light INFINITI QX56 2006 Factory Service Manual
Page 2443 of 3383
LT-36
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
Revision: November 20092006 QX56
SchematicEKS00B8G
WKWA3641E 
Page 2444 of 3383
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -LT-37
C
DE
F
G H
I
J
L
M A
B
LT
Revision: November 2009 2006 QX56
Wiring Diagram — DTRL —EKS00B8H
WKWA3642E 
Page 2445 of 3383
LT-38
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
Revision: November 20092006 QX56
WKWA3643E 
Page 2446 of 3383
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -LT-39
C
DE
F
G H
I
J
L
M A
B
LT
Revision: November 2009 2006 QX56
WKWA3644E 
Page 2447 of 3383
LT-40
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
Revision: November 20092006 QX56
WKWA3645E 
Page 2448 of 3383
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -LT-41
C
DE
F
G H
I
J
L
M A
B
LT
Revision: November 2009 2006 QX56
Terminals and Reference Values for BCMEKS00B8I
Te r m i n a l  
No. Wire 
color Signal name Measuring condition
Reference value
(Approx.)
Ignition 
switch Operation or condition
2 SB Combination switch input 5 ONLighting, turn, wiper OFF
Wiper dial position 4
3 G/Y Combination switch input 4 ONLighting, turn, wiper OFF
Wiper dial position 4
4 Y Combination switch input 3 ONLighting, turn, wiper OFF
Wiper dial position 4
5 G/B Combination switch input 2 ONLighting, turn, wiper OFF
Wiper dial position 4
6 V Combination switch input 1
32 R/G Combination switch output 5 ON Lighting, turn, wiper OFF
Wiper dial position 4
33 R/Y Combination switch output 4 ON Lighting, turn, wiper OFF
Wiper dial position 4
34 L Combination switch output 3 ON Lighting, turn, wiper OFF
Wiper dial position 4
SKIA5291E
SKIA5292E
SKIA5291E
SKIA5292E
SKIA5291E
SKIA5292E
SKIA5291E 
Page 2449 of 3383
LT-42
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
Revision: November 20092006 QX56
How to Proceed With Trouble DiagnosisEKS00B8J
1. Confirm the symptom or customer complaint.
2. Understand operation description and function description. Refer to LT- 3 4 ,  "
System Description" .
3. Perform the Preliminary Check. Refer to  LT- 4 2 ,  "
Preliminary Check" .
4. Check symptom and repair or replace the cause of malfunction.
5. Does the headlamp operate normally? If YES: GO TO 6. If NO: GO TO 4.
6. Inspection End.
Preliminary CheckEKS00B8K
CHECK BCM CONFIGURATION
1. CHECK BCM CONFIGURATION
Confirm BCM configuration for "DTRL" is set to "WITH". Refer to  BCS-14, "
READ CONFIGURATION PROCE-
DURE" .
OK or NG
OK >> Continue preliminary check. Refer to  LT- 4 2 ,  "INSPECTION FOR POWER SUPPLY AND
GROUND CIRCUIT" .
NG >> Change BCM configuration for "DTRL" to "WITH". Refer to  BCS-16, "
WRITE CONFIGURATION
PROCEDURE" .
INSPECTION FOR POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES AND FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to  LT- 3 7 ,  "
Wiring Diagram — DTRL —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse or fusible link is blown, be sure to eliminate cause of malfunction before installing new fuse or fusible link. Refer to  PG-4, "
POWER SUPPLY ROUTING CIRCUIT" .
35 O/B Combination switch output 2
ONLighting, turn, wiper OFF
Wiper dial position 4
36 R/W Combination switch output 1
38 W/L Ignition switch (ON)  ON— Battery voltage
39 L CAN-H ———
40 P CAN-L ———
67 B Ground ON— 0V
70 W/B Battery power supply (fusible link) OFF —Battery voltage
Terminal 
No. Wire 
color Signal name Measuring condition
Reference value
(Approx.)
Ignition 
switch Operation or condition
SKIA5292E
Unit
Power sourceFuse and fusible link No.
BCM Battery
f
Ignition switch ON or START position 59
Daytime light relay Battery45 
Page 2450 of 3383
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -LT-43
C
DE
F
G H
I
J
L
M A
B
LT
Revision: November 2009 2006 QX56
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connectors.
2. Check voltage between BCM harness connector and ground.
OK or NG
OK >> GO TO 3.
NG >> Check harness for open or short between BCM and fuse or fusible link.
3. CHECK GROUND CIRCUIT
Check continuity between BCM harness connector and ground.
OK or NG
OK >> Inspection End.
NG >> Check ground circuit harness.
INSPECTION PARKING BRAKE SWITCH CIRCUIT
1. CHECK BRAKE INDICATOR
1. Turn ignition switch ON.
2. Apply parking brake.
3. Release parking brake.
OK or NG
OK >> Inspection End.
NG >> GO TO 2.
BCM Ignition switch position
(+) (– )OFFACCON
Connector Terminal
M18 38 Ground0V 0V
Battery 
voltage
M20 70 Battery 
voltage Battery 
voltage Battery 
voltage
WKIA1436E
BCM Continuity
Connector Terminal
M20 67Ground Yes
LIIA0915E
Brake indicator in combination meter should illuminate 
when parking brake is applied and turn OFF when 
released. 
Page 2451 of 3383
LT-44
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
Revision: November 20092006 QX56
2. CHECK PARKING BRAKE SWITCH SIGNAL
1. Turn ignition switch OFF.
2. Disconnect parking brake switch connector.
3. Turn ignition switch ON.
4. Check voltage between parking brake switch connector M11 ter- minal 1 and ground.
OK or NG
OK >> Replace parking brake switch.
NG >> GO TO 3.
3. CHECK PARKING BRAKE SWITCH CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect combination meter connector.
3. Check continuity between combination meter connector M24 (A) terminal 23 and parking brake switch connector M11 (B) terminal
1.
OK or NG
OK >> Replace combination meter. Refer to IP-13, "COMBINA-
TION METER" .
NG >> Repair harness or connector.
CONSULT-II FunctionsEKS00B8L
Refer to  LT- 1 6 ,  "CONSULT-II Function (BCM)"  in HEADLAMP (FOR USA).
Refer to  LT- 1 9 ,  "
CONSULT-II Function (IPDM E/R)"  in HEADLAMP (FOR USA).
Daytime Light Control Does Not Operate Properly (Normal Headlamps Operate 
Properly)
EKS00D6B
1. CHECK DAYTIME LIGHT RELAY POWER SUPPLY CIRCUIT
1. Remove daytime light relay.
2. Check voltage between daytime light relay connector E103 ter- minals 2, 5 and ground.
OK or NG
OK >> GO TO 2.
NG >> Repair harness or connector. 1 - Ground
: Battery voltage should exist.
WKIA4609E
1 - 23: Continuity should exist.
WKIA4610E
2, 5 - Ground : Battery voltage should exist.
WKIA4611E 
Page 2452 of 3383
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -LT-45
C
DE
F
G H
I
J
L
M A
B
LT
Revision: November 2009 2006 QX56
2. CHECK DAYTIME LIGHT RELAY
1. Apply battery voltage to daytime light relay terminal 2 and ground terminal 1.
2. Check continuity between terminals 3 and 5.
OK or NG
OK >> GO TO 3.
NG >> Replace daytime light relay.
3. CHECK DAYTIME LIGHT RELAY CIRCUIT
1. Disconnect IPDM E/R connector E122.
2. Check continuity between daytime light relay connector E103 (B) terminal 1 and front combination lamp LH connector E122
(A) terminal 44.
OK or NG
OK >> GO TO 4.
NG >> Repair harness or connector.
4. CHECK INPUT SIGNAL 
1. Connect daytime light relay and IPDM E/R connector.
2. Start engine and release parking brake. Headlamp switch OFF.
3. Select "IPDM E/R" on CONSULT-II. With data monitor, make sure "DTRL REQ" turns ON-OFF linked with operation of park-
ing brake switch. 
OK or NG
OK >> Replace IPDM E/R. Refer to  PG-30, "Removal and
Installation of IPDM E/R" .
NG >> GO TO 5.
5. CHECKING CAN COMMUNICATIONS 
Select "BCM" on CONSULT-II and perform self-diagnosis for BCM.
Displayed self-diagnosis results
NO DTC>> Replace BCM. Refer to  BCS-20, "BCM" .
CAN COMM CIRCUIT>> Check BCM CAN communication system.
Refer to BCS-13, "
CAN Communication Inspection
Using CONSULT-II (Self-Diagnosis)" .
3 - 5 : Continuity should exist.
SKIB4671E
44 - 1
: Continuity should exist.
WKIA4612E
Parking brake ON : DTRL REQ ON
Parking brake OFF : DTRL REQ OFF
WKIA1449E
SKIA1039E