torque YAMAHA GRIZZLY 700 2012 User Guide
[x] Cancel search | Manufacturer: YAMAHA, Model Year: 2012, Model line: GRIZZLY 700, Model: YAMAHA GRIZZLY 700 2012Pages: 172, PDF Size: 6.38 MB
Page 118 of 172
![YAMAHA GRIZZLY 700 2012 User Guide 8-29
85. Refill with the recommended final gear oil to
the brim of the check hole as shown. NOTICE:
Be sure no foreign material enters the final
gear case.
[ECB00421]
6. Check the oil level check bol YAMAHA GRIZZLY 700 2012 User Guide 8-29
85. Refill with the recommended final gear oil to
the brim of the check hole as shown. NOTICE:
Be sure no foreign material enters the final
gear case.
[ECB00421]
6. Check the oil level check bol](/img/51/50467/w960_50467-117.png)
8-29
85. Refill with the recommended final gear oil to
the brim of the check hole as shown. NOTICE:
Be sure no foreign material enters the final
gear case.
[ECB00421]
6. Check the oil level check bolt gasket and the
oil filler bolt gasket for damage, and replace
them if necessary.
7. Install the oil level check bolt, the oil filler bolt
and their gasket, and then tighten the bolts to
the specified torques.
8. Check the final gear case for oil leakage. If oil
is leaking, check for the cause.EBU23426Differential gear oil The differential gear case must be checked for oil
leakage before each ride. If any leakage is found,
have a Yamaha dealer check and repair the ATV.
In addition, the differential gear oil level must be
checked and the oil changed as follows at the in-
tervals specified in the periodic maintenance and
lubrication chart. Tightening torque:
Final gear oil drain bolt:
23 Nm (2.3 m·kgf, 17 ft·lbf)
1. Final gear oil
2. Gasket
3. Final gear oil level check bolt
4. Correct oil levelRecommended final gear oil:
See page 10-1.
1
243
Tightening torques:
Final gear oil level check bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
Final gear oil filler bolt:
23 Nm (2.3 m·kgf, 17 ft·lbf)
U1HP60E0.book Page 29 Monday, April 11, 2011 7:56 PM
Page 119 of 172

8-30
8 To check the differential gear oil level
1. Place the ATV on a level surface.
2. Remove the differential gear oil filler bolt and
its gasket, and then check the oil level in the
differential gear case. The oil level should be
at the brim of the filler hole.
3. If the oil is below the brim of the filler hole, add
sufficient oil of the recommended type to raise
it to the correct level.
4. Check the gasket for damage, and replace it if
necessary.5. Install the oil filler bolt and its gasket, and then
tighten the bolt to the specified torque.
To change the differential gear oil
1. Place the ATV on a level surface.
2. Place an oil pan under the differential gear
case to collect the used oil.
3. Remove the differential gear oil filler bolt, the
differential gear oil drain bolt and their gasket
to drain the oil from the differential gear case.
1. Differential gear oil filler bolt
2. Gasket
3. Differential gear oil
4. Correct oil level
1
2
3
4
Tightening torque:
Differential gear oil filler bolt:
23 Nm (2.3 m·kgf, 17 ft·lbf)
U1HP60E0.book Page 30 Monday, April 11, 2011 7:56 PM
Page 120 of 172

8-31
84. Install the drain bolt and its new gasket, and
then tighten the bolt to the specified torque.
5. Refill with the recommended differential gear
oil to the brim of the filler hole as shown.
NOTICE: Be sure no foreign material en-
ters the differential gear case.
[ECB00411]
6. Check the oil filler bolt gasket for damage, and
replace it if necessary.
7. Install the oil filler bolt and its gasket, and then
tighten the bolt to the specified torque.
1. Differential gear oil drain bolt
2. GasketTightening torque:
Differential gear oil drain bolt:
9.8 Nm (0.98 m·kgf, 7.1 ft·lbf)
12
1. Differential gear oil filler bolt
2. Gasket
3. Differential gear oil
4. Correct oil levelRecommended differential gear oil:
See page 10-1.
Tightening torque:
Differential gear oil filler bolt:
23 Nm (2.3 m·kgf, 17 ft·lbf)
1
2
3
4
U1HP60E0.book Page 31 Monday, April 11, 2011 7:56 PM
Page 124 of 172

8-35
86. Remove the radiator cap.
7. Remove the coolant reservoir cap.
8. Disconnect the coolant reservoir hose on the
coolant reservoir side, and then drain the cool-
ant from the coolant reservoir.9. After draining the coolant, thoroughly flush the
cooling system with clean tap water.
10. Install the coolant drain bolt and its new gas-
ket, and then tighten the bolt to the specified
torque.
11. Connect the coolant reservoir hose.
12. Pour the recommended coolant into the radia-
tor until it is full.
1. Radiator cap
1. Coolant reservoir hoseTightening torque:
Coolant drain bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
U1HP60E0.book Page 35 Monday, April 11, 2011 7:56 PM
Page 125 of 172

8-36
8 13. Pour the recommended coolant into the reser-
voir to the maximum level mark, and then in-
stall the reservoir cap. NOTICE: Mix
antifreeze with distilled water only. Howev-
er, if distilled water is not available, soft
water may be used for refilling. Do not use
hard water or salt water since they are
harmful to the engine.
[ECB00991]
14. Loosen the water pump air bleed bolt, without
removing it, to allow all of the air to escape
from the air bleed bolt hole.15. When coolant begins to flow out of the bolt
hole, tighten the water pump air bleed bolt to
the specified torque.
16. Remove panel E. (See page 8-10.)
17. Loosen the clamp screw, and then remove the
V-belt cooling duct. Antifreeze/water mixture ratio:
1:1
Recommended antifreeze:
High-quality ethylene glycol antifreeze con-
taining corrosion inhibitors for aluminum en-
gines
Coolant quantity:
Radiator capacity (including all routes):
1.99 L (2.10 US qt, 1.75 Imp.qt)
Coolant reservoir capacity (up to the maxi-
mum level mark):
0.24 L (0.25 US qt, 0.21 Imp.qt)
1. Water pump air bleed boltTightening torque:
Water pump air bleed bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
1
U1HP60E0.book Page 36 Monday, April 11, 2011 7:56 PM
Page 126 of 172

8-37
818. Loosen the cylinder head air bleed bolt, with-
out removing it, to allow all of the air to escape
from the air bleed bolt hole.19. When coolant begins to flow out of the bolt
hole, tighten the cylinder head air bleed bolt to
the specified torque.
20. Start the engine and let it idle for ten minutes.
21. Rev the engine five times.
22. Pour the recommended coolant into the radia-
tor until it is full.
1. V-belt cooling duct
2. Clamp screw
1. Cylinder head air bleed boltTightening torque:
Cylinder head air bleed bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
U1HP60E0.book Page 37 Monday, April 11, 2011 7:56 PM
Page 127 of 172

8-38
8 23. Stop the engine and allow it to cool. If the cool-
ant level has dropped after the engine has
cooled, add sufficient coolant until it reaches
the top of the radiator, and then install the ra-
diator cap.
24. Start the engine, and then check for coolant
leakage.
TIPIf any leakage is found, have a Yamaha dealer
check the cooling system.25. Install the V-belt cooling duct, and then tighten
the clamp screw.
26. Install the footboard by installing the bolts and
nuts, and then tighten them to the specified
torques.
27. Install the panels.
1. Footboard nut
2. Footboard bolt A
3. Footboard bolt BTightening torques:
Footboard nut:
4.0 Nm (0.40 m·kgf, 2.9 ft·lbf)
Footboard bolt A:
4.0 Nm (0.40 m·kgf, 2.9 ft·lbf)
Footboard bolt B:
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
3
1
2
1
U1HP60E0.book Page 38 Monday, April 11, 2011 7:56 PM
Page 132 of 172

8-43
82. Remove the tailpipe by pulling it out of the
muffler, and then remove the gasket.
3. Tap the tailpipe lightly, and then use a wire
brush to remove any carbon deposits from the
spark arrester portion of the tailpipe and inside
of the tailpipe housing.4. Check the gasket for damage, and replace it if
necessary.
5. Install the gasket, and then insert the tailpipe
into the muffler and align the bolt holes.
6. Install the bolts and tighten them to the speci-
fied torque.
7. Remove the purging bolt and its gasket.
1. Tailpipe bolt
1. Tailpipe
2. Spark arrester
3. GasketTightening torque:
Tailpipe bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
U1HP60E0.book Page 43 Monday, April 11, 2011 7:56 PM
Page 133 of 172

8-44
8 8. Start the engine and rev it up approximately
twenty times while momentarily creating ex-
haust system back pressure by blocking the
end of the muffler with a shop towel.
9. Stop the engine and allow the exhaust pipe to
cool.
10. Check the gasket for damage, and replace it if
necessary.
11. Install the purging bolt and its gasket, and
then tighten the bolt to the specified torque.
WARNING
EWB02380Never run the engine in an enclosed area when
purging the spark arrester, otherwise it could
cause injury to the eyes, burns, carbon monox-
ide poisoning, possibly leading to death, and
start a fire.Always let the exhaust system cool prior to
touching exhaust components.Always wear eye protection, and make sure
no one is behind the ATV.Make sure there are no combustible materi-
als in the area.EBU23931V-belt case drain plug After riding in water deep enough to allow it to en-
ter the V-belt case, remove the V-belt case drain
plug to drain the water from the case.
1. Purging bolt
2. Gasket
2
Tightening torque:
Purging bolt:
27 Nm (2.7 m·kgf, 20 ft·lbf)
U1HP60E0.book Page 44 Monday, April 11, 2011 7:56 PM
Page 148 of 172

8-59
82. Connect the positive battery lead first, then
connect the negative battery lead by installing
their bolt. NOTICE: When installing the bat-
tery, the main switch must be off, and the
positive lead must be connected before
the negative lead.
[ECB01110]
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.5. Install the panel.
EBU30520Replacing a fuse
1. Positive battery lead (red)
2. Negative battery lead (black)
12
Tightening torques:
Carrier bolt (top):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)1. Fuse box
2. Main fuse
3. EPS fuse
4. Fuel injection system spare fuse
5. Fuel injection system fuse
U1HP60E0.book Page 59 Monday, April 11, 2011 7:56 PM