Timing marks SUZUKI SWIFT 2006 2.G Service Workshop Manual

SUZUKI SWIFT 2006 2.G Service Workshop Manual SWIFT 2006 2.G SUZUKI SUZUKI https://www.carmanualsonline.info/img/20/7607/w960_7607-0.png SUZUKI SWIFT 2006 2.G Service Workshop Manual

Page 310 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-25 Engine Mechanical: 
Timing Chain and Chain Tensioner Removal 
and Installation
S7RS0B1406018
Removal
CAUTION! 
After timing chain is remo

Page 311 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-26
3) Install timing chain by aligning dark blue plate (1) of timing chain and triangle mark (2) on camshaft 
timing spr

Page 312 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-27 Engine Mechanical: 
8) Screw in plunger (1) by turning body (2) in arrow direction and install a reta iner (3) (wire) to hold 
plunger in

Page 315 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-30
Installation1) Install tappets and shims to cylinder head. Apply engine oil around tappet and then install it to 
cyl