321 SUZUKI SX4 2006 1.G Service User Guide
[x] Cancel search | Manufacturer: SUZUKI, Model Year: 2006, Model line: SX4, Model: SUZUKI SX4 2006 1.GPages: 1556, PDF Size: 37.31 MB
Page 829 of 1556

Downloaded from www.Manualslib.com manuals search engine Manual Transmission/Transaxle: 5B-17
Fifth Gear Disassembly and ReassemblyS6RW0D5206015
Disassembly
1) Remove cover bolts and take off transaxle side
cover.
CAUTION!
Care should be taken not to distort side cover
when it is removed from left case.
2) Using special tool, remove circlip (1).
Special tool
: 09900–06107
3) Remove shift fork shaft bolt (2).
4) Remove gear shift fork (3) and 5th gear all together.
Use gear puller for removal if spline fitting of hub is
tight.5) Unfasten caulking of countershaft nut (2), install
input shaft 5th gear (1) and special tool to stop
rotation of shafts, and then remove countershaft nut
(2).
Special tool
(A): 09927–76060
6) Remove input shaft 5th gear, needle bearing and
then countershaft 5th gear (1). Gear puller (2) would
be necessary if spline fitting of countershaft 5th gear
is tight.
10. Oil drain plug
: Apply sealant 99000-31260 to all around thread part of plug.31. Reverse shaft bolt
: Apply sealant 99000-31260 to thread part of bolt.
11. Oil gutter bolt
: Apply thread lock 99000-32110 to all around thread part of bolt.32. Washer
12. Left case plate bolt
: Apply thread lock 99000-32110 to all around thread part of bolt.33. Oil seal
: Apply SUZUKI SUPER GREASE A
99000-25010 to Oil seal lip.
13. Side cover bolts 34. Outer race
14. Transaxle case bolts 35. Shim
15. 5th speed synchronizer ring 36. Oil gutter
16. 5th speed synchronizer lever : 21 N⋅m (2.1 kgf-m, 15.5 lb-ft)
17. 5th speed sleeve & hub : 23 N⋅m (2.3 kgf-m, 17.0 lb-ft)
18. Circlip: 10 N⋅m (1.0 kgf-m, 7.5 lb-ft)
19. Bearing set shim : 100 N⋅m (10.0 kgf-m, 72.5 lb-ft)
20. Countershaft 5th gear : Do not reuse.
21. Countershaft nut
: After tightening nut to specified torque, caulk nut securely.: Apply transaxle oil.
32
1
I4RH01520015-01
(A)
2
1
I4RH01520016-01
I4RH01520017-01
Page 831 of 1556

Downloaded from www.Manualslib.com manuals search engine Manual Transmission/Transaxle: 5B-19
7) Fit 5th gear shift fork (1) to sleeve (3) and hub (2)
assembly, and install them into input shaft and gear
shift shaft, aligning punch mark (4) with matching
mark (5) on input shaft.
8) Tighten shift fork shaft bolt (2) to which thread lock
cement has been applied.
“A”: Thread lock cement 99000–32110 (Thread
Lock Cement Super 1322)
Tightening torque
Shift fork shaft bolt (a): 10 N·m (1.0 kgf-m, 7.5 lb-
ft)
9) Using special tool, install new circlip (1) to input shaft
(3).
Special tool
: 09900–0610710) Clean mating surface of both left case and side
cover (1), apply sealant to side cover as shown in
figure by such amount that its section is 1.5 mm
(0.059 in.) in diameter, mate it with left case, and
then tighten side cover bolts with specified torque.
“B”: Sealant 99000–31260 (SUZUKI Bond
No.1217G)
Tightening torque
Side cover bolt (a): 10 N·m (1.0 kgf-m, 7.5 lb-ft)
Manual Transaxle Assembly Disassembly and
Reassembly
S6RW0D5206016
Disassembly
1) Remove left case plate bolts (1), and take off left
case plate (2).
I3RH0A520080-01
2, (a), “A”
13
I5RW0A520019-013. Input shaft
I5RW0A520020-01
I4RH01520018-01
Page 833 of 1556

Downloaded from www.Manualslib.com manuals search engine Manual Transmission/Transaxle: 5B-21
Reassembly
1) Install differential assembly into right case.
2) Join input shaft (5), countershaft (4), low speed gear
shift shaft (2) and high speed gear shift shaft (3)
assemblies all together, then install them into right
case (1) so as not to damage oil seal by input shaft
spline.
NOTE
• Input shaft right bearing on shaft can be
installed into right case (1) by tapping shaft
with plastic hammer.
• Make sure that countershaft is engaged
with final gear while installing.
3) Install 5th & reverse gear shift shaft (1) with 5th &
reverse gear shift guide shaft (2) into right case (5).
Reverse gear shift arm (4) has to be joined with
reverse gear shift lever (3) at the same time.4) Make reverse idler gear (1) with reverse gear shift
lever (2), insert reverse gear shaft (3) and washer (6)
into case (4) through idler gear and then align bolt
hole “a” in shaft with notch “b” in case.
5) Fasten reverse gear shift lever bolts (5) after
applying thread lock cement.
“A”: Thread lock cement 99000–32110 (Thread
Lock Cement Super 1322)
Tightening torque
Reverse gear shift lever bolt (a): 23 N·m (2.3 kgf-
m, 17.0 lb-ft)
NOTE
Check to confirm that reverse gear shift lever
end has clearance “c” to idler gear groove.
Distance between lever end and idler gear shaft
“c”: 0.5 – 1.0 mm (0.02 – 0.04 in.)
I2RH01520080-01
I3RH0A520013-01
I5RW0A520022-02
Page 834 of 1556

Downloaded from www.Manualslib.com manuals search engine 5B-22 Manual Transmission/Transaxle:
6) Clean mating surfaces of both right and left cases,
apply sealant to left case (2) as shown in the figure
by such amount that its section is 1.5 mm (0.059 in.)
in diameter then mate it with right case (1).
“A”: Sealant 99000–31260 (SUZUKI Bond
No.1217G)
7) Tighten case bolts (3) from outside and tighten
another case bolts from clutch housing side to
specified torque.
Tightening torque
Transaxle case bolt (a): 23 N·m (2.3 kgf-m, 17.0
lb-ft)
8) Install reverse shaft bolt (4) to which thread lock
cement has been applied, with aluminum washer
and tighten it to specified torque.
“B”: Sealant 99000–31260 (SUZUKI Bond
No.1217G)
Tightening torque
Reverse shaft bolt (b): 23 N·m (2.3 kgf-m, 17.0
lb-ft)9) Check locating springs (2, 4 and 5) for deterioration
and replace with new ones as necessary.
Locating spring
10) Install steel balls (3) and locating springs (2, 4 and 5)
for respective gear shift shaft and tighten bolts (1) to
which thread lock cement has been applied.
“A”: Thread lock cement 99000–32110 (Thread
Lock Cement Super 1322)
Tightening torque
Gear shift locating bolt (a): 13 N·m (1.3 kgf-m,
9.5 lb-ft)
11) Install new snap ring (1) using special tool.
Special tool
(A): 09900–06107
I5RW0A520023-01
Locating spring free length Standard Service limit
Low speed (2)53.1 mm
(2.091 in.)47.8 mm
(1.881 in.)
High speed (4)45.9 mm
(1.807 in.)41.4 mm
(1.629 in.)
5th & reverse (5)29.9 mm
(1.777 in.)27.0 mm
(1.062 in.)
2. Input shaft
3. Input shaft left bearing
1, (a), “A”
2
3
4
5
I5RW0A520024-02
1 (A)
2
3
I3RH0A520016-01
Page 836 of 1556

Downloaded from www.Manualslib.com manuals search engine 5B-24 Manual Transmission/Transaxle:
16) Place left case plate (2) inserting its end in groove of
shift guide shaft (4) and then tighten bolts (1) to
which thread lock cement has been applied.
NOTE
After tightening bolts, make sure that
countershaft can be rotated by hand feeling
certain load.
“A”: Thread lock cement 99000–32110 (Thread
Lock Cement Super 1322)
Tightening torque
Left case plate bolt (a): 23 N·m (2.3 kgf-m, 17.0
lb-ft)
Right Case Disassembly and ReassemblyS6RW0D5206017
Disassembly
1) Remove differential side oil seal from right case
referring to “Differential Side Oil Seal Replacement”,
if necessary.
2) Remove differential side bearing outer race (1) using
brass bar (2), if necessary.3) Remove input shaft oil seal by using special tool, if
necessary.
Special tool
(A): 09913–75830
4) Pull out countershaft right bearing outer race by
using special tools, if necessary.
Special tool
(A): 09930–30104
(B): 09941–64511
Reassembly
1) Install input shaft oil seal facing its spring side
upward until it becomes flush with case surface. Use
special tool and hammer for installation and apply
grease to oil seal lip.
: Grease 99000–25011 (SUZUKI Super Grease A)
Special tool
(A): 09913–76010
3. Input shaft
5. Countershaft
I2RH01520087-01
2
1
I4RH01520024-01
(A)
I5RW0A520026-01
(A)
(B)
I5RW0A520027-01
(A)
I5RW0A520028-01
Page 838 of 1556

Downloaded from www.Manualslib.com manuals search engine 5B-26 Manual Transmission/Transaxle:
Reassembly
1) If oil gutter has been removed, install it with bolt to
which thread lock cement has been applied.
“A”: Thread lock cement 99000–32110 (Thread
Lock Cement Super 1322)
Tightening torque
Oil gutter bolt (a): 10 N·m (1.0 kgf-m, 7.5 lb-ft)
2) Select differential side shim as follows.
a) Keep pushing outer race (4) with the power of 35
N (3.5 kgf) and turn differential case 10 times or
more.
b) Measure distance “a” of differential assembly (1).
c) Measure depth “b” of left case (2) and “c” of right
case (3).
d) Calculate the clearance of “d” by the following
expressions.3) Select shim closest to clearance “d” from among the
following available sizes.
Available shim thickness
4) Put shim and then install differential side bearing
outer race using special tools. Clearance of “d” = Depth “b” + Depth “c” – Distance “a”
[A]: Press 35 N (3.5 kgf)
I2RH01520043-01
I7RW01520013-01
Clearance “d” Select shim
0.800 – 0.839 mm
(0.0315 – 0.0330 in.)1.00 mm (0.0394 in.)
0.840 – 0.879 mm
(0.0331 – 0.0345 in.)1.04 mm (0.0409 in.)
0.880 – 0.919 mm
(0.0346 – 0.0362 in.)1.08 mm (0.0425 in.)
0.920 – 0.959 mm
(0.0362 – 0.0378 in.)1.12 mm (0.0441 in.)
0.960 – 0.999 mm
(0.0378 – 0.0393 in.)1.16 mm (0.0457 in.)
1.000 – 1.039 mm
(0.0394 – 0.0409 in.)1.20 mm (0.0472 in.)
1.040 – 1.079 mm
(0.0409 – 0.0425 in.)1.24 mm (0.0488 in.)
1.080 – 1.119 mm
(0.0425 – 0.0441 in.)1.28 mm (0.0504 in.)
1.120 – 1.159 mm
(0.0441 – 0.0456 in.)1.32 mm (0.0520 in.)
1.160 – 1.199 mm
(0.0457 – 0.0472 in.)1.36 mm (0.0535 in.)
1.200 – 1.239 mm
(0.0472 – 0.0488 in.)1.40 mm (0.0551 in.)
1.240 – 1.279 mm
(0.0488 – 0.0504 in.)1.44 mm (0.0567 in.)
1.280 – 1.319 mm
(0.0504 – 0.0519 in.)1.48 mm (0.0583 in.)
1.320 – 1.359 mm
(0.0520 – 0.0535 in.)1.52 mm (0.0598 in.)
1.360 – 1.399 mm
(0.0535 – 0.0551 in.)1.56 mm (0.0614 in.)
1.400 – 1.439 mm
(0.0551 – 0.0567 in.)1.60 mm (0.0630 in.)
1.440 – 1.479 mm
(0.0567 – 0.0582 in.)1.64 mm (0.0646 in.)
1.480 – 1.529 mm
(0.0583 – 0.0602 in.)1.68 mm (0.0661 in.)
Page 851 of 1556

Downloaded from www.Manualslib.com manuals search engine Manual Transmission/Transaxle: 5B-39
Special Tools and Equipment
Recommended Service MaterialS6RW0D5208001
NOTE
Required service material is also described in the following.
“Gear Shift Control Lever and Cable Components”
“Gear Shift and Select Shaft Assembly Components”
“Manual Transaxle Assembly Components”
“Input Shaft and Countershaft Components”
“Gear Shift Shaft Components”
“Differential Components”
Special ToolS6RW0D5208002
Material SUZUKI recommended product or Specification Note
Grease SUZUKI Super Grease A P/No.: 99000–25011 ) / ) / )
Sealant SUZUKI Bond No.1217G P/No.: 99000–31260 ) / ) / ) / ) / ) / ) / ) /
) / ) / )
Thread lock cement Thread Lock Cement Super 1322 P/No.: 99000–32110 ) / ) / ) / ) / )
09900–06107 09900–20607
Snap ring pliers (opening
type)Dial gauge
) / ) / ) / ) / ) / ) )
09900–20701 09913–50121
Magnetic stand Oil seal remover
) )
09913–65135 09913–70123
Bearing puller Bearing installing tool
) / ) ) / )
09913–75510 09913–75810
Bearing installer Bearing installer
) )
09913–75821 09913–75830
Bearing installer attachment Steering pinion bush
installer
) )
Page 948 of 1556

Downloaded from www.Manualslib.com manuals search engine 7B-8 Air Conditioning System: Manual Type
Diagnostic Information and Procedures
A/C System Performance InspectionS6RW0D7214001
1) Confirm that vehicle and environmental conditions
are as follows.
• Vehicle is put indoors.
• Ambient temperature is within 25 – 35 °C (77 – 95
°F).
• Relative humidity is within 30 – 70%.
• There is no wind indoors.
• HVAC unit is normal.
• Blower motor is normal.
• There is no air leakage from air ducts.
• Condenser fins are clean.
• HVAC air filter is not clogged with dirt and dust (if
equipped).
• Battery voltage is about 12 V.
• Radiator cooling fan operates normally.
2) Make sure that high pressure valve (1) and low
pressure valve (2) of manifold gauge are firmly
closed.
3) Connect high pressure charging hose (3) to high
pressure service valve (5) on vehicle and low
pressure charging hose (4) to low pressure service
valve (6).
4) Bleed the air in charging hoses (3) and (4) by
loosening their nuts respectively utilizing the
refrigerant pressure. When a hissing sound is heard,
immediately tighten nut.
CAUTION!
Do not connect high and low pressure
charging hoses in reverse.
5) Warm up engine to the normal operating
temperature and keep it at the specified idle speed.
6) Turn A/C switch ON, set blower speed selector at
maximum speed position, temperature selector at
maximum cold position, air flow selector at face
position, and air intake selector at recirculation
position. (Confirm that A/C compressor, A/C
condenser cooling fan and radiator cooling fan are
working.)
7) Wait for ten minutes to stabilize the A/C operation.
8) Open all door windows, front doors and engine hood.
9) With about 20 mm (0.8 in.) of dry bulb thermometer
(1) put right in front of center ventilation louver and a
wet and dry bulb thermometer (2) near air inlet of
HVAC unit.
321
4
6
5
I7RW01721006-01
2
1
I5RW0A721008-01
Page 1062 of 1556

Downloaded from www.Manualslib.com manuals search engine 8B-23 Air Bag System:
Serial Data Link Circuit CheckS6RW0D8204051
Wiring Diagram
1
2
3
3
18
12V
RED 7
14 9
10
“L313”
“G273”
YEL/BLKL04-2
L04-27 “L04”
PPL/WHT
“G04”L04-3212V
8
GRN
15
+BB
56WHTWHT
4
BLUBLU
BLK
16
11
12
“G241”
13
BLK
L04-28
RED/BLK
WHT/REDYEL/BLK
BLK“G271”
“G272”
WHT/RED
BLK/
ORNBLK
B
C
A A
A
17
[A]
A
[B]
12V
PPL/WHTYEL14
17A
A
YELL04-37
12V
I6RW0C820006-01
[A]: Junction block with BCM model 4. Individual circuit fuse box No.1 12. “METER” fuse
[B]: Junction block without BCM model (That
is, TAIWAN spec model)5. “IGN” fuse 13. “A/B” fuse
A: Serial data circuit 6. Ignition switch 14. BCM
B: DLC power supply circuit 7. Combination meter 15. Data link connector (DLC)
C: DLC ground circuit 8. “AIR BAG” warning light 16. Ground for air system
1. Battery 9. Light driver 17. To HVAC control module (auto A/C model)
2. Main fuse 10. Junction block assembly 18. SDM
3. Fuse 11. “DOME” fuse
Page 1176 of 1556

Downloaded from www.Manualslib.com manuals search engine 9A-9 Wiring Systems:
How to Read Power Supply DiagramS6RW0D9101007
Refer to “Power Supply Diagram”.
Refer to “System Circuit Diagram”.
How to Read System Circuit DiagramS6RW0D9101008
The circuit diagram is designed so the current flows from the top of the diagram (power source) to the bottom of the
diagram (ground) as if giving an image of water flow.
[A]: Fuse No.
[B]: Circuit jumping page / direction
NOTE
This means “Jump to the page directed with the arrow(s) by their number.
(For example:” Two arrows directing left” means” Jump to two pages before”.)
You will find the same symbol with the arrows directing opposite in the referenced page. The circuit
continues between the symbols.
[C]: Circuit jumping point / direction
NOTE
The circuit continues to the same symbol with opposite direction within the page.
You will find the other symbol in the direction of the arrow.
Connection to the system
indicated. "POWER SUPPLY DIAGRAM"
-+
1
Battery
80A
215A315A415A525A67850A 30A2930A3215A
960A
60A
BLK
YEL/BLKPNK/BLKLT GRNYEL/GRNYEL/BLUBLK/WHTWHT/BLKWHT/GRNREDGRNWHT
WHT/BLUWHT/REDWHT/BLUWHT/YELWHT/GRN
WHT/GRNWHT/GRN
BLU
BLU/REDRED
YELBLU/RED Individual
circuit
fuse box Main fuse boxSupplementary fuse box
11
11
243
121314151617181920212932
1213141516171819202115A 15A 15A 20A 20A 15A 15A 15A 15A 15A 15A E44321
B011E451E4021
FuseRED/YEL YEL WHT/GRN
15A
15A 1317
"SYSTEM CIRCUIT DIAGRAM"
Fuse number
12
RY
I5RW0A910993-02