7B1-45 SUZUKI GRAND VITARA 2001 2.G Owners Manual
[x] Cancel search | Manufacturer: SUZUKI, Model Year: 2001, Model line: GRAND VITARA, Model: SUZUKI GRAND VITARA 2001 2.GPages: 656, PDF Size: 14.31 MB
Page 411 of 656
7B1-2 AUTOMATIC TRANSMISSION (4 A/T)
Stall Test ................................................... 7B1-38
Line Pressure Test .................................... 7B1-39
Road Test ................................................. 7B1-40
Manual Road Test..................................... 7B1-41
Time Lag Test ........................................... 7B1-41
Engine Brake Test .................................... 7B1-42
“P” Range Test.......................................... 7B1-42
On-Vehicle Service ..................................... 7B1-43
Maintenance Service ................................ 7B1-43
Fluid level .............................................. 7B1-43
Fluid change.......................................... 7B1-44
A/T Throttle Cable ..................................... 7B1-45Solenoid Valves (Shift Solenoid Valves
and TCC Solenoid Valve) ......................... 7B1-45
MANUAL SELECTOR ASSEMBLY .......... 7B1-46
SELECT CABLE ....................................... 7B1-48
Unit Repair .................................................. 7B1-49
Sub-Assembly Repair ............................... 7B1-49
Overdrive (case side) ............................ 7B1-49
Forward clutch ...................................... 7B1-50
Front upper valve body ......................... 7B1-54
Unit Assembly ........................................... 7B1-59
Tightening Torque Specification............... 7B1-60
Special Tool ................................................ 7B1-61
Page 454 of 656
AUTOMATIC TRANSMISSION (4 A/T) 7B1-45
A/T Throttle Cable
ADJUSTMENT
1) Pull inner cable (3) by force of 2 N (0.2 kg, 0.45 lb) or less to
be no slack of inner cable with A/T throttle cable (1) curved
as shown in the figure.
2) Fix stopper (2) to inner cable (3) with clearance “c”.
A/T throttle cable adjusting position (clearance “c”) :
0.8 – 1.5 mm (0.03 – 0.06 in.)
3) Warm up engine and transmission to normal operating tem-
perature.
4) Make sure that accelerator cable is adjusted as specified.
5) With throttle valve closed, check clearance “c”, which should
be within the following specification, of A/T throttle cable (1).
If it is out of specification, adjust it by turning cable adjusting
nut (2).
A/T throttle cable adjusting position (clearance “c”) :
0.8 – 1.5 mm (0.03 – 0.06 in.)
6) Tighten lock nut (3) securely.
Solenoid Valves (Shift Solenoid Valves and
TCC Solenoid Valve)
INSPECTION
With PCM couplers disconnected and using service wire as
shown in the figure, check each solenoid valve for clicking sound.
Shift solenoid valve - A (#1) C51-1-2
Shift solenoid valve - B (#2) C51-1-1
TCC (Lock-up) solenoid valve C51-1-8