CHECKING COMPRESSION PRESSURE
1. Warm up engine thoroughly. Then, stop it.
2. Release fuel pressure. Refer to EC-99, "
FUEL PRESSURE RELEASE" .
3. Disconnect fuel pump fuse to avoid fuel injection during mea- surement.
4. Remove engine cover with power tool. Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
5. Remove ignition coil and spark plug from each cylinder. Refer to EM-42, "
IGNITION COIL" and EM-43,
"SPARK PLUG (PLATINUM-TIPPED TYPE)" .
6. Connect engine tachometer (not required in use of CONSULT-ll).
7. Install compression gauge with an adapter (commercial service tool) onto spark plug hole.
Use the adapter whose picking up end inserted to spark plug
hole is smaller than 20 mm (0.79 in) in diameter. Otherwise, it
may be caught by cylinder head during removal.
8. Turn ignition switch to “START” for cranking. When the gauge pointer stabilizes, read the compression pressure and the engine rpm. Perform these steps to check each cylinder.
Compression pressure:
Unit: kPa (kg/cm2 , psi) /rpm
CAUTION:
Always use a fully changed battery to obtain the specified engine speed.
If the engine speed is out of the specified range, check battery liquid for proper gravity. Check the
engine speed again with normal battery gravity.
SBIA0466E
PBIC0900E
SBIA0533E
Standard Minimum Deference limit between cylinders
1,275 (13.0, 185) / 300 981 (10.0, 142) / 300 98 (1.0, 14) / 300

Page 2936 of 4731

CYLINDER HEAD EM-101
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
If compression pressure is below minimum value, check valve clearances and parts associated with
combustion chamber (valve, valve seat, piston, piston ring, cylinder bore, cylinder head, cylinder head
gasket). After the checking, measure compression pressure again.
If some cylinder has low compression pressure, pour small amount of engine oil into the spark plug hole
of the cylinder to re-check it for compression.
–If the added engine oil improves the compression, piston rings may be worn out or damaged. Check
piston rings and replace if necessary.
–If the compression pressure remains at low level despite the addition of engine oil, valves may be mal-
functioning. Check valves for damage. Replace valve or valve seat accordingly.
If two adjacent cylinders have respectively low compression pressure and their compression remains
low even after the addition of engine oil, cylinder head gaskets are leaking. In such a case, replace cyl-
inder head gaskets.
9. After inspection is completed, install removed parts.
10. Start the engine, and make sure that the engine runs smoothly.
11. Perform trouble diagnosis. If DTC appears, erase it. Refer to EC-101, "
TROUBLE DIAGNOSIS" .
ComponentsABS00E67
Removal and InstallationABS004X8
REMOVAL
1. Remove camshaft. Refer to EM-84, "CAMSHAFT" .
NOTE:
It is also possible to perform the following steps 2 and 3 just before removing camshaft.
2. Temporarily fit front suspension member to support engine. Refer to FSU-17, "
FRONT SUSPENSION
MEMBER" .
1. Engine rear lower slinger 2. Cylinder head (left bank) 3. Cylinder head bolt
4. Cylinder head (right bank) 5. Cylinder head gasket (right bank) 6. Cylinder head gasket (left bank)
7. Oil level gauge guide
SBIA0581E

Page 2937 of 4731

EM-102
[VQ35DE]
CYLINDER HEAD
Revision: 2005 July 2005 FX
CAUTION:
Temporary fitting means the status that engine is adequately stable though the hoist is released
from hanging.
NOTE:
At the time of the start of this procedure front suspension member is removed, and cylinder head is
hanged by hoist with the engine slinger installed.
3. Release the hoist from hanging, then remove the engine slinger.
4. Remove the following parts:
Fuel tube and fuel injector assembly; Refer to EM-45, "FUEL INJECTOR AND FUEL TUBE" .
Intake manifold; Refer to EM-24, "INTAKE MANIFOLD" .
Exhaust manifold; Refer to EM-26, "EXHAUST MANIFOLD AND THREE WAY CATALYST" .
Water inlet and thermostat assembly; Refer to CO-26, "WATER INLET AND THERMOSTAT ASSEM-
BLY" .
Water outlet, water pipe and heater pipe; Refer to CO-28, "WATER OUTLET AND WATER PIPING" .
5. Remove cylinder head bolts in reverse order as shown in the fig- ure with cylinder head bolt wrench (commercial service tool) and
power tool to remove cylinder heads (right and left banks).
6. Remove cylinder head gaskets.
INSPECTION AFTER REMOVAL
Cylinder Head Bolts Outer Diameter
Cylinder head bolts are tightened by plastic zone tightening
method. Whenever the size difference between “d1” and “d2”
exceeds the limit, replace them with new one.
If reduction of outer diameter appears in a position other than
“d2”, use it as “d2” point.
Cylinder Head Distortion
NOTE:
When performing this inspection, cylinder block distortion should be also checking. Refer to EM-143, "
CYLIN-
DER BLOCK DISTORTION" .
PBIC2057E
Limit (“d1” – “d2”) : 0.11 mm (0.0043 in)
PBIC2480E

Page 2938 of 4731

CYLINDER HEAD EM-103
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
1. Using a scraper, wipe off oil, scale, gasket, sealant and carbon deposits from surface of cylinder head.
CAUTION:
Do not allow gasket fragments to enter engine oil or engine coolant passages.
2. At each of several locations on bottom surface of cylinder head, measure the distortion in six directions.
If it exceeds the limit, replace cylinder head.
INSTALLATION
1. Install new cylinder head gaskets.
2. Turn crankshaft until No. 1 piston is set at TDC.
Crankshaft key should line up with the right bank cylinder cen-
ter line as shown in the figure.
3. Install cylinder head follow the steps below to tighten cylinder head bolts in numerical order as shown in the figure with cylin-
der head bolts wrench (commercial service tool).
CAUTION:
If cylinder head bolts re-used, check their outer diameters
before installation. Refer to EM-102, "
Cylinder Head Bolts
Outer Diameter" .
a. Apply new engine oil to threads and seat surfaces of cylinder head bolts.
b. Tighten all cylinder head bolts.
c. Completely loosen all cylinder head bolts. CAUTION:
In step “c”, loosen bolts in reverse order of that indicated in
the figure.
d. Tighten all cylinder head bolts. Limit : 0.1 mm (0.004 in)
SEM861E
SEM532G
: 98.1 N·m (10 kg-m, 72 ft-lb)
: 0 N·m (0 kg-m, 0 ft-lb)
: 39.2 N·m (4.0 kg-m, 29 ft-lb)
PBIC2057E

Page 2939 of 4731

EM-104
[VQ35DE]
CYLINDER HEAD
Revision: 2005 July 2005 FX
e. Turn all cylinder head bolts 90 degrees clockwise (angle tighten-
ing).
CAUTION:
Check the tightening angle by using the angle wrench
[SST]. Avoid judgment by visual inspection without SST.
Check tightening angle indicated on the angle wrench indica-
tor plate.
f. Turn all cylinder head bolts 90 degrees clockwise again (angle tightening).
4. After installing cylinder head, measure distance between front end faces of cylinder block and cylinder head (left and right
banks).
If measured value is out of the standard, re-install cylinder
head.
5. Install in the reverse order of removal after this step.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid. power steering fluid, brake fluid, etc.
PBIC0888E
Standard : 14.1 - 14.9 mm (0.555 - 0.587 in)
EMQ0662D
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —

Page 2951 of 4731

EM-116
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2005 July 2005 FX
When installing engine mounting bracket (RH and LH) on cylin-
der block, tighten two upper bolts (shown as “A” in the figure)
first. Then tighten two lower bolts (shown as “B” in the figure).
Make sure all engine mounting insulators are seated properly, then tighten mounting nuts.
Tighten rear engine mounting member bolts in numerical order
as shown in the figure.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid. power steering fluid, brake fluid, etc.
PBIC2062E
PBIC3040E
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —

Page 2955 of 4731

EM-120
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2005 July 2005 FX
3. Remove front suspension member mounting nuts. Refer to FSU-6, "FRONT SUSPENSION ASSEMBLY" .
4. Carefully lower jack, or raise lift to remove the engine, transmission assembly, transfer, front final drive assembly and front suspension member. When performing work, observe the following caution:
CAUTION:
Confirm there is no interference with the vehicle.
Make sure that all connection points have been disconnected.
Keep in mind the center of the vehicle gravity changes. If necessary, use jack(s) to support the
vehicle at rear jacking point(s) to prevent it from falling it off the lift.
Separation Work
1. Install engine slingers into front of cylinder head (right bank) and
rear of cylinder head (left bank).
To protect rocker cover against damage caused by tilting of
engine slinger, insert spacer between cylinder head and
engine rear lower slinger, in direction shown in the figure.
NOTE:
Spacer is a component part of engine rear upper slinger
assembly.
2. Remove power steering oil pump from engine side. Refer to PS-31, "
POWER STEERING OIL PUMP" .
3. Remove engine mounting insulators (RH and LH) under side nuts with power tool.
4. Lift with hoist and separate the engine, the transmission assembly, the transfer assembly and the front final drive assembly from front suspension member.
CAUTION:
Before and during this lifting, always check if any harnesses are left connected.
Avoid damage to and oil/grease smearing or spills onto engine mounting insulator.
5. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
6. Remove starter motor. Refer to SC-10, "
STARTING SYSTEM" .
7. Remove front propeller shaft from the front final drive assembly side. Refer to PR-4, "
FRONT PROPEL-
LER SHAFT" .
8. Separate the engine from the transmission assembly. Refer to AT- 2 7 0 , "
TRANSMISSION ASSEMBLY" .
9. Remove the front final drive assembly from oil pan (upper). Refer to FFD-12, "
FRONT FINAL DRIVE
ASSEMBLY" .
10. Remove each engine mounting insulator and each engine mounting bracket from the engine with power tool.
11. Remove rear engine mounting member and engine mounting insulator (rear) from the transmission assembly.
12. Remove dynamic damper from the transfer assembly.
INSTALLATION
Note the following, and install in the reverse order of removal. Slinger bolts:
: 28.0 N·m (2.9 kg-m, 21 ft-lb)
PBIC2061E
KBIA1017E

Page 2956 of 4731

ENGINE ASSEMBLY EM-121
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Do not allow engine mounting insulator to be damage and careful no engine oil gets on it.
For a location with a positioning pin, insert it securely into hole of mating part.
For a part with a specified installation orientation, refer to component figure in EM-117, "Components
(AWD Model)" .
When installing engine mounting bracket (RH and LH) on cylin-
der block, tighten two upper bolts (shown as “A” in the figure)
first. Then tighten two lower bolts (shown as “B” in the figure).
Install engine mounting bracket (RH) (lower) as follows:
–Temporarily tighten mounting bolts (shown as “C”, “D” and “E” in
the figure).
–Tighten mounting bolts to the specified torque with following
mounting surfaces touched.
 Engine mounting bracket (RH) to engine mounting bracket (RH) (lower) (shown as “C” and “D” in figure).
 Front final drive to engine mounting bracket (RH) (lower) (shown as “E” in figure).
Make sure all engine mounting insulators are seated properly,
then tighten mounting nuts.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid. power steering fluid, brake fluid, etc.
PBIC3042E
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —

Page 2964 of 4731

CYLINDER BLOCK EM-129
[VQ35DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Tighten each plug as specified below.
3. Install oil jet.
Insert oil jet dowel pin into cylinder block dowel pin hole, and
tighten mounting bolts.
4. Install main bearings and thrust bearings as follows: CAUTION:
Be careful not to drop main bearing, and to scratch the surface.
a. Remove dust, dirt, and engine oil on bearing mating surfaces of cylinder block and main bearing caps.
b. Install thrust bearings to the both sides of the No. 3 journal hous- ing on cylinder block and main bearing cap.
Install thrust bearings with the oil groove facing crankshaft
arm (outside).
Install thrust bearing with a protrusion on one end on cylinder
block, and thrust bearing with a protrusion at center on main
bearing cap. Align each protrusion with mating notch.
c. Install main bearings paying attention to the direction.
Main bearing with oil hole and groove goes on cylinder block.
The one without them goes on main bearing cap.
Before installing main bearings, apply engine oil to the bear-
ing surface (inside). Do not apply engine oil to the back sur-
face, but thoroughly clean it.
When installing, align main bearing stopper protrusion to cut-
out of cylinder block and main bearing caps.
Ensure the oil holes on cylinder block and those on the corre-
sponding bearing are aligned.
5. Install crankshaft to cylinder block.
While turning crankshaft by hand, check that it turns smoothly.
6. Install main bearing cap.
Part Washer Tightening torque
A No 9.8 N·m (1.0 kg-m, 87 in-lb)
B No 19.6 N·m (2.0 kg-m, 14 ft-lb)
C No 19.6 N·m (2.0 kg-m, 14 ft-lb)
D Yes 12.3 N·m (1.3 kg-m, 9 ft-lb) E Yes 62 N·m (6.3 kg-m, 46 ft-lb) F Yes 62 N·m (6.3 kg-m, 46 ft-lb)
PBIC0898E
PBIC0807E
PBIC2489E

Page 2965 of 4731

EM-130
[VQ35DE]
CYLINDER BLOCK
Revision: 2005 July 2005 FX
Main bearing caps are identified by identification mark cast on
them. For installation, face front mark to front side.
NOTE:
Main bearing cap cannot be replaced as a single part, because it
is machined together with cylinder block.
7. Install main bearing beam.
Install main bearing beam with front mark facing downward (oil pan side).
Install main bearing beam with front mark facing front of the
engine.
8. Install main bearing cap bolts in numerical order as shown in the figure as follows:
a. Inspect the outer diameter of main bearing cap bolt. Refer to EM-148, "
MAIN BEARING CAP BOLT OUTER DIAMETER" .
b. Apply new engine oil to threads and seat surfaces of main bear- ing cap bolts.
c. Tighten main bearing cap bolts in several different steps.
d. Turn all main bearing cap bolts 90 degrees clockwise (Angle tightening).
CAUTION:
Use the angle wrench [SST: KV10112100 (BT8653-A)] to
check tightening angle. Do not make judgment by visual
inspection.
After installing main bearing cap bolts, make sure that crank-
shaft can be rotated smoothly by hand.
Check the crankshaft end play. Refer to EM-140, "CRANK-
SHAFT END PLAY" .
9. Install piston to connecting rod as follows:
a. Using a snap ring pliers, install new snap ring to the groove of piston rear side.
Insert it fully into groove to install.
b. Install piston to connecting rod.
Using an industrial use drier or similar tool, heat piston until piston pin can be pushed in by hand without
excess force [approx. 60 to 70 °C (140 to 158 °F)]. From the front to the rear, insert piston pin into piston
and connecting rod.
SEM456G
PBIC0881E
: 35.3 N·m (3.6 kg-m, 26 ft-lb)
PBIC1800E
PBIC0921E

Page:   < prev 1-10 ... 521-530 531-540 541-550 551-560 561-570 571-580 581-590 591-600 601-610 ... 710 next >