Tensioner BMW 528i 2000 E39 Repair Manual
Page 257 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain/ - - - - - - . - - . - .
Tighten exhaust camshaft sprocket mounting bolts (arrows)
alternately in two stages.
Tightening torques
Secondary timing chain sprocltets to camshafts
Stage
1
Stage 2
5 Nm (44 in-lb)
22 Nm (17 ft-lb)
- Remove crankshaft locking tool and camshaft locking tool
set.
- install camshaft gear bolt access plugs using new sealing
washers and tighten.
- Remove timing chain tensioning tool from side of cylinder
head. Install primary chain tensioner with new sealing wash-
er and tighten.
Tightening torques
Access plugs to VANOS control unit 50 Nm (37 ft-lb)
Primary timing chain tensioner
plug to 70 Nm (52 ft-lb)
tensioner sleeve
- Check adjustment VANOS system, see VANOS timing,
checking and adjusting
(M52 engine).
Page 260 of 1002
Downloaded from www.Manualslib.com manuals search engine
1 17-24
I Camshaft Timing Chain
4 Remove banjo bolt from VANOS unit oil feed line and install
BMW special tool 11 3 450.
NOTE-
Oil will drain from oil feed line.
- Connect compressed air line (with pressure set to 2-8 bar or
30-1 10 psi.) to air fitting.
4 Measure gap (A) between secondary timing chain tensioner
and
intake camshaft sensor wheel. Make note of distance.
4 Connect cable test (BMW special tool 11 6 410) to VANOS
connector. Connect positive clip to positive battery terminal.
- Connect negative clip to battery negative terminal.
CAUTION-
Reversing terminals on special tool will damage diode on
VANOS solenoid valve.
Page 261 of 1002
Downloaded from www.Manualslib.com manuals search engine
-
Camshaft Timing Chain -. -
Measure gap (B) between secondary timing chain tensioner
and intake camshaft sensor wheel. Make note of distance.
To determine VANOS control travel:
Distance
I3 - distance A = a minimum of 8.5 mm
CAUTION-
If the adjustment travel is less than 8.5 mm the VANOS ad-
justment unit must be removed and readjusted. See
VANOS
control unit, removing (M52 engine)
and VANOS con-
trol unit, installing
(M52 engine).
Remove special tools:
Cranltshaft locking tool.
Camshaft
loclting tool set.
Air fitting.
* VANOS cable adaptor.
- Install VANOS oil line with new seal
- Install oil baffle cover above intake camshaft.
- Install cylinder head cover mounting studs to rear of head.
- Install cylinder head cover,
Tightening
torques
Cylinder head cover 10 Nrn (89 in-lb)
VANOS oil line
32 Nm (24 R-lb)
VANOS solenoid to control unit 30 Nrn (22 ft-lb)
- Installation of remaining parts is reverse of removal.
Page 262 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain Timing chains, removing
(M52 engine)
Camshaft timing chain removal on M52 engines requires en-
gine oil pan removal.
Special
BMW sewice tools are needed for timing chain re-
moval and installation procedures. The special tools assure
propertiming of thevalvetrain. Precise marks to
setthe timing
on the camshafts are not provided for reassembly. Read the
procedures through before beginning the job.
NOTE-
If the camshafts are not properly timed, the pistons can con-
tact the valves.
- Remove VANOS control unit. See VANOS control unit, re-
moving (M52 engine).
- Remove radiator cooling fan and shroud. See 170 Radiator
and Cooling System.
- Drain cooling system. See 170 Radiator and Cooling Sys-
tem.
- Remove coolant hoses from thermostat housing and remove
thermostat housing from front of cylinder head.
- Loosen bolts for coolant pump pulley.
- Remove drive belts for alternator and AIC compressor. See
020 Maintenance.
- Remove coolant pump pulley.
Remove drive belt tensioner mounting bolts (arrows) and re-
move tensioner from front of engine.
- Remove engine speed sensor from lower timing chain cover.
Page 263 of 1002
Downloaded from www.Manualslib.com manuals search engine
4 With crankshaft at TDC position, remove vibration damper
bolts (arrows) and remove vibration damper.
< Mount crankshaft holding tool (BMW special tool 11 2 150
and
11 2 410) to crankshaft hub. Counter hold crankshaft and
loosen crankshaft hub retaining bolt.
Crankshaft hub retaining bolt is torqued to
410 Nm (300 ft-lb).
Do not use flywheel
locliing tool to hold cranl(shait stationary
to loosen or tighten crankshaft hub center bolt. Use only the
special tools specified, or equivalent hub holding tool.
- Remove crankshaft hub.
- Remove cylinder cover mounting fasteners and remove cyl-
inder head cover.
NOTE-
The cylinder head cover mounting bolt insulators and gas-
lets should be reinstalled in their original positions. Make
note of their arrangement during removal.
- Drain engine oil, remove oil pan. See 119 Lubrication Sys-
tem.
Remove primary timing chain tensioner (arrow).
CAUTION-
Timing chain tensioner is under spring tension. I
- Remove VANOS control unit. See VANOS control unit, re-
moving
(M52 engine).
- Remove fasteners from intake and exhaust camshaft
sprocket.
Page 264 of 1002
Downloaded from www.Manualslib.com manuals search engine
[camshaft Timing Chain
< While pressing down on secondary timing chain tensioner
install locking tool (BMW
11 3 292) or a similar pin.
NOTE-
Two types of secondary timing chain tensioners are used,
with either two holes (shown) or a single hole for the
locking
pin tool.
- Remove intake and exhaust sprockets together with
secondary chain.
< Remove secondary timing chain tensioner bolts (arrows)
and remove tensioner.
- Remove primary timing chain sprocket from exhaust
camshaft.
- Remove sprocket and hang timing chain from end of exhaust
camshaft.
4 Remove secondary chain guide bolts (arrows) and remove
guide.
Page 267 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain1
Tap locating dowels into cover until they protrude 2 to 3 mm
from sealing surface.
- Using new gaskets, install lower timing chain cover:
Tap cover into position to engage dowels.
Install timing chain cover fasteners and tighten to
5 Nm (44
in-lb).
Drive dowels in flush to front of cover.
. Tighten cover mounting bolts alternately and in stages.
Install cylinder head to timing chain cover fasteners and
tighten.
Tightening torques Lower timing chain cover to block
M7 15 Nm (1 1 ft-lb)
ME 20 Nm (15 it-lb)
- Replace front crankshaft radial seal. See Crankshaft oil
seal, front, replacing
(M52 engine).
Install engine oil pan using
a new gasket. See 119 Lubrica-
tion System.
Mount primary timing chain sprocket to primary
cha~n so that
arrow on sprocket faces up. Mount sprocket to camshafl so
that tapped holes in camshaft are on left side of elongated
holes in sprocket.
4 Install adjustable timing chain tensioner (BMW special tool
11 4 220). Thread tool in finger tight until slack is removed
from chain.
NOTE-
BMW special tool 11 4 220 is an adjustable timing chain ten-
sioner that simulates the function of the hydraulic tensioner.
- Check that elongated holes in primary sprocket are centered
to bolt holes in camshafl and chain is free of slack.
- Install secondary timing chain guide and secondary chain
tensioner. Tighten mounting bolts (tensioner remains
locited
down).
F81.,,l,ryT-iib.l>nii,:oni-Aii Ri"ilti R
Page 268 of 1002
Downloaded from www.Manualslib.com manuals search engine
-- -
Chain 1
- Install cylinder identification trigger plate to front of intake
camshaft.
- Install spacer to front of intake camshaft
- Install secondary chain sprockets and chain as an assembly
so that arrows on sprockets are pointing up. Center mounting
holes in sprockets to bolt holes in camshafts.
4 lnstall thrust washers and spring plate to intake cam
sprocket.
Tighten intake camshaft sprocket nuts.
- Install VANOS control unit, see VANOS control unit, install-
ing
(M52 engine).
Tightening torque
Intake camshaft sprocket nuts to studs
(ME) 1011 Nm (8919 In-lb) 502117068
- Unlock and release secondary chain tensioner,
4 Preload primary timing chain by torquing adjustable primary
chain tensioner (BMW special tool
11 4 220) to 1.3 Nm
(11 in-lb).
- Tighten exhaust camshaft sprocket bolts in two stage
Tightening torque Exhaust camshaft sprocket bolls (M7)
Stage 1
5 Nrn (44 in-lb)
Stage
2 22 Nm (17 ft-lb)
- Remove crankshaft locking tool and camshaft locking tools.
< Align hub with keyway and tap into place. Insert new center
bolt with washer shoulder (arrow) facing hub.
CAUTION-
Inspect woodruff ley for damage before installing hub.
- Attach crankshaft holding tool (BMW special tools 11 2
15011 1 2 410) to hub. Counterhold hub with tool while tight-
ening center bolt.
CAUTION-
Do not use flywheel locling tool to hold crankshaft stationary
to loosen or tighten
cranlshaft hub center bolt. Use only the
special tools specified, or equivalent hub holding tool.
Page 269 of 1002
Downloaded from www.Manualslib.com manuals search engine
-- Camshaft Timing Chain -- -
Tightening torque
Vibration damper hub to crankshaft
410 Nm (300 ft-lb)
4 Install cranltshaft hub and vibration damper while aligning
locating hole (arrow) in damper with dowel pin in hub.
Tightening torque
Vibration damper and
pulley to
cranltshaft hub
22 Nm (17 ft-lb)
- Turn engine over by hand in direction of rotation at least two
full rotations. Reinstall camshaft and crankshaft locking
toois
to recheck engine timing. Remove locking tools if no faults
are found.
- Remove BMW special tool 11 3 390 (dummy tensioner) from
side of cyiinder head.
- Install primary chain tensionerso that cutout in tensioner pis-
ton engages chain rail.
Tightening torque
Timing chain tensioner to tensioner sleeve
70 Nm (52 ft-ib)
- Install cylinder head cover mounting studs, camshaft cover,
and cylinder head cover.
Tightening torque Cylinder head cover to cyiinder head
M6 nut 10 Nm (89 in-lb)
MB bolt 22 Nm (17 ft-lb)
- installation of remaining parts is reverse of removal, noting
the following:
When installing thermostat, make sure arrow or vent hole
faces up, if applicable.
Refill cooling system as described in
170 Radiator and
Cooling System.
Fill engine with oil and install new
oil filter as described in
020 Maintenance.
Tightening torque Upper timing chain cover to cylinder head
M6 nut 10 Nm (89 in-lb)
MB bolt 22 Nm (17 ft-lb)
VANOS oil supply pipe to VANOS control
unit banjo bolt
32 Nm (24 ft-ib)
Page 279 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain
- Connect electrical harness connectors to camshaft position
sensors and VANOS solenoid valves.
- Remove BMW special locking tools from rear of cylinder
head.
- Remove cranltshaft locking tool and replace sealing plug.
Install intake camshaft baffle and cylinder head cover.
Checlc for correct seating of half-moon seals (A) in back of
cylinder head cover.
Use a small amount of Three Bond 1209
O or equivalent
sealant at corners
(B) of half-moon cutouts.
Similarly, seat gasket and
seal corners in front of cylinder
head, at VANOS control unit.
Tightening torque
Cylinder head cover to cylinder head
(M6) 10 Nm (89 in-lb)
- Remainder of installation is reverse of removal.
Tightening torques
Radiator fan (viscous clutch) to
coolant pump 40
Nm (30 ft-lb)
Spark plug to cylinder head
25 Nrn (18 ft-lb)
VANOS timing, checking and adjusting
(M52 TU and M54 engines)
Use this procedure to check and, if necessary, adjust cam-
shaft timing. This procedure assumes that the cylinder head
cover and intake
camshaft plastic baffle have been removed.
Also, be sure the cooling fan and the spark plugs have been
removed.
Remove primary camshaft chain tensioner cylinder
(arrow).
~~ ~ ~~ ~--~
CA UTlOAC
Primary camshaft chain tensioning piston is under spring
pressure.