Wing Citroen XSARA PICASSO 2004 1.G Owner's Manual

Page 202 of 523

Downloaded from www.Manualslib.com manuals search engine 198
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1EP18WD
Setting the timing (continued).
Chec
king the setting.
IMPERATIVE: Just prior to refitting, carry out the following tests.
Check that:
the rollers and the coolant pump operate freely
(no play and no tight spot).
there are no traces of oil
(from the crankshaft and camshaft sealing rings).
there is no leak of coolant fluid
(from the coolant pump).
the target track of the engine speed sensor
(14)is not damaged or scratched
(if necessary replace the defective components).
Refitting.
Fit the timing belt on the crankshaft pinion.
Position the belt on the guide roller, with the belt well tensioned.
Refit:
The timing protector
(13).
The sensor
(14).
C3

Page 203 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
199
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1EP18XC
Setting the timing (continued).
Chec
ks (continued).
Reposition the timing belt, belt at «e»well tensioned, in the following order:
Guide roller
(17).
Camshaft pulley
(16).
Fuel high pressure pump pulley
(15).
Coolant pump pinion
(18).
Tensioner roller
(19).
Remove the
5 mmdiameter peg at «d».
Adjusting the fitting tension of the belt.
Action the tensioner roller (19)to align the marks «f»and «g», avoiding detensioning the timing belt,
with the aid of a male hexagonal spanner, at
«c».
If this is not successful, repeat the operation to tension the belt.Hold the tensioner roller in position
(19).
Tighten the tensioner roller, tightening to
3,7 ±0,3 m.daN.
Check the position of the tensioner roller
(the alignment of the marks «f»and «g»should be correct).
Remove tools
[2]and [3].
Turn the crankshaft
six rotations(clockwise).
C3

Page 208 of 523

Downloaded from www.Manualslib.com manuals search engine 204
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to 5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
The tube (2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH wheel, tighten to 9 ±1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE:Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 212 of 523

Downloaded from www.Manualslib.com manuals search engine 208
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1EP1E7D
Refitting.
Fit the timing belt on the crankshaft pinion.
Position the belt on the guide roller, belt well tensioned.
Refit:
The timing belt protector
(13).
The engine speed sensor
(14).
Reposition the timing belt, strip
«f»well tensioned, in the following sequence:
Guide roller
(16).
Camshaft pulley
(20).
Fuel high pressure pump pulley
(19).
Coolant pump pulley
(17).
Tensioner roller
(18).
XSARA PICASSO

Page 214 of 523

Downloaded from www.Manualslib.com manuals search engine 210
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
The tube
(2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield (see corresponding operation).
The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 217 of 523

Downloaded from www.Manualslib.com manuals search engine 213
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Peg the camshaft hub, using tool [4].
Peg the injection pump hub, using tool [3].
Slacken screws (5)and (6).
Slacken screw (9)of the tensioner roller (8).
Remove the timing belt.
Refitting. Retighten screws (5)and (6)by hand.
Turn the pinions (10)and (7)clockwise in order to place them at end of slots.
Fit the timing belt on the crankshaft. Hold the belt, using tool
[5].
Position the timing belt in the following sequence:
Guide roller
(11).
Injection pump pinion (7).
Camshaft pinion (10).
Coolant pump pinion
(12).
Tensioner roller (8).
B1EP16PDB1EP1EDCB1EP132C
XSARA
B1EP1EEC

Page 220 of 523

Downloaded from www.Manualslib.com manuals search engine 216
ENGINE
(1) «Idler»camshaft pulley(2)Target for cylinder reference sensor.(3)Camshaft hub.(4)«Fixed»crankshaft pinion.
The determining of the tension of the timing belt is done on the cam
shaft pulley
(1).
The new timing on 8 valveengines DW10TD (RHY)and DW10
ATED (RHS-RHZ)requires the following components:«Idler»crankshaft pinion«Fixed»camshaft pulley.
(5) «Fixed»pulley with integral cylinder reference
sensor target).(6) «Idler»crankshaft pinion (with increased width keyway groove).
The determining of the tension of the timing belt is done on the crankshaft pinion
(6).
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
OLD FITTING:# N° RPO 9127 NEW FITTING N° RPO 9128 #
B1EP176DB1EP177D
XSARA XSARA PICASSO

Page 221 of 523

Downloaded from www.Manualslib.com manuals search engine 217
ENGINE
The new fitting discontinues the following components:
Camshaft hub.
Cylinder reference sensor target.
Repair – Accessories drive pulley
Remove – Refit
WARNING:
Peg the camshaft and the crankshaft before ever removing the
accessories drive pulley (the pegging prevents any offsetting of the camshaft).
If necessary, apply a paint spot to mark the accessories drive pulley being
replaced.
Replacement parts.
The Replacement Parts service markets the old as well as the new components.
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
NEW FITTING N° RPO 9128 # (Continued)
B1EP177D
XSARA XSARA PICASSO

Page 226 of 523

Downloaded from www.Manualslib.com manuals search engine 222
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
Fuel high pressure pump pulley
(21).
Guide roller
(15).
Crankshaft pinion
(19).
Coolant pump pinion
(16).
Tensioner roller
(18).
Position tool
[1]on the belt at «a».
Remove tools
[4]and [9].
Turn the tensioner roller
(18)anticlockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEM units.
Tighten screw
(17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool
[6].
Tighten the accessories drive pulley screw
(8)to 7 ± 0,7 m.da N.
Remove tools
[1], [3], [5] and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley, using tool
[5].
B1EP1ABDB1EP1ACC
XSARA XSARA PICASSO

Page 247 of 523

Downloaded from www.Manualslib.com manuals search engine 243
INJECTION
SAFETY REQUIREMENTS: HDi DIRECT INJECTION SYSTEM
Engines: HDi ALL TYPES
SAFETY REQUIREMENTS.
Preamble.
All interventions on the injection system must be carried out to conform with the following requirements and regulations:
Competent health authorities.
Accident prevention.
Environmental protection.
WARNING:Repairs must be carried out by specialised personnel informed of the safety requirements and of the precautions to be taken.
Safety requirements.
IMPERATIVE: Take into account the very high pressures in the high pressure fuel circuit (1350 bars), and respect the requirements below: No smoking in proximity to the high pressure circuit when work is being carried out.
Avoid working close to flame or sparks.
Engine running: Do not work on the high pressure fuel circuit.
Always stay clear of the trajectory of any possible jet of fuel, which could cause serious injuries.
Do not place your hand close to any leak in the high pressure fuel circuit.
After the engine has stopped, wait
30 secondsbefore any intervention.
NOTE:This waiting time is necessary in order to allow the high pressure fuel circuit to return to atmospheric pressure.

Page:   < prev 1-10 11-20 21-30 31-40 41-50 51-60 61-70 ... 80 next >