front Citroen C3 2004 1.G Owner's Manual

Page 196 of 523

Downloaded from www.Manualslib.com manuals search engine 192
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1BP2N0C
Tools.
[1]
Engine flywheel peg Ø 12 mm : ().0194C
[2]
Camshaft pulley peg Ø 8 mm : ().0194B
[3]
Crankshaft pulley peg Ø 5 mm : ().0194A
Preliminar
y operations.
Remove:
The front RH wheel.
The front RH splashshield.
The accessories belt
(see corresponding operation).
Uncouple:
The supply unions
(1).
The air/air heat exchanger inlet/outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connector
(2).
Support the engine by means of a roller jack equipped with a chock.
Remove the engine supports
(4) and(5).
C3

Page 200 of 523

Downloaded from www.Manualslib.com manuals search engine 196
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1BP2N0C
Checks (continued).
Refit:
The engine support (7), tighten to 1,5 ± 0,4 m.daN.
The engine support
(4), tighten to 6,1 ± 0,6 m.daN.
The engine support
(5), tighten to 6 ± 0,6 m.daN.
The electrical harness
(6).
Couple:
The exhaust line, tighten the collar to : 2,5 ± 0,3 m daN.
The fuel supply unions
(1).
The air/air heat exchanger inlet/outlet pipes
(3).
Connect the connector
(2).
Refit:
The accessories belt (see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH road wheel, tighten to
9 ±1 m.daN.
Reconnect the battery.
C3

Page 205 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
201
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1BP304D
Tools.
[1]
Flywheel setting peg: ().0194.C
[2]
Camshaft setting peg:().0194.B
[3]
Crankshaft setting peg: ().0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove: The front RH wheel.
The front RH splashshield.
The accessories drive belt
(see corresponding operation).
Uncouple: The fuel supply unions
(1).
The air/air heat exchanger inlet and outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connecter at
«a».
Remove and move aside the power steering fluid reservoir
(6).
Uncouple, plug and move aside the tube
(2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports
(4)and (5).
XSARA PICASSO

Page 208 of 523

Downloaded from www.Manualslib.com manuals search engine 204
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to 5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
The tube (2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH wheel, tighten to 9 ±1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE:Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 209 of 523

Downloaded from www.Manualslib.com manuals search engine 205
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1BP304D
Tools.
[1]
Flywheel setting peg: ().0194.C
[2]
Camshaft setting peg:().0194.B
[3]
Crankshaft setting peg: ().0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove: The front RH wheel.
The front RH splashshield.
The accessories drive belt
(see corresponding operation).
Uncouple:
The fuel supply unions
(1).
The air/air heat exchanger inlet and outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connecter at
«a».
Remove and move aside the power steering fluid reservoir
(6).
Uncouple, plug and move aside the tube
(2).
Support the engine with a roller jack equipped with a block.Remove the engine supports
(4)and (5).
XSARA PICASSO

Page 214 of 523

Downloaded from www.Manualslib.com manuals search engine 210
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
The tube
(2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield (see corresponding operation).
The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 216 of 523

Downloaded from www.Manualslib.com manuals search engine 212
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1BP2FTC
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splashshield, using tool [1].
Remove the accessories drive belt (see corresponding operation).
Uncouple and plug the diesel fuel delivery and return hoses. Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gear to permit rotation of the engine. Remove the upper cover
(1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING:Refit the screw (4)equipped with a washer (5 mm thick).
Rotate the front RH wheel to drive the engine in its normal direction of
rotation. Bring the camshaft drive and injection pump pinions to their setting points.
Position the peg
[2](from underneath the vehicle).
Continue turning the engine until the peg [2]engages in the flywheel.
B1BP30BC
XSARA

Page 222 of 523

Downloaded from www.Manualslib.com manuals search engine 218
ENGINECHECKING AND SETTING THE VALVE TIMING
NOTE: Checking and setting the valve timing on engines: RHYRHZ N° ⁄ RPO 9127
See Mechanic’s Handbook 2003: pages 193 to196
Tools.
[1]
Belt tension measuring equipment :4122T
[2]
Tension lever:().0188.J2
[3]
Engine flywheel peg: ().0188.Y
[4]
Belt clamp: ().0188.AD
[5]
Camshaft pulley peg: ().0188.M
[6]
Engine flywheel lock: ().0188.F
[7]
Set of blocking plugs:().0188.T
[8]
Pulley extractor:().0188.P
[9]
2 mm dia.peg: ().0188.Q2Removing.
IMPERATIVE: Respect the safety and cleanliness requirements
that are specific to high pressure diesel injection (HDi) engines.
Undo the front RH wheel bolts.
Raise and support the vehicle on the front RH side.
Disconnect the battery negative terminal.
Remove:
The underengine sounddeadening.
The front RH wheel.
The front RH splashshield. The engine cover.
Unclip and move aside the cooling hose.
Remove the accessories drive belt
(see corresponding operation).
XSARA XSARA PICASSO
Engines: RHY RHZ N° RPO 9128 #

Page 257 of 523

Downloaded from www.Manualslib.com manuals search engine 253
INJECTION
XSARACHECKING AND SETTING THE DELPHI MECHANICAL INJECTION PUMP
Tools.
[1]
Flywheel locating peg: 7014T.J
[2] H M8 screw: ().0188.E Tool kit C.0188
[3]Injection pump setting peg Ø 6 mm : ().0188.H
After carrying out the necessary dismantling operations on the vehicle, proceed in the following manner:
Remove:
The screws
(6), (7), (9), (10)and (12).
The upper casing (8).
The intermediate casing (11).
WARNING:Refit the screw (6)equipped with a washer.(Thickness 5 mm)
Turn the front RH wheel to turn the engine.(Normal direction of rotation) Bring the camshaft and injection pump pulleys to their setting point.
Position the flywheel peg, using tool [1].(From below the vehicle) Turn the engine until the peg [1]engages in the flywheel.
B1EP12NC
Engine: WJY
B1BP1S9C

Page 312 of 523

Downloaded from www.Manualslib.com manuals search engine 308
RECOMMENDATIONS PRECAUTIONS: MA PILOTED MANUAL GEARBOX
Safety requirements.
ESSENTIAL:Given the special features of the MA type piloted
manual gearbox, observe the requirements detailed below.
IMPERATIVE: Always disconnect the battery negative terminal
before operating on the actuators.
NOTE:
After disconnecting the battery, never try to remove the clutch
actuator on the vehicle before having checked that it is in the closed
position
(rod pushed in).
IMPERATIVE:After Sales checks done with the engine running must be
performed with «Neutral»engaged and the handbrake on (unless there
is a clear mention otherwise in the repair procedures).
IMPERATIVE:The areas of movement of the clutch fork and of the gear
engagement lever must always be kept free during the actuatoroperating phases.
CLUTCH
GEARBOX
TRANSMISSION
IMPERATIVE:When initialising the clutch actuator and/or gearbox
actuator, do not allow any person to walk or stand in front of the vehicle.
WARNING:When the engine is running, it is forbidden to perform
repairs on the clutch and gearbox actuators on the vehicle (whether
manually or using a diagnostic tool).
WARNING:Each time the driver’s door is opened and each time the
igntion is switched on, the gearbox ECU prompts the initialising of the
clutch and gearbox actuators
(there is movement of the clutch fork and
of the gear lever).
WARNING:Whether the ignition is switched on or not, an action on the
gear selector causes the clutch fork and the gear engagement lever to
move on the gearbox.
Engines: HFX KFV NFU 8HX
C2

Page:   < prev 1-10 11-20 21-30 31-40 41-50 51-60 61-70 ... 90 next >