brake YAMAHA YZ125LC 2001 Betriebsanleitungen (in German)
[x] Cancel search | Manufacturer: YAMAHA, Model Year: 2001, Model line: YZ125LC, Model: YAMAHA YZ125LC 2001Pages: 558, PDF-Größe: 13.11 MB
Page 116 of 558

2-13
SPECCABLE ROUTING DIAGRAM
EC240000
1Brake hose
2Fuel tank breather hose
3Cable guide
4Clamp
5“ENGINE STOP” button lead
6Throttle cable
7Air vent hose (right)
8Air vent hose (left)
9Transmission oil breather
hose
0Overflow hose
qRadiator breather hose
wCDI magneto lead
eYPVS breather hose
APass the fuel tank breather
hose between the handlebar
and tension bar, then insert
its end into the hole of the
number plate.
BPass the throttle cable and
“ENGINE STOP” button lead
into the cable guide. Align
with the cable guide the
front end of the tape on the
throttle cable.CClamp the throttle cable and
“ENGINE STOP” button lead
to the frame. With the clamp
ends downward, tighten the
throttle cable to the extent
that it moves smoothly.
DClamp the “ENGINE STOP”
button lead (where there is
no protector), wireharness and
throttle cable all together to the
frame. With the clamp ends
downward, pass the
wireharness on the outer side
of the chassis in relation to the
“ENGINE STOP” button lead.
EPass the air vent hose at
the rear of the throttle cable.
FPass the transmission oil
breather hose, air vent hoses
and overflow hose between
the frame and connecting rod.
GPass the radiator breather
hose and YPVS breather hose
outside the engine bracket
and inside the frame. Then
pass the radiator breather hose inside the YPVS
breather hose.
HClamp the radiater breather
hose and CDI magneto lead
on the rear of the down-tube.
IPass the radiater breather
hose and CDI magneto
lead between the frame and
radiator.
JAlign the top of the brake hose
neck with the brake hose
holder bottom.
KPass the brake hose in front
of the axle boss, then fit it
into the hose groove so that
the brake hose does not
contact the nut (wheel axle).
LFit the brake hose into the
guide on the protector.
MPass the throttle cable and
“ENGINE STOP” button lead
over the radiator hose.
NTighten the clamp with its
ends sideways as shown.
5MV-9-30-2B 6/19/00 1:14 PM Page 26
Page 118 of 558

2-14
SPECCABLE ROUTING DIAGRAM
1Brake hose holder
2Master cylinder
3Brake hose
4Hose guide
5CDI unit band
6CDI unit
7High tension cord
8Ignition coil
9Cable guide
0Radiator breather hose
qWireharness
w“ENGINE STOP” button lead
eCDI magneto lead
rClutch cable
tClamp
yCDI unit bracket
uEngine bracket
iCDI unit damper
APass the brake hose into
the brake hose holder.BIf the brake hose contacts
the spring (rear shock
absorber), correct its twist.
CInstall the brake hose so that
its pipe portion directs as
shown and lightly touches
the projection on the master
cylinder.
DPass the reservoir hose
between the brake hose and
swingarm bracket.
EPut the CDI unit fully in
the CDI unit band.
FFasten the ground lead
together with the ignition
coil.
GPass the cluch cable into
the cable guide.
HClamp the CDI magneto lead
on the upper part of
the frame gusset at its
protecting tube.IPass the clutch cable over
the radiator hose.
JClamp the wireharness on
the top of the CDI unit with
the clamp end downward.
KCut the clamp end to be flush
with CDI unit side.
LFit the CDI unit band over
the CDI unit bracket till it
stops.
MInstall the brake hose to
the caliper with the paint on
the pipe facing the caliper
and with the pipe contacting
the caliper projection.
NPass the radiator breather
hose between the frame and
radiator hose so that it is not
kinked or wedged.
OPosition the CDI unit between
the engine brackets as
shown.
5MV-9-30-2B 6/19/00 1:14 PM Page 28
Page 120 of 558

2-15
SPECCABLE ROUTING DIAGRAM
AInstall the brake hose so that its pipe portion
directs as show and lightly touches the
projection on the master cylinder.
BPass the “ENGINE STOP” button lead in
the middle of the clutch holder.
CPass the clutch cable in front of the throttle
cable.
DClamp the “ENGINE STOP” button lead to
the handlebar to 3 clicks.
EPass the brake hose in front of the number
plate and through the cable guide.
FCross the clutch cable and throttle cable
over the number plate boss. 1Brake hose
2Master cylinder
3“ENGINE STOP” button lead
4“ENGINE STOP” button
5Throttle cable
6Clutch cable
7Clamp
8Cable guide
5MV-9-30-2B 6/19/00 1:14 PM Page 30
Page 123 of 558

3-2
MAINTENANCE INTERVALS
INSP
ADJ
Item Remarks
COOLING SYSTEM
Check coolant level and leakagell
Check radiator cap operationl
Replace coolantlEvery two years
Inspect hosesl
OUTSIDE NUTS AND BOLTS Refer to “STARTING
RetightenllAND BREAK-IN” section
in the CHAPTER 1.
AIR FILTER
Clean and lubricatellUse foam air-filter oil
Replacel
FRAME
Clean and inspectll
FUEL TANK, COCK
Clean and inspectll
BRAKES
Adjust lever position and pedal heightll
Lubricate pivot pointll
Check brake disc surfacell
Check fluid level and leakagell
Retighten brake disc bolts, caliper bolts,
ll
master cylinder bolts and union bolts
Replace padsl
Replace brake fluidlEvery one year
FRONT FORKS
Inspect and adjustll
Replace oilllSuspension oil “01”
Replace oil seall
FRONT FORK OIL SEAL AND DUST SEAL
Clean and lubellLithium base grease
REAR SHOCK ABSORBER
Inspect and adjustll
Lube ll
Molybdenum disulfide grease
Retightenll
CHAIN GUARD AND ROLLERS
Inspectll
SWINGARM
Inspect and retightenll
RELAY ARM, CONNECTING ROD
Inspect and lubellMolybdenum disulfide grease
STEERING HEAD
Inspect free play and retightenll
Clean and lubelLithium base grease
Replace bearingl
TIRE, WHEELS
Inspect air pressure, wheel run-out,
ll
tire wear and spoke looseness
Retighten sprocket boltll
Inspect bearingsl
Replace bearingsl
LubricatelLithium base grease
THROTTLE, CONTROL CABLE
Check routing and connectionllYamaha cable lube or
LubricatellSAE 10W-30 motor oil
After
break-
inEvery
raceEvery
thirdEvery
fifthAs re-
quired
3
5MV-9-30-3A 6/19/00 1:52 PM Page 3
Page 134 of 558

3-4
PRE-OPERATION INSPECTION AND MAINTENANCE
INSP
ADJ
EC320000
PRE-OPERATION INSPECTION AND MAINTENANCE
Before riding for break-in operation, practice or a race, make sure the machine is in good operating
condition.
Before using this machine, check the following points.
EC321000
GENERAL INSPECTION AND MAINTENANCE
Item Routine Page
Coolant Check that coolant is filled up to the radiator filler cap.
Check the cooling system for leakage.P3-5~9
Fuel Check that a fresh mixture of oil and gasoline is filled in
the fuel tank. Check the fuel line for leakage.P1-12
Transmission oil Check that the oil level is correct. Check the crankcase
for leakage.P3-12~14
Gear shifter and clutch Check that gears can be shifted correctly in order and
that the clutch operates smoothly.P3-9
Throttle grip/Housing Check that the throttle grip operation and free play
are correctly adjusted. Lubricate the throttle grip and P3-10~11
housing, if necessary.
Brakes Check the play of front brake and effect of front and
rear brake.P3-17~23
Chain Check chain slack and alignment. Check that the chain
is lubricated properly.P3-24~26
Wheels Check for excessive wear and tire pressure. Check for
loose spokes and have no excessive play.P3-34~35
Steering Check that the handlebar can be turned smoothly and
have no excessive play.P3-35~36
Front forks and Check that they operate smoothly and there is no oil
rear shock absorber leakage.P3-26~33
Cables (wires) Check that the clutch and throttle cables move smooth-
ly. Check that they are not caught when the handlebars —
are turned or when the front forks travel up and down.
Muffler Check that the muffler is tightly mounted and has no
cracks.P3-15~16
Sprocket Check that the driven sprocket tightening bolt is
not loose.P3-24
Lubrication Check for smooth operation. Lubricate if necessary. P3-37
Bolts and nuts Check the chassis and engine for loose bolts and nuts. P1-16
Lead connectors Check that the CDI magneto, CDI unit, and ignition coil
are connected tightly.P1-6
Settings Is the machine set suitably for the condition of the
racing course and weather or by taking into account the
P7-1~24
results of test runs before racing? Are inspection and
maintenance completely done?
5MV-9-30-3A 6/19/00 1:52 PM Page 14
Page 162 of 558

3-17
INSP
ADJ
CHASSIS/BRAKE SYSTEM AIR BLEEDING
EC360000
CHASSIS
EC361012
BRAKE SYSTEM AIR BLEEDING
w
Bleed the brake system if:
9The system has been disassembled.
9A brake hose has been loosened or removed.
9The brake fluid is very low.
9The brake operation is faulty.
A dangerous loss of braking performance may
occur if the brake system is not properly
bleed.
1. Remove:
9Master cylinder cap
9Diaphragm
9Protector (rear brake)
2. Bleed:
9Brake fluid
Front
Air bleeding steps:
a. Add proper brake fluid to the reservoir.
b. Install the diaphragm. Be careful not to
spill any fluid or allow the reservoir to
overflow.
c. Connect the clear plastic tube 2tightly to
the caliper bleed screw 1.
d. Place the other end of the tube into a
container.
e. Slowly apply the brake lever or pedal
several times.
f. Pull the lever in or push down on the ped-
al. Hold the lever or pedal in position.
g. Loosen the bleed screw and allow the
lever or pedal to travel towards its limit.
h. Tighten the bleed screw when the lever
or pedal limit has been reached; then re-
lease the lever or pedal.
i. Repeat steps (e) to (h) until of the air
bubbles have been removed from the
system.
Bleed screw:
6 Nm (0.6 m•kg, 4.3 ft•lb)
5MV-9-30-3A 6/19/00 1:52 PM Page 42
Page 164 of 558

3-18
INSP
ADJ
FRONT BRAKE ADJUSTMENT
3. Install:
9Protector (rear brake)
9Diaphragm
9Master cylinder cap
EC362040
FRONT BRAKE ADJUSTMENT
1. Check:
9Brake lever position a
2. Adjust:
9Brake lever position
NOTE:
If bleeding is difficult, it may be necessary
to let the brake fluid system stabilize for a
few hours. Repeat the bleeding procedure
when the tiny bubbles in the system have
disappeared.
j. Add brake fluid to the level line on the
reservoir.
w
Check the operation of the brake after
bleeding the brake system.
Brake lever position a a
:
Standard position Extent of adjutment
95 mm (3.74 in)76 ~ 97 mm
(2.99 ~ 3.82 in)
Brake lever position adjustment steps:
9Loosen the locknut 1.
9Turn the adjusting bolt 2until the lever
position a is within specified position.
9Tighten the locknut.
cC
Be sure to tighten the locknut, as it will
cause poor brake performance.
Locknut:
5 Nm (0.5 m•kg, 3.6 ft•lb)
5MV-9-30-3A 6/19/00 1:52 PM Page 44
Page 166 of 558

3-19
REAR BRAKE ADJUSTMENT/
FRONT BRAKE PAD INSPECTION AND REPLACEMENTINSP
ADJ
EC365080
FRONT BRAKE PAD INSPECTION AND
REPLACEMENT
1. Inspect:
9Brake pad thickness a
Out of specification ÕReplace as a set.
2. Replace:
9Brake pad
Brake pad thickness a a
:
Standard
4.4 mm (0.17 in)
1.0 mm (0.04 in)
Brake pad replacement steps:
9Remove the pad pin plug 1.
EC364002
REAR BRAKE ADJUSTMENT
1. Check:
9Brake pedal height a
Out of specificationÕAdjust.
2. Adjust:
9Brake pedal height
Brake pedal height a a
:
5 mm (0.20 in)
Pedal height adjustment steps:
9Loosen the locknut 1.
9Turn the adjusting nut 2until the pedal
height ais within specified height.
9Tighten the locknut.
w
9Adjust the pedal height between the
maximum
and the minimum õ õ
as
shown. (In this adjustment the bolt 3 3
end b b
should protrude out of the lower
adjusting nut 4 4
but not be less than 2
mm (0.08 in) c c
away from the brake ped-
al 5 5
).
9After the pedal height adjustment, make
sure that the rear brake does not drag.
5MV-9-30-3B 6/19/00 1:49 PM Page 2
Page 168 of 558

3-20
FRONT BRAKE PAD INSPECTION AND REPLACEMENT
INSP
ADJ
9Loosen the pad pin 2.
9Remove the brake hose holder 3and
caliper 4from the front fork.
9Remove the pad pin and brake pads 5.
9Connect the transparent hose 6to the
bleed screw 7and place the suitable con-
tainer under its end.
9Loosen the bleed screw and push the
caliper piston in.
cC
Do not reuse the drained brake fluid.
9Tighten the bleed screw.
9Install the brake pads 8and pad pin.
NOTE:
9Install the brake pads with their projections
ainto the caliper recesses b.
9Temporarily tighten the pad pin at this point.
9Install the brake hose holder 9and caliper
0and tighten the pad pin q.
NOTE:
Fit the brake hose holder cut c over the pro-
jection
don the front fork and clamp the
brake hose.
Bleed screw:
6 Nm (0.6 m•kg, 4.3 ft•b)
Bolt (caliper):
23 Nm (2.3 m•kg, 17 ft•lb)
Pad pin:
18 Nm (1.8 m•kg, 13 ft•lb)
5MV-9-30-3B 6/19/00 1:49 PM Page 4
Page 170 of 558

3-21
REAR BRAKE PAD INSPECTION AND REPLACEMENT
INSP
ADJ
3. Inspect:
9Brake fluid level
Refer to “BRAKE FLUID LEVEL
INSPECTION” section.
4. Check:
9Brake lever operation
A softy or spongy feeling ÕBleed brake
system.
Refer to “BRAKE SYSTEM AIR BLEED-
ING” section.
EC366060
REAR BRAKE PAD INSPECTION AND
REPLACEMENT
1. Inspect:
9Brake pad thickness a
Out of specification ÕReplace as a set.
2. Replace:
9Brake pad
9Install the pad pin plug w.
Pad pin plug:
3 Nm (0.3 m•kg, 2.2 ft•lb)
Brake pad thickness a a
:
Standard
6.4 mm (0.25 in)
1.0 mm (0.04 in)
Brake pad replacement steps:
9Remove the protector 1and pad pin plug
2.
9Loosen the pad pin 3.
9Remove the rear wheel 4and caliper 5.
Refer to “FRONT WHEEL AND REAR
WHEEL” section in the CHAPTER 5.
5MV-9-30-3B 6/19/00 1:49 PM Page 6