistake.
5) Warm up engine to normal operating temperature (engine cool-
ant temperature at 80 ± 90C (176 ± 194F)) and keep it at spe-
cified idle speed. (Radiator cooling fan should not be working
when checking pressure and temperature.)
6) Turn A / C switch ON, and set blower switch at ªHIº (4th position),
temperature control knob at ªCOOLº, air outlet control knob at
ªFACEº, fresh / circulation control knob at ªCIRCULATIONº.
(Confirm that A / C compressor and condenser fan are working.)
7) Keep all windows, doors and engine food open.
Ambient temperature
15 ± 35C (59F ± 95F)
Engine rpmKeep to 1,500 rpm.
Blower motor switchMax. (4th position)
Temperature controlMax. cool
Air outlet controlFace
Vehicle doorsAll open
Air inlet door positionRecirculation
8) With about 20 mm (0.8 in.) of dry bulb thermometer (1) inserted
into center duct air outlet and another one set near evaporator
air inlet, read temperature indicated on each thermometer.
Page 145 of 801
YH4
GRAND
VITARA
3B1
POWER STEERING (P / S) SYSTEM 3B1-1
GENERAL DESCRIPTION3B1- 2 . . . . . . . . . . . . . .
Power Steering System 3B1- 2. . . . . . . . . . . . . . . . .
Steering Gear Box 3B1- 3. . . . . . . . . . . . . . . . . . . . . .
Power Steering (P / S) Pump 3B1- 4. . . . . . . . . . . . . .
DIAGNOSIS3B1- 5 . . . . . . . . . . . . . . . . . . . . . . . . . . .
General Diagnosis Table 3B1- 5. . . . . . . . . . . . . . . .
Steering Wheel 3B1- 7. . . . . . . . . . . . . . . . . . . . . . . .
Steering Wheel Play Check 3B1- 7. . . . . . . . . . . .
Steering Force Check 3B1- 7. . . . . . . . . . . . . . . . .
Power Steering Fluid 3B1- 7. . . . . . . . . . . . . . . . . . . .
Power Steering Fluid Level Check 3B1- 7. . . . . .
Power Steering Pump Drive Belt 3B1- 8. . . . . . . . .
Belt Tension Check 3B1- 8. . . . . . . . . . . . . . . . . . .
Belt Tension Adjustment 3B1- 8. . . . . . . . . . . . . . .
Idle Up System 3B1- 9. . . . . . . . . . . . . . . . . . . . . . . . .
Idle Up System Check 3B1- 9. . . . . . . . . . . . . . . .
Fluid 3B1- 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fluid Leakage Check 3B1- 9. . . . . . . . . . . . . . . . . Hydraulic Pressure in P / S Circuit 3B1-10. . . . . . . . .
Hydraulic Pressure Check 3B1-10. . . . . . . . . . . . .
Boot 3B1-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Steering Rack Boot Check 3B1-11. . . . . . . . . . . . .
Tie-Rod End Boot Check 3B1-12. . . . . . . . . . . . . .
Air Bleeding Procedure 3B1-12. . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE3B1-13 . . . . . . . . . . . . . . . .
Tie-Rod End 3B1-13. . . . . . . . . . . . . . . . . . . . . . . . . . .
Power Steering Gear Box Assembly 3B1-14. . . . . .
Rack Boot and Tie-Rod (Except Canvas
Top LH Model) 3B1-16. . . . . . . . . . . . . . . . . . . . . . . .
Rack Boot and Tie-Rod (For Canvas
Top LH Model) 3B1-17. . . . . . . . . . . . . . . . . . . . . . . .
Power Steering Pump 3B1-19. . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE SPECIFICATION3B1-26 . . .
REQUIRED SERVICE MATERIAL3B1-26 . . . . . . . .
SPECIAL TOOL3B1-26 . . . . . . . . . . . . . . . . . . . . . . .
SECTION 3B1
POWER STEERING (P/S) SYSTEM
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to ªAir Bag System Components and Wiring Location Viewº under ªGener-
al Descriptionº in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and ªService Precau-
tionsº under ªOn-Vehicle Serviceº in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
ªLOCKº position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
NOTE:
Some parts in the Power Steering Gear Box cannot be disassembled or adjusted. For detailed informa-
tion, refer to the description of ªPOWER STEERING GEAR BOX ASSEMBLYº.
All steering gear fasteners are important attaching parts in that they could affect the performance of vital
parts and systems, and / or could result in major repair expense. They must be replaced with one of the
same part number or with an equivalent part if replacement becomes necessary. Do not use a replace-
ment part of lesser quality or substitute design. Torque values must be used as specified during reas-
sembly to assure proper retention of these parts.
Although the figures in this section show only the left-hand steering vehicle, the same work procedure
and data apply to the right-hand steering vehicle.
CONTENTS
Page 154 of 801
YH4
GRAND
VITARA
1. P / S fluid reservoir
2. Attachment
3. Gasket4. Union bolt
5. High pressure side
6. Low pressure side
1. P / S fluid reservoir
2. Gauge valve (open)
3. P / S pump4. P / S gear box
5. High pressure side
6. Low pressure side
3B1-10 POWER STEERING (P / S) SYSTEM
HYDRAULIC PRESSURE IN P / S CIRCUIT
HYDRAULIC PRESSURE CHECK
1) After cleaning joint of high pressure hose and P / S pump thor-
oughly, disconnect hose from pump and install special tool (oil
pressure gauge, attachment and hose).
Tighten each flare nut to specified torque.
CAUTION:
Take care not to cause damage to A / C condenser during
service operation, if equipped.
Special Tool
(A): 09915-77410 (Oil pressure gauge)
(B): 09915-77420
2) Check each connection for fluid leakage and bleed air.
Refer to ªAIR BLEEDING PROCEDUREº in this section.
3) With engine idling, turn steering wheel and warm up engine till
temperature of fluid in P/S fluid reservoir rises to 50 ± 60C (122
± 140F).
4) Check back pressure by measuring hydraulic pressure with en-
gine idling and hands off steering wheel.
Back pressure: Lower than 1000 kPa (10 kg / cm
2, 142 psi)
When back pressure is higher than specified values, check con-
trol valve and piping for clogging.
Page 156 of 801
YH4
GRAND
VITARA
3B1-12 POWER STEERING (P / S) SYSTEM
TIE-ROD END BOOT CHECK
Check boot for crack and damage and if any, replace it with a new
one.
AIR BLEEDING PROCEDURE
1) Hoist the front end of vehicle and apply safety stands.
2) Fill P / S fluid reservoir with fluid up to specified level.
NOTE:
Before starting engine, place transmission gear shift lever
in ªNeutralº (shift selector lever to ªPº range for A / T mod-
el), and set parking brake.
3) After running engine at idling speed for 3 to 5 seconds, stop it
and add fluid to satisfy specification.
4) With engine stopped, turn steering wheel to the right and left as
far as it stops, repeat it a few times and fill fluid to specified level.
5) With engine running at idling speed, repeat stop-to-stop turn of
steering wheel till all foams in P / S fluid reservoir are gone.
NOTE:
Make sure to bleed air completely. If air remains in fluid, P / S
pump may make humming noise or steering wheel may feel
heavy.
6) Finally check to make sure that fluid is filled to specified level.
Page 159 of 801
YH4
GRAND
VITARA
1. Steering gear box mounting bolts
1. Mark
2. Gear case
3. Pinion shaft
POWER STEERING (P / S) SYSTEM 3B1-15
7) Remove steering gear box mounting bolts and then remove
steering gear box from vehicle.
Steering gear box found to be in defective condition should be
replaced with a new one.
CAUTION:
Never disassemble P / S gear box. If perform this prohib-
ited service, it will affect original performance.
INSTALLATION
Reverse removal procedure for installation of steering gear box
noting the following points.
After confirming that front tire is in straight position, install steering
gear box to body temporarily. Next, with tie-rod end installed to
knuckle, set rack in position close to neutral. Then obtain the neu-
tral state by aligning match marks on pinion shaft and steering
gear case and insert steering lower joint into pinion shaft.
CAUTION:
Be sure to confirm that steering wheel and front tires
(wheels) are in straight position when inserting steering
lower joint into steering pinion shaft.
If a plug was put to disconnected pipe when removing steering
gear box, remove that plug before reconnecting pipe.
Use specified torque as given below.
Tightening Torque
(a): 25 N
.m (2.5 kg-m, 18.0 lb-ft)
(b): 40 N
.m (4.0 kg-m, 29.0 lb-ft)
(c): 25 N
.m (2.5 kg-m, 18.0 lb-ft)
(d): 55 N
.m (5.5 kg-m, 40.0 lb-ft)
After installation, be sure to fill specified power steering fluid and
bleed air.
Check toe setting. Adjust as required. (Refer to Front End Align-
ment.)
Page 161 of 801
YH4
GRAND
VITARA
POWER STEERING (P / S) SYSTEM 3B1-17
1. Tie-rod
2. Steering rack
3. Boot
4. Mark
1. Tie-rod lock washer
2. Tie-rod
3. Steering rack
4. Aluminium plate
5. Vise
1. Tie-rod
2. Mark
3. Lock nut
4. Tie-rod end
5. Knuckle
6. Nut
2) Install tie-rod end lock nut and tie-rod end to tie-rod. Position lock
nut to the mark made in removal.
3) Install steering gear box assembly by referring ªPOWER
STEERING GEAR BOX ASSEMBLY INSTALLATIONº in this
section.
After installation, fill specified P / S fluid and bleed air from sys-
tem. Then check toe setting and adjust as required.
RACK BOOT AND TIE-ROD
(FOR CANVAS TOP LH MODEL)
REMOVAL
1) Remove steering gear case, refer to ªPOWER STEERING
GEAR BOX ASSEMBLY REMOVALº in this section.
2) For ease of adjustment after installation, make marking of tie-rod
end lock nut position of tie-rod thread.
3) Loosen tie-rod end lock nut and remove tie-rod end.
4) Remove boot band and clip.
5) Remove boot from tie-rod.
6) Unbend washer (2 places), and remove tie-rod from rack.
Page 169 of 801
YH4
GRAND
VITARA
POWER STEERING (P / S) SYSTEM 3B1-25
INSTALLATION
Reverse removal procedure, and then noting the following instruc-
tions.
For tightening torques, refer to structural diagram on previous
page.
Adjust power steering pump drive belt by referring to ªBELT TEN-
SION ADJUSTMENTº under ªPOWER STEERING PUMP
DRIVE BELTº in this section.
Fill specified power steering fluid after installation and bleed air
without failure. (Refer to ªAIR BLEEDING PROCEDUREº in this
section.)
Page 248 of 801
YH4
GRAND
VITARA
3. Container 1. Plug cap
2. Vinyl tube
1. Bearing retainer
(e)
(f)
(g)
REAR SUSPENSION 3E-21
16) Apply sealant to mating surface of bearing retainer with brake
back plate.
NOTE:
Make sure to remove old sealant before applying it anew.
ªBº: Sealant 99000-31110
17) Install rear axle shaft to rear axle housing and tighten bearing
retainer nuts to specified torque.
NOTE:
When installing rear axle shaft, be careful not to cause
damage to oil seal lip in axle housing.
Tightening Torque
(e): 23 N
.m (2.3 kg-m, 17.0 lb-ft)
18) For vehicle with ABS, tighten wheel speed sensor bolt to speci-
fied torque.
Tightening Torque
(f): 21 N
.m (2.1 kg-m, 15.5 lb-ft)
19) Connect brake pipes to wheel cylinders (right & left) and tighten
brake pipe flare nuts to specified torque.
Tightening Torque
(g): 16 N
.m (1.6 kg-m, 11.5 lb-ft)
20) Install brake drum (right & left). For details, refer to SECTION
5C ªBRAKE DRUM INSTALLATIONº.
21) Refill differential gear housing with new specified gear oil. Re-
fer to ªON-VEHICLE SERVICEº in SECTION 7F for refill.
22) Fill reservoir with brake fluid and bleed brake system.(For
bleeding operation, see SECTION 5.)
Page 255 of 801
YH4
GRAND
VITARA
1. Paint
3F-4 WHEELS AND TIRES
Higher than Recommended Pressure Can Cause:
1. Hard ride
2. Tire bruising or carcass damage
3. Rapid tread wear at center of tire
Unequal Pressure on Same Axle Can Cause:
1. Uneven braking
2. Steering lead
3. Reduced handling
4. Swerve on acceleration
Valve caps should be kept on valves to keep dust and
water out.Lower than Recommended Pressure Can Cause:
1. Tire squeal on turns
2. Hard steering
3. Rapid and uneven wear on the edges of the tread
4. Tire rim bruises and rupture
5. Tire cord breakage
6. High tire temperatures
7. Reduced handling
8. High fuel consumption
MAINTENANCE AND MINOR ADJUSTMENTS
WHEEL AND TIRE
Wheel repairs that use welding, heating, or peening are not approved. All damaged wheels should be replaced.
STUDS
If a broken stud is found, see Section 3E (rear) or Section 3D (front) for Note and Replacement procedure.
MATCHED TIRES AND WHEELS
(For vehicle equipped with steel wheels)
Tires and wheels are matchmounted at the assembly plant.
This means that the radially stiffest part of the tire, or ªhigh spotº, is
matched to the smallest radius or ªlow spotº of the wheel.
This is done to provide the smoothest possible ride.
The ªhigh spotº of the tire is originally marked by paint dot on the
outboard sidewall. This paint dot will eventually wash off the tire.
The ªlow spotº of the wheel is originally marked by paint dot on the
wheel rim-flange. Properly assembled, the wheel rims' paint dot
should be aligned with the tires' paint dot as shown in left figure.
Whenever a tire is dismounted from its wheel, it should be re-
mounted so that the tire and wheel are matched. If the tire's paint
dot cannot be located, a line should be scribed on the tire and wheel
before dismounting to assure that it is remounted in the same posi-
tion.
INFLATION OF TIRES
The pressure recommended for any model is carefully calculated to give a satisfactory ride, stability, steering, tread
wear, tire life and resistance to bruises.
Tire pressure, with tires cold, (after vehicle has set for three hours or more, or driven less than one mile) should
be checked monthly or before any extended trip. Set to the specifications on the tire placard located on the side
of instrument panel.
It is normal for tire pressure increase when the tires become hot during driving. Do not bleed or reduce tire pressure
after driving. Bleeding reduces the ªCold Inflation Pressureº.
Page 277 of 801
YH4
GRAND
VITARA
5
BRAKES 5-1
GENERAL DESCRIPTION5- 2 . . . . . . . . . . . . . .
DIAGNOSIS5- 3 . . . . . . . . . . . . . . . . . . . . . . . . . . .
Road Testing Brakes 5- 3. . . . . . . . . . . . . . . . . .
Brake Fluid Leaks 5- 3. . . . . . . . . . . . . . . . . . . .
Substandard or Contaminated
Brake Fluid 5- 3. . . . . . . . . . . . . . . . . . . . . . . . .
Diagnosis Table 5- 4. . . . . . . . . . . . . . . . . . . . . .
CHECK AND ADJUSTMENT5- 7 . . . . . . . . . . . .
Bleeding Brakes 5- 7. . . . . . . . . . . . . . . . . . . . . .
Brake Pedal Free Height Check 5- 9. . . . . . . .
Brake Light Switch Adjustment 5- 9. . . . . . . . .
Excessive Pedal Travel Check 5- 9. . . . . . . . .
Brake Pedal Play Check 5-10. . . . . . . . . . . . . . .
Brake Fluid Level Check 5-10. . . . . . . . . . . . . . . Brake Hose and Pipe Check 5-10. . . . . . . . . . .
Master Cylinder Check 5-10. . . . . . . . . . . . . . . .
Brake Disc Check 5-11. . . . . . . . . . . . . . . . . . . .
Brake Pad Check 5-11. . . . . . . . . . . . . . . . . . . . .
Brake Shoe Check 5-11. . . . . . . . . . . . . . . . . . . .
Parking Brake Check and
Adjustment 5-12. . . . . . . . . . . . . . . . . . . . . . . . .
Flushing Brake Hydraulic System 5-13. . . . . . .
Fluid Pressure Test 5-13. . . . . . . . . . . . . . . . . . .
Booster Operation Check 5-15. . . . . . . . . . . . . .
TIGHTENING TORQUE
SPECIFICATIONS5-17 . . . . . . . . . . . . . . . . . . . .
REQUIRED SERVICE MATERIAL5-17 . . . . . . . .
SPECIAL TOOLS5-18 . . . . . . . . . . . . . . . . . . . . . .
SECTION 5
BRAKES
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to ªAir Bag System Components and Wiring Location Viewº under ªGener-
al Descriptionº in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and ªService Precau-
tionsº under ªOn-Vehicle Serviceº in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
ªLOCKº position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
NOTE:
When inspecting and servicing vehicle equipped with ABS, be sure to refer to section 5E or 5E1 first.
All brake fasteners are important attaching parts in that they could affect the performance of vital parts
and systems, and / or could result in major repair expense. They must be replaced with one of same part
number or with an equivalent part if replacement becomes necessary. Do not use a replacement part of
lesser quality or substitute design. Torque values must be used as specified during reassembly to as-
sure proper retention of all parts. There is to be no welding as it may result in extensive damage and
weakening of the metal.
DIAGNOSIS5-3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BRAKE PIPE / HOSE / MASTER CYLINDER5A-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
FRONT BRAKE5B-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PARKING AND REAR BRAKE5C-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CONTENTS