timing chain YAMAHA YZ250F 2005 User Guide
[x] Cancel search | Manufacturer: YAMAHA, Model Year: 2005, Model line: YZ250F, Model: YAMAHA YZ250F 2005Pages: 668, PDF Size: 15.74 MB
Page 308 of 668

4 - 27
ENGCAMSHAFTS
Fit the timing chain 3 onto both camshaft
sprockets and install the camshafts on the
cylinder head.
NOTE:
The camshafts should be installed onto the
cylinder head so that the punch mark c on
the exhaust camshaft and the punch mark
d on the intake camshaft must align with
the cylinder head surface, as shown in the
illustration.
CAUTION:
Do not turn the crankshaft during the
camshaft installation. Damage or
improper valve timing will result.
Install the clips, camshaft caps 4 and
bolts (camshaft cap) 5.
T R..
Bolt (camshaft cap):
10 Nm (1.0 m kg, 7.2 ft lb)
NOTE:
Before removing the clips, cover the cylin-
der head with a clean rag to prevent the
clips from into the cylinder head cavity.
Apply the engine oil on the thread and
contact surface of the bolts (camshaft
cap).
Tighten the bolts (camshaft cap) in a criss-
cross pattern.
CAUTION:
The bolts (camshaft cap) must be tight-
ened evenly, or damage to the cylinder
head, camshaft caps, and camshaft will
result.
2. Install:
Timing chain tensioner
Installation steps:
While pressing the tensioner rod lightly
with fingers, use a thin screwdriver and
wind the tensioner rod up fully clockwise.
Page 310 of 668

4 - 28
ENG
With the rod fully wound and the chain ten-
sioner UP mark a facing upward, install
the gasket 1 and the timing chain ten-
sioner 2, and tighten the bolt 3 to the
specified torque.
T R..
Bolt (timing chain tensioner):
10 Nm (1.0 m kg, 7.2 ft lb)
Release the screwdriver, check the ten-
sioner rod to come out and tighten the
gasket 4 and the cap bolt 5 to the speci-
fied torque.
T R..
Tensioner cap bolt:
7 Nm (0.7 m kg, 5.1 ft lb)
5
4
3. Turn:
Crankshaft
Counterclockwise several turns.
4. Check:
Rotor T.D.C. mark
Align with the crankcase align mark.
Camshaft match marks
Align with the cylinder head surface.
Out of alignment → Adjust.
5. Install:
Timing mark accessing screw 1
Crankshaft end accessing screw 2
CAMSHAFTS
Page 312 of 668

4 - 29
ENG
6. Install:
Timing chain guide (top side) 1
Cylinder head cover gasket 2
Cylinder head cover 3
Bolt (cylinder head cover) 4
NOTE:
Apply the sealant on the cylinder head cover
gasket.
Quick gasket®:
ACC-QUICK-GS-KT
YAMAHA Bond No. 1215:
90890-85505
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
7. Install:
Oil tank breather hose
Cylinder head breather hose
Spark plug
T R..13 Nm (1.3 m · kg, 9.4 ft · lb)
CAMSHAFTS
Page 314 of 668

4 - 30
ENGCYLINDER HEAD
CYLINDER HEAD
Extent of removal:
1 Cylinder head removal
Extent of removal Order Part name Q’ty Remarks
CYLINDER HEAD REMOVAL
Preparation for removal Seat and fuel tank Refer to “SEAT, FUEL TANK AND SIDE
COVERS” section.
Exhaust pipe and silencer Refer to “EXHAUST PIPE AND
SILENCER” section.
Radiator hose 1 Disconnect at cylinder head side.
Carburetor Refer to “CARBURETOR” section.
Camshaft Refer to “CAMSHAFTS” section.
Upper engine bracket Refer to “ENGINE REMOVAL” section.
1 Radiator pipe 1
2 Oil delivery pipe 1
3Nut 2
4 Bolt [L = 135 mm (5.31 in)] 2
5 Bolt [L = 145 mm (5.71 in)] 2
6 Cylinder head 1
7 Timing chain guard (exhaust
side)1
1
Page 318 of 668

4 - 32
ENGCYLINDER HEAD
ASSEMBLY AND INSTALLATION
Cylinder head
1. Install:
Dowel pin 1
Cylinder head gasket 2
Timing chain guide (exhaust side) 3
Cylinder head 4
NOTE:
While pulling up the timing chain, install the
timing chain guide (exhaust side) and cylinder
head.
2. Install:
Washer 1
Cable guide 2
Bolts [L = 145 mm (5.71 in)] 3
Bolts [L = 135 mm (5.31 in)] 4
Nuts 5
NOTE:
Apply the molybdenum disulfide grease on
the thread and contact surface of the bolts.
Follow the numerical order shown in the illus-
tration. Tighten the bolts and nuts in two
stages.
T R..38 Nm (3.8 m · kg, 27 ft · lb)
T R..38 Nm (3.8 m · kg, 27 ft · lb)
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
3. Install:
Copper washer 1
Oil delivery pipe 2
Union bolt (M8) 3
Union bolt (M10) 4
T R..18 Nm (1.8 m · kg, 13 ft · lb)
T R..20 Nm (2.0 m · kg, 14 ft · lb)
4. Install:
Radiator pipe 1
Bolt (radiator pipe) 2
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
Page 350 of 668

4 - 48
ENG
3. Install:
Cylinder gasket 1
Cylinder 2
NOTE:
Install the cylinder with one hand while com-
pressing the piston rings with the other hand.
CAUTION:
Pass the timing chain 3 through the tim-
ing chain cavity.
Be careful not to damage the timing chain
guide 4 during installation.
4. Install:
Bolt (cylinder) 5
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
CYLINDER AND PISTON
Page 428 of 668

4 - 87
ENGCRANKCASE AND CRANKSHAFT
CRANKCASE AND CRANKSHAFT
Extent of removal:
1 Crankcase separation
2 Crankshaft removal
Extent of removal Order Part name Q’ty Remarks
CRANKCASE AND CRANK-
SHAFT REMOVAL
Preparation for removal Engine Refer to “ENGINE REMOVAL” section.
Piston Refer to “CYLINDER AND PISTON” sec-
tion.
Kick shaft assembly
Refer to “KICK SHAFT AND SHIFT
SHAFT” section.
Segment
Stator Refer to “CDI MAGNETO” section.
Balancer shaft Refer to “BALANCER” section.
1 Timing chain guide (intake side) 1
2 Timing chain 1
3 Oil delivery pipe 2 1
21
Page 436 of 668

4 - 91
ENGCRANKCASE AND CRANKSHAFT
Crankshaft
1. Remove:
Crankshaft 1
Use the crankcase separating tool 2.
CAUTION:
Do not use a hammer to drive out the
crankshaft.
Crankcase bearing
1. Remove:
Bearing 1
NOTE:
Remove the bearing from the crankcase by
pressing its inner race.
Do not use the removed bearing.
Crankcase separating tool:
YU-1135-A/90890-01135
INSPECTION
Timing chain and timing chain guide
1. Inspect:
Timing chain
Cracks/stiff → Replace the timing chain
and camshaft sprocket as a set.
2. Inspect:
Timing chain guide
Wear/damage → Replace.
Crankcase
1. Inspect:
Contacting surface a
Scratches → Replace.
Engine mounting boss b, crankcase
Cracks/damage → Replace.
2. Inspect:
Bearing
Rotate inner race with a finger.
Rough spot/seizure → Replace.
3. Inspect:
Oil seal
Damage → Replace.
Page 444 of 668

4 - 95
ENGCRANKCASE AND CRANKSHAFT
6. Tighten:
Hose guide 1
Clutch cable holder 2
Bolt (crankcase) 3
NOTE:
Tighten the crankcase tightening bolts in
stage, using a crisscross pattern.
T R..12 Nm (1.2 m · kg, 8.7 ft · lb)
7. Install:
Oil delivery pipe 2 1
O-ring 2
Bolt (oil delivery pipe 2) 3
NOTE:
Apply the lithium soap base grease on the O-
rings.
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
8. Install:
Timing chain 1
Timing chain guide (intake side) 2
Bolt (timing chain guide) 3
9. Remove:
Sealant
Forced out on the cylinder mating sur-
face.
10. Apply:
Engine oil
To the crank pin, bearing and oil delivery
hole.
11. Check:
Crankshaft and transmission operation.
Unsmooth operation → Repair.
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)