Timing tool Citroen XSARA PICASSO 2004 1.G Repair Manual

Page 226 of 523

Downloaded from www.Manualslib.com manuals search engine 222
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
Fuel high pressure pump pulley
(21).
Guide roller
(15).
Crankshaft pinion
(19).
Coolant pump pinion
(16).
Tensioner roller
(18).
Position tool
[1]on the belt at «a».
Remove tools
[4]and [9].
Turn the tensioner roller
(18)anticlockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEM units.
Tighten screw
(17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool
[6].
Tighten the accessories drive pulley screw
(8)to 7 ± 0,7 m.da N.
Remove tools
[1], [3], [5] and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley, using tool
[5].
B1EP1ABDB1EP1ACC
XSARA XSARA PICASSO

Page 227 of 523

Downloaded from www.Manualslib.com manuals search engine 223
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Lock the engine flywheel, using tool [6].
Slacken:
The accessories drive pulley
(8).
The screw (17) of the tensioner roller (18).
Fit the tool [1].
Turn the tensioner roller, using tool [2], to attain a tension of:54 ± 2 SEEM units.
Tighten screw (17)of the tensioner roller (18)to 2,5 ± 0,2 m.daN.
Remove tool [1].
Fit tool [1].
The tension value should be:
54 ±3 SEEM units.ESSENTIAL: If the value is incorrect, recommence the operation.
Remove tools [1], [3], [5]and [6].
Rotate the crankshaft two times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley.
IMPERATIVE:If the pegging is not possible, recommence the operation.
B1EP1ACC
XSARA XSARA PICASSO

Page 228 of 523

Downloaded from www.Manualslib.com manuals search engine 224
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Remove:
Tools [3]and [5].
Screw (7)and the spacer.
Refit: The lower, intermediate and upper covers
(5).
Screw (7), tighten to 1,5 ± 0,1 m.daN.
Screws (3), (4)and (6).
The bracket (13).
Screws (11), tighten to 6,1 ± 0,5 m.daN.
The nut (12), tighten to 4,5 ± 0,5 m.daN.
Fit the bearing shell (10).
Take away the workshop hoist.
Clip the fuel delivery and return pipes. Remove the tool
[7].
Couple:
The fuel delivery pipe
(12).
The fuel return pipe (1).
Coat the screw (8)with loctite FRENETANCH.
Refit the tool [6]and the screw (8)with the washer (22),
Tighten to 7 ± 0,2 m.daNand angular tighten to A = 60° ± 5°
[6].
Reposition and reclip the cooling hose.
Complete the refitting of components in reverse order to removal.
B1EP1A7CB1BP2R4CB1EP1ADC
XSARA XSARA PICASSO

Page 258 of 523

Downloaded from www.Manualslib.com manuals search engine 254
INJECTION
CHECKING AND SETTING THE DELPHI MECHANICAL INJECTION PUMP
Engine: WJY (continued)
Peg:
The camshaft hub, using tool [2].
The injection pump hub, using tool [3].
Impossible to peg the camshaft.Reset the valve timing (See page 245).
Possible to peg the camshaft, but not the injection pump.Carry out the following operations:
Loosen the screws of the injection pump hub.
Turn the injection pump hub.
Insert the peg
[3]into the setting hole.
Tighten the screws of the injection pump hub.Tighten to 2,3 ±0,2 m.daN.
ESSENTIAL:If setting the diesel injection pump proves impossible, reset the valve
timing.(See page 251)
Remove:
The tools [1], [2]and [3].
The screw (6)and the washer.
Reassemble the components.
B1EP12WDB1BP1S9C
XSARA

Page 488 of 523

Downloaded from www.Manualslib.com manuals search engine 484
ELECTRICAL
SYSTEM
C5HP073C
SPECIAL FEATURES: AIR CONDITIONING SYSTEM (R 134.a)
Clickfit connector removing/fitting tool
Ø Inch
V ehicle
XSARA
XSARA
PICASSOTT
BP
HP5/8Black
8005T.A
3/8Red
8005T.C Ring colour Tool kit 4164T
Tightening torques (m.daN).
Unions
Steel/Steel
Aluminium/Steel Ø Pipes
1,7 ±0,3
1,3 ± 0,3 M 06
3,8 ± 0,3
2 ± 0,2
M 08
4 ± 0,3
2,5 ± 0,3 M 10
NOTE:Tighten the union to the recommended torque using a retaining spanner whenever possible.
NOTE:For operations concerning draining, drying (empty), checking and recharging of a system:refer to BRE 0290.
WARNING: For R 134.a quantities (see table on preceding page:483).
Aircon compressor fixings.
ESSENTIAL: Tighten the front part of the compressor(timing belt end), before the rear part of the compressor.

Page:   < prev 1-10 ... 21-30 31-40 41-50 51-60 61-70