fuel YAMAHA WR 450F 2006 User Guide
[x] Cancel search | Manufacturer: YAMAHA, Model Year: 2006, Model line: WR 450F, Model: YAMAHA WR 450F 2006Pages: 786, PDF Size: 22.49 MB
Page 80 of 786

1 - 25
GEN
INFO
BREAK-IN PROCEDURES
1. Before starting the engine, fill the fuel tank
with the fuel.
2. Perform the pre-operation checks on the
machine.
3. Start and warm up the engine. Check the
idle speed, and check the operation of the
controls and the “ENGINE STOP” button.
Then, restart the engine and check its
operation within no more than 5 minutes
after it is restarted.
4. Operate the machine in the lower gears at
moderate throttle openings for five to eight
minutes.
5. Check how the engine runs when the
machine is ridden with the throttle 1/4 to 1/2
open (low to medium speed) for about one
hour.
6. Restart the engine and check the operation
of the machine throughout its entire operat-
ing range. Restart the machine and oper-
ate it for about 10 to 15 more minutes. The
machine will now be ready to race.
CAUTION:
After the break-in or before each race,
you must check the entire machine for
loose fittings and fasteners as per
“TORQUE-CHECK POINTS”.
Tighten all such fasteners as required.
When any of the following parts have
been replaced, they must be broken in.
CYLINDER AND CRANKSHAFT:
About one hour of break-in operation is
necessary.
PISTON, RING, VALVES, CAMSHAFTS
AND GEARS:
These parts require about 30 minutes of
break-in operation at half-throttle or less.
Observe the condition of the engine care-
fully during operation.
STARTING AND BREAK-IN
Page 82 of 786

GEN
INFO
1 - 26
TORQUE-CHECK POINTS
TORQUE-CHECK POINTS
NOTE:
Concerning the tightening torque, refer to
“MAINTENANCE SPECIFICATIONS” section
in the CHAPTER 2.
Frame to rear frame
Fuel tank to frame
Silencer to rear frame
Frame to engine
Engine bracket to engine
Engine bracket to frame
Steering shaft to frame
Steering shaft to handle crown
Handle crown to handlebar
Front fork to handle crown
Front fork to under bracket
Assembly of links
Link to frame
Link to shock absorber
Link to swingarm
Shock absorber to frame
Tightening of pivot shaft
Tightening of front axle
Tightening of axle holder
Tightening of rear axle
Wheel to sprocket
Caliper to front fork
Brake disc to wheel
Tightening of union bolt
Master cylinder to handlebar
Tightening of air bleeder
Tightening of brake hose holder
Brake pedal to frame
Brake disc to wheel
Tightening of union bolt
Master cylinder to frame
Tightening of air bleeder
Tightening of brake hose holder
Fuel tank to fuel cock
Tightening of oil hose clamp Frame construction
Combined seat and tank
Exhaust system
Engine mounting
Steering Steering shaft to
handlebar
Suspension Front Steering shaft to front
fork
Rear For link type
Rear Installation of shock
absorber
Rear Installation of
swingarm
Wheel Installation of wheel Front
Rear
Brake Front
Rear
Fuel system
Lubrication system
Page 88 of 786

1 - 28
GEN
INFO
CLEANING AND STORAGE
8. Automotive wax may be applied to all
painted or chromed surfaces. Avoid combi-
nation cleaner-waxes, as they may contain
abrasives.
9. After completing the above, start the
engine and allow it to idle for several min-
utes.
EC1B2001
STORAGE
If your machine is to be stored for 60 days or
more, some preventive measures must be
taken to avoid deterioration. After cleaning the
machine thoroughly, prepare it for storage as
follows:
1. Drain the fuel tank, fuel lines, and the car-
buretor float bowl.
2. Remove the spark plug, pour a tablespoon
of SAE 10W-30 motor oil in the spark plug
hole, and reinstall the plug. With the engine
stop switch pushed in, kick the engine over
several times to coat the cylinder walls with
oil.
3. Remove the drive chain, clean it thoroughly
with solvent, and lubricate it. Reinstall the
chain or store it in a plastic bag tied to the
frame.
4. Lubricate all control cables.
5. Block the frame up to raise the wheels off
the ground.
6. Tie a plastic bag over the exhaust pipe out-
let to prevent moisture from entering.
7. If the machine is to be stored in a humid or
salt-air environment, coat all exposed
metal surfaces with a film of light oil. Do not
apply oil to rubber parts or the seat cover.
NOTE:
Make any necessary repairs before the
machine is stored.
Page 90 of 786

SPEC
2 - 1
EC200000
SPECIFICATIONS
EC211000
GENERAL SPECIFICATIONS
Model name: WR450FV (USA, CDN, AUS, NZ)
WR450F (EUROPE, ZA)
Model code number: 5TJB (USA)
5TJC (EUROPE)
5TJD (CDN, AUS, NZ, ZA)
Dimensions: USA, ZA, CDN EUROPE, AUS, NZ
Overall length 2,200 mm (86.61 in) 2,195 mm (86.42 in)
Overall width 830 mm (32.68 in)←
Overall height 1,295 mm (50.98 in)←
Seat height 985 mm (38.78 in) 990 mm (38.98 in)
Wheelbase 1,490 mm (58.66 in)←
Minimum ground clearance 370 mm (14.57 in)←
Dry weight:
Without oil and fuel 113.0 kg (249.1 lb)
Engine:
Engine type Liquid cooled 4-stroke, DOHC
Cylinder arrangement Single cylinder, forward inclined
Displacement 449 cm
3 (15.8 Imp oz, 15.2 US oz)
Bore × stroke 95.0 × 63.4 mm (3.74 × 2.50 in)
Compression ratio 12.3 : 1
Starting system Kick and electric starter
Lubrication system: Dry sump
Oil type or grade:
Engine oil (For USA and CDN)
At 5 °C (40 °F) or higher È
Yamalube 4 (20W-40) or SAE 20W-40 type SG
motor oil (Non-Friction modified)
At 15 °C (60 °F) or lower É
Yamalube 4 (10W-30) or SAE 10W-30 type SG
motor oil (Non-Friction modified) and/or
Yamalube 4-R (15W-50) (Non-Friction modi-
fied)
(Except for USA and CDN)
API “SG” or higher grade
-20
-4-10
140
3010
5020
6830
8640 50
104
122˚CTemp.
˚F
10W-30
10W-40
20W-40
20W-50
15W-40
GENERAL SPECIFICATIONS
Page 91 of 786

SPEC
2 - 2 Oil capacity:
Engine oil
Periodic oil change 1.0 L (0.88 Imp qt, 1.06 US qt)
With oil filter replacement 1.1 L (0.97 Imp qt, 1.16 US qt)
Total amount 1.2 L (1.06 Imp qt, 1.27 US qt)
Coolant capacity (including all routes): 1.56 L (1.37 Imp qt, 1.65 US qt)
Air filter: Wet type element
Fuel:
Type Premium unleaded gasoline only with a
research octane number of 95 or higher.
Tank capacity 8.0 L (1.76 Imp gal, 2.11 US gal)
Reserve 1.1 L (0.24 Imp gal, 0.29 US gal)
Carburetor:
Type FCR MX39
Manufacturer KEIHIN
Spark plug:
Type/manufacturer CR8E/NGK (resistance type)
Gap 0.7 ~ 0.8 mm (0.028 ~ 0.031 in)
Clutch type: Wet, multiple-disc
Transmission:
Primary reduction system Gear
Primary reduction ratio 62/22 (2.818)
Secondary reduction system Chain drive
Secondary reduction ratio 50/14 (3.571)
Transmission type Constant mesh, 5-speed
Operation Left foot operation
Gear ratio: 1st 29/12 (2.416)
2nd 26/15 (1.733)
3rd 21/16 (1.312)
4th 21/20 (1.050)
5th 21/25 (0.840)
Chassis: USA, ZA, CDN EUROPE, AUS, NZ
Frame type Semi double cradle←
Caster angle 27.4°27.3°
Trail 120 mm (4.72 in) 119 mm (4.69 in)
Tire:
Type With tube
Size (front) 80/100-21 51M (USA, CDN, ZA)
90/90-21 54R (EUROPE, AUS, NZ)
Size (rear) 110/100-18 64M (USA, CDN, ZA)
130/90-18 69R (EUROPE, AUS, NZ)
Tire pressure (front and rear) 100 kPa (1.0 kgf/cm
2, 15 psi)
GENERAL SPECIFICATIONS
2
Page 105 of 786

SPEC
2 - 16 Part to be tightened Thread size Q’tyTightening torque
Nm m·kg ft·lb
Rear wheel axle and nut M20 × 1.5 1 125 12.5 90
Driven sprocket and wheel hub M8 × 1.25 6 50 5.0 36
Nipple (spoke)—72 3 0.3 2.2
Disc cover and rear brake caliper M6 × 1.0 2 7 0.7 5.1
Protector and rear brake caliper M6 × 1.0 2 7 0.7 5.1
Chain puller adjust bolt and locknut M8 × 1.25 2 16 1.6 11
Engine mounting:
Engine upper bracket and frame M10 × 1.25 2 55 5.5 40
Engine lower bracket and frame M8 × 1.25 4 34 3.4 24
Engine and engine bracket (front) M10 × 1.25 1 69 6.9 50
Engine and engine bracket (upper) M10 × 1.25 1 52 5.2 37
Engine and frame (lower) M10 × 1.25 1 69 6.9 50
Engine guard (left and right) M8 × 1.25 2 23 2.3 17
Engine skid plate mounting (front) M6 × 1.0 3 10 1.0 7.2
Engine skid plate mounting (rear) M6 × 1.0 3 10 1.0 7.2
Regulator mounting M6 × 1.0 2 7 0.7 5.1
Pivot shaft and nut M16 × 1.5 1 80 8.0 58
Relay arm and swingarm M14 × 1.5 1 70 7.0 50
Relay arm and connecting rod M14 × 1.5 1 80 8.0 58
Connecting rod and frame M14 × 1.5 1 80 8.0 58
Rear shock absorber and frame M10 × 1.25 1 56 5.6 40
Rear shock absorber and relay arm M10 × 1.25 1 53 5.3 38
Rear frame and frame (upper) M8 × 1.25 1 32 3.2 23
Rear frame and frame (lower) M8 × 1.25 2 29 2.9 21
Swingarm and brake hose holder M5 × 0.8 4 2 0.2 1.4
Swingarm and patch M4 × 0.7 4 2 0.2 1.4
Drive chain tensioner mounting (upper) M8 × 1.25 1 19 1.9 13
Drive chain tensioner mounting (lower) M8 × 1.25 1 20 2.0 14
Chain support and swingarm M6 × 1.0 3 7 0.7 5.1
Seal guard and swingarm M5 × 0.8 4 6 0.6 4.3
Fuel tank mounting M6 × 1.0 2 10 1.0 7.2
Fuel tank and fuel cock M6 × 1.0 2 6 0.6 4.3
Fuel tank and seat set bracket M6 × 1.0 1 7 0.7 5.1
Fuel tank and hooking screw (fitting band) M6 × 1.0 1 7 0.7 5.1
Fuel tank and fuel tank bracket M6 × 1.0 4 7 0.7 5.1
Seat mounting M8 × 1.25 2 23 2.3 17
Side cover mounting M6 × 1.0 2 7 0.7 5.1
Air scoop and fuel tank M6 × 1.0 6 7 0.7 5.1
Air scoop and radiator panel (lower) M6 × 1.0 2 6 0.6 4.3
Front fender mounting M6 × 1.0 4 7 0.7 5.1
Rear fender mounting (front) M6 × 1.0 2 7 0.7 5.1
Rear fender mounting (rear) M6 × 1.0 2 11 1.1 8.0
Multi-function display bracket mounting M6 × 1.0 2 7 0.7 5.1
MAINTENANCE SPECIFICATIONS
Page 174 of 786

2 - 23
SPECCABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1Fuel tank breather hose
2Clamp
3Diode
4Wire harness
5Hot starter cable
6Negative battery lead
7Starter motor lead
8TPS (throttle position sensor)
lead
9Cylinder head breather hose
0Neutral switch lead
AOil hose
BAC magneto lead
COil tank breather hose
DRectifier/regulator lead
EBrake hose
FHose guideGCarburetor breather hose
HOverflow hose
ICoolant reservoir tank breather
hose
ÈInsert the fuel tank breather
hose into the hole in the steer-
ing shaft cap.
ÉUsing a plastic locking tie and
fasten the diode of the wire har-
ness (at the white tape) to the
frame, and cut off the tie end.ÊFasten the wire harness, cool-
ant reservoir hose and hot
starter cable to the frame with a
plastic locking tie and cut off the
tie end.
ËFasten the wire harness and
coolant reservoir hose to the
frame with a plastic locking tie
and cut off the tie end.
ÌFasten the wire harness to the
frame at its white tape with a
plastic locking tie and cut off the
tie end.
2
Ù
B
BA
B-B
A
A
0Ò2
Ñ2 B ÓC Ô D
EFÕÖ2
×2F
1
È
2
É
3
2
Ê
452
Ë
2
Ì2
Í
6
7
Î
2
Ï
8
9
0
A 2
ÐØ GG
HI
Page 189 of 786

3 - 2
INSP
ADJ
MAINTENANCE INTERVALS
ROTOR NUT
Retighten
MUFFLER
Inspect and retighten
Clean
Replace * Whichever comes first
*SPARK ARRESTER
(Every six
months)
Clean
CRANK
Inspect and clean
CARBURETOR
Inspect, adjust and clean
AIR INDUCTION SYSTEM
Inspect and clean
SPARK PLUG
Inspect and clean
Replace
DRIVE CHAIN
Use chain lube
Chain slack: 48 ~ 58 mm
(1.9 ~ 2.3 in) Lubricate, slack, alignment
Replace
COOLING SYSTEM
Check coolant level and leakage
Check radiator cap operation
Replace coolant Every two years
Inspect hoses
OUTSIDE NUTS AND BOLTS Refer to “STARTING
AND BREAK-IN” section
in the CHAPTER 1. Retighten
AIR FILTER
Use foam air-filter oil or
equivalent oil Clean and lubricate
Replace
OIL FILTER
Replace
OIL STRAINER (frame)
Clean
FRAME
Clean and inspect
FUEL TANK, COCK
Clean and inspect
BRAKES
Adjust lever position and pedal height
Lubricate pivot point
Check brake disc surface
Check fluid level and leakage
Retighten brake disc bolts, caliper
bolts, master cylinder bolts and union
bolts
Replace pads
Replace brake fluid Every one yearItemAfter
break-inEvery
race
Every
third
(or
500 km)Every
fifth
(or
1,000 km)As re-
quiredRemarks
3
Page 200 of 786

3 - 4
INSP
ADJ
PRE-OPERATION INSPECTION AND MAINTENANCE
EC320000
PRE-OPERATION INSPECTION AND MAINTENANCE
Before riding for break-in operation, practice or a race, make sure the machine is in good operating
condition.
Before using this machine, check the following points.
GENERAL INSPECTION AND MAINTENANCE
Item Routine Page
CoolantCheck that coolant is filled up to the radiator filler cap.
Check the cooling system for leakage.P.3-5 ~ 9
FuelCheck that a fresh gasoline is filled in the fuel tank. Check the
fuel line for leakage.P.1-21
Engine oilCheck that the oil level is correct. Check the crankcase and
frame oil line for leakage.P.3-14 ~ 18
Gear shifter and clutchCheck that gears can be shifted correctly in order and that the
clutch operates smoothly.P.3-10
Throttle grip/HousingCheck that the throttle grip operation and free play are correctly
adjusted. Lubricate the throttle grip and housing, if necessary.P.3-10 ~ 11
Brakes Check the play of front brake and effect of front and rear brake. P.3-25 ~ 31
ChainCheck chain slack and alignment. Check that the chain is lubri-
cated properly.P.3-32 ~ 35
WheelsCheck for excessive wear and tire pressure. Check for loose
spokes and have no excessive play.P.3-43 ~ 44
SteeringCheck that the handlebar can be turned smoothly and have no
excessive play.P.3-44 ~ 46
Front forks and rear shock
absorberCheck that they operate smoothly and there is no oil leakage. P.3-35 ~ 42
Cables (wires)Check that the clutch and throttle cables move smoothly. Check
that they are not caught when the handlebars are turned or when
the front forks travel up and down.—
Muffler Check that the muffler is tightly mounted and has no cracks.—
Sprocket Check that the driven sprocket tightening bolt is not loose. P.3-32
Lubrication Check for smooth operation. Lubricate if necessary. P.3-47
Bolts and nuts Check the chassis and engine for loose bolts and nuts. P.1-26
Lead connectorsCheck that the AC magneto, CDI unit, and ignition coil are con-
nected tightly.P.1-6
SettingsIs the machine set suitably for the condition of the racing course
and weather or by taking into account the results of test runs
before racing? Are inspection and maintenance completely
done?P.7-1 ~ 20
Page 206 of 786

3 - 6
INSP
ADJ
COOLANT REPLACEMENT
CAUTION:
Take care so that coolant does not splash
on painted surfaces. If it splashes, wash it
away with water.
1. Place a container under the engine.
2. Remove:
Seat
Refer to “SEAT, FUEL TANK AND SIDE
COVERS” section in the CHAPTER 4.
3. Disconnect:
Coolant reservoir hose 1
Drain the coolant completely.
4. Connect:
Coolant reservoir hose
LOWFULLCOOLANT1
5. Remove:
Engine guard 1
Coolant drain bolt 2
6. Remove:
Radiator cap
Drain the coolant completely.
7. Clean:
Cooling system
Thoroughly flush the cooling system with
clean tap water.
8. Install:
Copper washer
Coolant drain bolt
Engine guard
Bolt [engine guard (front)]
Bolt [engine guard (rear)]
New
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
T R..34 Nm (3.4 m · kg, 24 ft · lb)
T R..23 Nm (2.3 m · kg, 17 ft · lb)