Direction Citroen XSARA PICASSO 2005 1.G Owner's Manual

Page 222 of 462

Downloaded from www.Manualslib.com manuals search engine 216
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFN
Tensioning the timing belt.
Refitting (continued).
Remove the tools[1] and[2].
Rotate the crankshaftten times
(normal direction of rotation).
IMPERATIVE: No exterior pressure or action should be applied on the timing belt.
Peg the inlet camshaft pulley, using tool[1].
Checking.
Timing belt tension.
IMPERATIVE: Check the position of the index «a», it should be opposite the slot «g». If the position of the index «a» is not correct,
repeat the operations to tension the timig belt.
Complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following a reconnection of the battery
(see corresponding operation).
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 216

Page 228 of 462

Downloaded from www.Manualslib.com manuals search engine 222
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ - RFN
Tensioning the timing belt.
Turn the tensioner roller (8)in the direction of the arrow «c», by means of a hexagonal spanner at «d».
IMPERATVE: The index «a» should go past the slot «g» by an angular value of 10°.
If it does not, replace the tensioner roller or the timing belt and tensioner roller assembly.
Next bring the index «a» to its adjusting position «g», by turning the tensioner roller in the direction of
the arrow «e».
WARNING: the index «a» should not pass the slot «g».
Otherwise, repeat the operation to tension the timing belt.
IMPERATIVE: The tensioner roller should not turn during the tightening of its fixing.
If it does, repeat the operation to tension the timing belt.
Tighten the screw (9)of the tensioner roller (8)to 2,1 ± 0,2 m.daN.
IMPERATIVE: The hexagonal tensioner roller drive should be approx. 15° below the level of the cylinder
head gasket «h».
If it is not, replace the tensioner roller or the timing belt and tensioner roller assembly.
B1EP1BEC
B1EP1BFC
XSARA - XSARA PICASSO
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 222

Page 229 of 462

Downloaded from www.Manualslib.com manuals search engine 223
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ - RFN
Refitting (continued).
Remove the tools [1]and [2].
Rotate the crankshaft ten times
(normal direction of rotation).
IMPERATIVE: No pressure or outside force should be brought to bear on the timing belt.
Peg the inlet camshaft pulley, using tool [1].
Checks.
Tension of the timing belt.
ESSENTIAL: Check the position of the index «a», which should be opposite the slot «g».
If the position of the index «a» is not correct, repeat the operations to tension the timing belt.
Refit the upper timing cover (1).
Clip the fuel delivery hose on the timing cover.
Refit the accessories drive belt
(see corresponding operation).
Lower the vehicle.
Reconnect the battery
(see corresponding operation).
B1EP1BEC
B1EP1BFC
XSARA - XSARA PICASSO
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 223

Page 236 of 462

Downloaded from www.Manualslib.com manuals search engine 230
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Tensioning the timing belt.
Turn the tensioner roller (9)anti-clockwise, using a hexagonal spanner at «c».
Place the index «a»in position «e».
IMPERATIVE: The index «a» should go past the slot «f» by an angular value of 10°.
If it does not, replace the tensioner roller or the tensioner roller and timing belt assembly.
Then bring the index «a»to its adjustment position «f», by turning the tensioner roller in the direction
of the arrow «d».
WARNING: The index «a» must not go past the slot «f».
If it does, restart the operation to tension the timing belt.
IMPERATIVE : The tensioner roller must not turn during the tightening of its fixing. If it does
turn, restart the operation to tension the timing belt.
Tighten the screw (10)of the tensioner roller (9)to 2,1 ± 0,2 m.daN.
IMPERATIVE: The hexagonal tensioner roller drive should be at approx. 15° below the level of
the cylinder head gasket «g».
Otherwise, replace the tensioner roller or the tensioner roller and timing belt assembly.
B1EP1GXD
B1EP1GZC
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 230

Page 237 of 462

Downloaded from www.Manualslib.com manuals search engine 231
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Checking and setting the timing (continued).
Refitting (continued).
Remove the tools [1]and [2].
Refit the upper RH engine support.
Remove the workshop hoist.
Rotate the crankshaft ten times
(normal direction of rotation).
IMPERATIVE: No exterior pressure or action should be applied on the timing belt.
Suspend the engine using a workshop hoist.
Remove the upper RH engine support.
Peg the inlet camshaft pulley, using tool [1].
Checking.
Timing belt tension.
IMPERATIVE: Check the position of the index «a», it should be opposite the slot «f». If the position of the index «a» is not correct, repeat
the operations to tension the timig belt.
Complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following a reconnection of the battery
(see corresponding operation).
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 231

Page 247 of 462

Downloaded from www.Manualslib.com manuals search engine 241
ENGINE
CHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Turn the engine in the normal direction of rotation until the peg [1]engages in the setting hole.
Peg the flywheel at «b», using tool [1].
Move aside the electrical harness (6).
Remove:
- The engine support (7).
- The screw (8).
- The accessories drive pulley (9).
- The lower timing cover (10).
- The upper timing cover (11).
- The tool [1].
Refit the screw (8).
Rotate the crankshaft six times
(clockwise).
IMPERATIVE: Never turn it backwards.
B1BP305C
B1EP1HJD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 241

Page 250 of 462

Downloaded from www.Manualslib.com manuals search engine 244
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking and setting the timing (continued).
Turn the engine in the normal direction of rotation until the peg [1]engages in the setting hole.
Peg the flywheel at «b», using tool [1].
Move aside the electrical harness (6).
Remove:
- The engine support (7).
- The screw (8).
- The accessories drive pulley (9).
- The lower timing cover (10).
- The upper timing cover (11).
- The tool [1].
Refit the screw (8).
Rotate the crankshaft to bring the camshaft to its pegging point.
Peg:
- The camshaft at «c», using tool [2]
(oil the pegs).
- The fuel high pressure pump pulley (15)at «f»using a 5 mmdiameter peg.
WARNING: Do not touch or damage the track of the engine speed sensor target (14).
B1BP305C
B1EP1HJD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 244

Page 256 of 462

Downloaded from www.Manualslib.com manuals search engine 250
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1EP1E3D
Rotate the engine to drive it in its normal direction of rotation.
Peg the flywheel, using tool [1]at «b».
Move aside the harness (7).
Remove:
- The engine support (8).
- The screw (10).
- The accessories drive pulley (9).
- The lower timing cover (11).
- The upper timing cov (12).
- The tool [1].
B1BP305C
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 250

Page 260 of 462

Downloaded from www.Manualslib.com manuals search engine 254
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1EP1E3D
Rotate the engine to drive it in its normal direction of rotation.
Peg the flywheel at «b», using tool [1].
Move aside the harness (7).
Remove:
- The engine support (8).
- The screw (10).
- The accessories drive pulley (9).
- The lower timing cover (11).
- The upper timing cov (12).
- The tool [1].
B1BP305C
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 254

Page 266 of 462

Downloaded from www.Manualslib.com manuals search engine 260
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1BP2FTC
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splash-shield, using tool [1].
Remove the accessories drive belt
(see corresponding operation).Uncouple and plug the diesel fuel delivery and return hoses.
Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gearto permit rotation of the engine.
Remove the upper cover (1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING: Refit the screw (4) equipped with a washer
(5 mm thick).
Rotate the front RH wheel to drive the engine in its normal direction of
rotation.
Bring the camshaft drive and injection pump pinions to their setting
points.
Position the peg [2]
(from underneath the vehicle).
Continue turning the engine until the peg [2]engages in the flywheel.
B1BP30BC
XSARA
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 260

Page:   < prev 1-10 11-20 21-30 31-40 41-50 next >