wiring AUDI A4 2000 B5 / 1.G AFC Engine Ignition Coils Checking Workshop Manual

Page 1 of 4

28-16


Ignition coils, checking

Notes:

Check wiring between power output stage and
ignition coils, and between the ignition coils and
the connector set in the connector bracket, for
insulation damage.
Component locations page 28
-1 .

Checking secondary resistance

- Disconnect ignition wires from the ignition
coils.

If the specified resistance is not obtained for any one coil: - Switch Fluke 83 multimeter to resistance range and connect between
the two posts of the ignition coil being tested.

Specified value: 9000-14000 - Replace ignition coil.
Pa
ge 1 of 4 I
gnition coils, checkin
g
11/23/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.FU01.28.4

Page 4 of 4

28-18

Checking voltage supply

Fuse for ignition coils OK

- Disconnect white connector on connector
bracket page 28
-1 .

- Switch ignition on.

If the specified values are not obtained: - Switch Fluke 83 multimeter to voltage range and connect in sequence
between Ground (GND) and all three terminals of the connector.
Specified value: approx. battery voltage
- Check for open circuit using wiring diagram, repair as necessary, also
check fuses.
Pa
ge 4 of 4 I
gnition coils, checkin
g
11/23/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.FU01.28.4