10. Raise and hold the engine speed at 1,500 to 2,000 rpm for about
5 seconds, then return the engine to idle. Once the increase in
engine rpm is detected, press “ENTER” to continue.
NOTE:
If after 30 seconds an increase in engine idle speed is not
detected, “RPM NOT DETECTED” will be displayed. Press
“ENTER” to restart the test.
11. Diagnostic result is displayed on the tester. Refer to SC-20,
"DIAGNOSTIC RESULT ITEM CHART" .
12. Press “ENTER” then test output code is displayed. Record the
test output code on the repair order.
13. Toggle back to the “DIAGNOSTIC SCREEN” for test results.
DIAGNOSTIC RESULT ITEM CHART
SEL421X
SEL422X
SEL577X
Diagnostic item Service procedure
CHARGING SYSTEM NORMAL Charging system is normal and will also show DIODE RIPPLE test result.
NO CHARGING VOLTAGE Go to SC-21, "
WORK FLOW" .
LOW CHARGING VOLTAGE Go to SC-21, "
WORK FLOW" .
HIGH CHARGING VOLTAGE Go to SC-21, "
WORK FLOW" .
DIODE RIPPLE NORMAL Diode ripple is OK and will also show CHARGING VOLTAGE test result.
EXCESS RIPPLE DETECTEDReplace the generator. Perform “DIODE RIPPLE” test again using Battery/Starting/Charging
system tester to confirm repair.
DIODE RIPPLE NOT DETECTED Go to SC-21, "
WORK FLOW" .
Page 2942 of 3371
CHARGING SYSTEM
SC-21
C
D
E
F
G
H
I
J
L
MA
B
SC
Revision: August 20072004 QX56
WORK FLOW
WKIA2109E
Page 2943 of 3371
SC-22
CHARGING SYSTEM
Revision: August 20072004 QX56
DIAGNOSTIC PROCEDURE 1
Check Terminal "3" Circuit
1. CHECK “3” TERMINAL CONNECTION
1. Turn the ignition switch OFF.
2. Check to see if “3” terminal is clean and tight.
OK or NG
OK >> GO TO 2.
NG >> Repair “3” terminal connection. Confirm repair by performing complete Battery/Starting/Charging
system test.
2. CHECK “3” TERMINAL CIRCUIT
1. Disconnect E205 connector from generator.
2. Apply ground to connector E205 terminal 3 (BR/W) with the igni-
tion switch in the ON position.
OK or NG
OK >> GO TO SC-21, "WORK FLOW" .
NG >> Check the following.
10A fuse [No. 14, located in fuse block (J/B)]
CHARGE lamp
Harness for open or short between combination
meter and fuse
Harness for open or short between combination meter and generator CHARGE lamp should light up.
WKIA2110E
Page 2944 of 3371
CHARGING SYSTEM
SC-23
C
D
E
F
G
H
I
J
L
MA
B
SC
Revision: August 20072004 QX56
DIAGNOSTIC PROCEDURE 2
Check Terminal "1" Circuit
1. CHECK “1” TERMINAL CONNECTION
1. Turn the ignition switch OFF.
2. Check to see if “1” terminal is clean and tight.
OK or NG
OK >> GO TO 2.
NG >> Repair “1” terminal connection. Confirm repair by performing complete Battery/Starting/Charging
system test.
2. CHECK GENERATOR “1” TERMINAL CIRCUIT
Check voltage between generator connector E206 terminal 1 (B/R)
and ground using a digital circuit tester.
OK or NG
OK >> GO TO 3.
NG >> Check the following.
140A fusible link (letter a , located in fusible link box)
Harness for open or short between generator and fus-
ible link
3. CHECK “1” TERMINAL CONNECTION QUALITY (VOLTAGE DROP TEST)
Check voltage between generator connector E206 terminal 1 (B/R)
and battery positive terminal using a digital circuit tester.
OK or NG
OK >> Replace the generator. Refer to SC-27, "Removal and
Installation" . Confirm repair by performing complete
Battery/Starting/Charging system test.
NG >> Check harness between the battery and the generator
for poor continuity.
DIAGNOSTIC PROCEDURE 3
Check Terminal "3" Circuit
1. CHECK “3” TERMINAL CONNECTION
1. Turn the ignition switch OFF.
2. Check to see if “3” terminal is clean and tight.
OK or NG
OK >> GO TO 2.
NG >> Repair “3” terminal connection. Confirm repair by performing complete Battery/Starting/Charging
system test. Battery voltage should exist.
W K I A 2111 E
With engine running
at idle and warm.: Less than 0.2V
WKIA2112E
Page 2945 of 3371
SC-24
CHARGING SYSTEM
Revision: August 20072004 QX56
2. CHECK “3” TERMINAL CIRCUIT
1. Disconnect E205 connector from generator.
2. Apply ground to connector E205 terminal 3 (BR/W) with the igni-
tion switch in the ON position.
OK or NG
OK >> Replace the generator. Refer to SC-27, "Removal and
Installation" . Confirm repair by performing complete
battery/starting/charging system test.
NG >> Check the following.
10A fuse [No. 14, located in fuse block (J/B)]
CHARGE lamp
Harness for open or short between combination meter and fuse
Harness for open or short between combination meter and generator CHARGE lamp should light up.
WKIA2110E
Page 2946 of 3371
CHARGING SYSTEM
SC-25
C
D
E
F
G
H
I
J
L
MA
B
SC
Revision: August 20072004 QX56
DIAGNOSTIC PROCEDURE 4
Check Terminal "1" Circuit
1. CHECK “1” TERMINAL CONNECTION
1. Turn the ignition switch OFF.
2. Check to see if “1” terminal is clean and tight.
OK or NG
OK >> GO TO 2.
NG >> Repair “1” terminal connection. Confirm repair by performing complete Battery/Starting/Charging
system test.
2. CHECK GENERATOR “1” TERMINAL CIRCUIT
Check voltage between generator connector E206 terminal 1 (B/R)
and ground using a digital circuit tester.
OK or NG
OK >> GO TO 3.
NG >> Check the following.
140A fusible link (letter a , located in fusible link box)
Harness for open or short between generator and fus-
ible link
3. CHECK “1” TERMINAL CONNECTION QUALITY (VOLTAGE DROP TEST)
1. Start the engine.
2. Check voltage between generator connector E206 terminal 1 (B/
R) and battery positive terminal using a digital circuit tester.
OK or NG
OK >> GO TO 4.
NG >> Check harness between the battery and the generator
for poor continuity.
4. CHECK GENERATOR DRIVE BELT TENSION
1. Turn the ignition switch OFF.
2. Check generator drive belt tension. Refer to EM-12, "
DRIVE BELTS" .
OK or NG
OK >> Replace the generator. Refer to SC-27, "Removal and Installation" . Confirm repair by performing
complete battery/starting/charging system test.
NG >> Readjust drive belt tension. Refer to EM-12, "
Tension Adjustment" . Battery voltage should exist.
W K I A 2111 E
With engine running
at idle and warm.: Less than 0.2V
WKIA2112E
Page 2947 of 3371
SC-26
CHARGING SYSTEM
Revision: August 20072004 QX56
DIAGNOSTIC PROCEDURE 5
Check Terminal "4" Circuit
1. CHECK “4” TERMINAL CONNECTION
1. Turn the ignition switch OFF.
2. Check to see if “4” terminal is clean and tight.
OK or NG
OK >> GO TO 2.
NG >> Repair “4” terminal connection. Confirm repair by performing complete Battery/Starting/Charging
system test.
2. CHECK GENERATOR “4” TERMINAL CIRCUIT
Check voltage between generator connector E205 terminal 4 (Y/B)
and ground using a digital circuit tester.
OK or NG
OK >> GO TO 3.
NG >> Check the following.
10A fuse (No. 30, located in fuse and fusible link box)
Harness for open or short between generator and
fuse
3. CHECK “4” TERMINAL CONNECTION QUALITY (VOLTAGE DROP TEST)
1. Start the engine.
2. Check voltage between generator connector E205 terminal 4 (Y/
B) and battery positive terminal using a digital circuit tester.
OK or NG
OK >> Replace the generator. Refer to SC-27, "Removal and
Installation" . Confirm repair by performing complete
Battery/Starting/Charging system test.
NG >> Check harness between the battery and the generator
for poor continuity. Battery voltage should exist.
WKIA2113E
With engine running
at idle and warm.: Less than 0.2V
WKIA2114E
Page 2948 of 3371
CHARGING SYSTEM
SC-27
C
D
E
F
G
H
I
J
L
MA
B
SC
Revision: August 20072004 QX56
MALFUNCTION INDICATOR
The IC regulator warning function activates to illuminate “CHARGE” warning lamp, if any of the following
symptoms occur while generator is operating:
Excessive voltage is produced.
No voltage is produced.
Removal and InstallationEKS0079H
REMOVAL
1. Disconnect the negative battery terminal.
2. Remove the fan shroud. Refer to CO-10, "
Removal and Installation" .
3. Remove the drive belt. Refer to EM-12, "
Removal and Installation" .
4. Remove the lower bracket, using power tools.
5. Remove the generator upper bolt, using power tools.
6. Disconnect the generator harness connectors.
7. Remove the generator.
INSTALLATION
Installation is in the reverse order of removal.
Install the generator and check the tension of the drive belt. Refer to EM-12, "Tension Adjustment" .
CAUTION:
Tighten terminal "1" nut carefully.
WKIA1390E
Terminal "1" nut : 10.8 N·m (1.1 kg-m, 8 ft-lb)
Page 2949 of 3371
SC-28
SERVICE DATA AND SPECIFICATIONS (SDS)
Revision: August 20072004 QX56
SERVICE DATA AND SPECIFICATIONS (SDS)PFP:00030
BatteryEKS0079J
StarterEKS0079K
GeneratorEKS0079L
Typ eGr. 27
Capacity (20 HR) minimum 12V - 80AH
Cold cranking current A
(For reference value)710
ApplicationAll models
ManufacturerMitsubishi
M002T85571ZCKD
Ty peReduction gear type
System voltage 12V
No-loadTerminal voltage 11V
Current Less than 145A
Revolution More than 3,300 rpm
Minimum diameter of commutator 31.4 mm (1.236 in)
Minimum length of brush 11.0 mm (0.433 in)
Brush spring tension 26.7 - 36.1 N (2.72 - 3.68 kg, 5.93 - 8.02 lb)
Clearance between pinion front edge and
pinion stopper0.5 - 2.0 mm (0.020 - 0.079 in)
Ty peLR1130-701
Hitachi
Nominal rating12V - 130A
Ground polarityNegative
Minimum revolution under no-load (When 13.5 volts is applied) 1,200 rpm
Hot output current (When 13.5 volts is applied)More than 78A/1,800 rpm
More than 108A/2,500 rpm
More than 130A/5,000 rpm
Regulated output voltage 14.1 - 14.7V @ 25°C
Minimum length of brush 6 mm (0.24 in)
Brush spring pressure 1.0 - 3.432 N (0.102 - 0.3501 kg, 0.22 - 0.7715 lbs)
Slip ring minimum outer diameter 26 mm (1.02 in)
Rotor (Field coil) resistance 2.1 ohms
Page 2950 of 3371
SE-1
SEAT
I BODY
CONTENTS
C
D
E
F
G
H
J
K
L
M
SECTION SE
A
B
SE
Revision: August 20072004 QX56 PRECAUTIONS .......................................................... 3
Precautions for Supplemental Restraint System
(SRS) “AIR BAG” and “SEAT BELT PRE-TEN-
SIONER” .................................................................. 3
Precautions for Work ................................................ 3
PREPARATION ........................................................... 4
Special Service Tool ................................................. 4
Commercial Service Tool ......................................... 4
SQUEAK AND RATTLE TROUBLE DIAGNOSES ..... 5
Work Flow ................................................................ 5
CUSTOMER INTERVIEW ..................................... 5
DUPLICATE THE NOISE AND TEST DRIVE ....... 6
CHECK RELATED SERVICE BULLETINS ........... 6
LOCATE THE NOISE AND IDENTIFY THE
ROOT CAUSE ...................................................... 6
REPAIR THE CAUSE ........................................... 6
CONFIRM THE REPAIR ....................................... 7
Generic Squeak and Rattle Troubleshooting ........... 7
INSTRUMENT PANEL .......................................... 7
CENTER CONSOLE ............................................. 7
DOORS ................................................................. 7
TRUNK .................................................................. 8
SUNROOF/HEADLINER ....................................... 8
OVERHEAD CONSOLE (FRONT AND REAR) ..... 8
SEATS .................................................................. 8
UNDERHOOD ....................................................... 8
Diagnostic Worksheet .............................................. 9
AUTOMATIC DRIVE POSITIONER ...........................11
Component Parts And Harness Connector Location
....11
Manual Operation ................................................... 12
Automatic Operation .............................................. 12
System Description ................................................ 12
FAIL-SAFE MODE .............................................. 13
CANCEL OF FAIL-SAFE MODE ......................... 13
MEMORY STORING AND KEYFOB INTER-
LOCK STORING ................................................. 14
MEMORY OPERATION ...................................... 15
ENTRY OPERATION .......................................... 15
EXITING OPERATION ........................................ 15KEYFOB INTERLOCK OPERATION .................. 16
CAN Communication System Description .............. 16
Schematic ............................................................... 17
Wiring Diagram — AUT/DP — ............................... 19
Terminals and Reference Values for BCM .............. 29
Terminals and Reference Values for Driver Seat
Control Unit ............................................................. 29
Terminals and Reference Values for Automatic
Drive Positioner Control Unit .................................. 31
Work Flow ............................................................... 33
Preliminary Check .................................................. 34
SETTING CHANGE FUNCTION ......................... 34
POWER SUPPLY AND GROUND CIRCUIT
INSPECTION ...................................................... 34
CONSULT-II Function (AUTO DRIVE POS.) .......... 37
CONSULT-II INSPECTION PROCEDURE .......... 37
SELF-DIAGNOSIS RESULTS ............................. 39
DATA MONITOR ................................................. 40
ACTIVE TEST ..................................................... 41
CAN Communication Inspection Using CONSULT-
II (Self-Diagnosis) ................................................... 41
Symptom Chart ....................................................... 41
Sliding Motor Circuit Inspection .............................. 43
Reclining Motor LH Circuit Inspection .................... 44
Lifting Motor (Front) Circuit Inspection ................... 46
Lifting Motor (Rear) Circuit Inspection .................... 47
Pedal Adjusting Motor Circuit Inspection ................ 49
Mirror Motor LH Circuit Check ................................ 50
Mirror Motor RH Circuit Check ............................... 52
Steering Wheel Tilt Circuit Inspection ..................... 53
Sliding Sensor Circuit Inspection ............................ 55
Reclining Sensor Circuit Inspection ........................ 56
Lifting Sensor (Front) Circuit Inspection ................. 57
Lifting Sensor (Rear) Circuit Inspection .................. 58
Pedal Adjusting Sensor Circuit Inspection .............. 59
Mirror Sensor LH Circuit Check .............................. 60
Mirror Sensor RH Circuit Check ............................. 62
Steering Wheel Tilt Sensor Circuit Inspection ........ 64
Sliding Switch Circuit Inspection ............................. 66
Reclining Switch Inspection .................................... 67