engine coolant INFINITI QX56 2006 Factory Manual Online
Page 1892 of 3383
EM-1
ENGINE MECHANICAL
B ENGINE
CONTENTS
C
DE
F
G H
I
J
K L
M
SECTION
A
EM
Revision: November 2009 2006 QX56
PRECAUTIONS .....................................................
..... 3
Precautions for Supplemental Restraint System
(SRS) “AIR BAG” and “SEAT BELT PRE-TEN-
SIONER” ............................................................. ..... 3
Precautions for Drain Engine Coolant ................. ..... 3
Precautions for Disconnecting Fuel Piping ......... ..... 3
Precautions for Removal and Disassembly ........ ..... 3
Precautions for Inspection, Repair and Replace-
ment .................................................................... ..... 3
Precautions for Assembly and Installation .......... ..... 3
Parts Requiring Angular Tightening .................... ..... 4
Precautions for Liquid Gasket ............................. ..... 4
REMOVAL OF LIQUID GASKET SEALING ..... ..... 4
LIQUID GASKET APPLICATION PROCEDURE ..... 4
PREPARATION ...................................................... ..... 6
Special Service Tools .......................................... ..... 6
Commercial Service Tools ................................... ..... 8
NOISE, VIBRATION, AND HARSHNESS (NVH)
TROUBLESHOOTING ........................................... ... 10
NVH Troubleshooting —Engine Noise ................ ... 10
Use the Chart Below to Help You Find the Cause
of the Symptom. .................................................. .... 11
ENGINE ROOM COVER ....................................... ... 12
Removal and Installation ..................................... ... 12
REMOVAL ........................................................ ... 12
INSTALLATION ................................................ ... 12
DRIVE BELTS ........................................................ ... 13
Checking Drive Belts ........................................... ... 13
DRIVE BELT TENSION ................................... ... 13
Removal and Installation ..................................... ... 13
REMOVAL ........................................................ ... 13
INSTALLATION ................................................ ... 14
Drive Belt Auto Tensioner and Idler Pulley .......... ... 14
REMOVAL ........................................................ ... 14
INSTALLATION ................................................ ... 14
AIR CLEANER AND AIR DUCT ............................ ... 15
Removal and Installation ..................................... ... 15
REMOVAL ........................................................ ... 15INSTALLATION ................................................
... 15
Removal and Installation (Viscous paper type) ... ... 16
REMOVAL ........................................................ ... 16
INSTALLATION ................................................ ... 16
INTAKE MANIFOLD .............................................. ... 17
Removal and Installation ..................................... ... 17
REMOVAL ........................................................ ... 17
INSTALLATION ................................................ ... 19
INSPECTION AFTER INSTALLATION ............. ... 20
EXHAUST MANIFOLD AND THREE WAY CATA-
LYST ....................................................................... ... 21
Removal and Installation ..................................... ... 21
REMOVAL ........................................................ ... 21
INSPECTION AFTER REMOVAL .................... ... 22
INSTALLATION ................................................ ... 22
OIL PAN AND OIL STRAINER .............................. ... 24
Removal and Installation ..................................... ... 24
REMOVAL ........................................................ ... 24
INSPECTION AFTER REMOVAL .................... ... 25
INSTALLATION ................................................ ... 26
INSPECTION AFTER INSTALLATION ............. ... 27
IGNITION COIL ...................................................... ... 28
Removal and Installation ..................................... ... 28
REMOVAL ........................................................ ... 28
INSTALLATION ................................................ ... 28
SPARK PLUG (PLATINUM-TIPPED TYPE) .......... ... 29
Removal and Installation ..................................... ... 29
REMOVAL ........................................................ ... 29
INSPECTION AFTER REMOVAL .................... ... 29
INSTALLATION ................................................ ... 30
FUEL INJECTOR AND FUEL TUBE ..................... ... 31
Removal and Installation ..................................... ... 31
REMOVAL ........................................................ ... 31
INSTALLATION ................................................ ... 32
INSPECTION AFTER INSTALLATION ............. ... 34
ROCKER COVER .................................................. ... 35
Removal and Installation ..................................... ... 35
REMOVAL ........................................................ ... 35
INSTALLATION ................................................ ... 36
Page 1894 of 3383
PRECAUTIONSEM-3
C
DE
F
G H
I
J
K L
M A
EM
Revision: November 2009 2006 QX56
PRECAUTIONSPFP:00001
Precautions for Supplemental Restraint System (SRS) “AIR BAG” and “SEAT
BELT PRE-TENSIONER”
EBS00REI
The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER ”, used along
with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain
types of collision. This system includes seat belt switch inputs and dual stage front air bag modules. The SRS
system uses the seat belt switches to determine the front air bag deployment, and may only deploy one front
air bag, depending on the severity of a collision and whether the front occupants are belted or unbelted.
Information necessary to service the system safely is included in the SRS and SB section of this Service Man-
ual.
WARNING:
To avoid rendering the SRS inoperative, which could increase the risk of personal injury or death
in the event of a collision which would result in air bag inflation, all maintenance must be per-
formed by an authorized NISSAN/INFINITI dealer.
Improper maintenance, including incorrect removal and installation of the SRS, can lead to per-
sonal injury caused by unintentional activation of the system. For removal of Spiral Cable and Air
Bag Module, see the SRS section.
Do not use electrical test equipment on any circuit related to the SRS unless instructed to in this
Service Manual. SRS wiring harnesses can be identified by yellow and/or orange harnesses or
harness connectors.
Precautions for Drain Engine CoolantEBS00REJ
Drain engine coolant when engine is cooled.
Precautions for Disconnecting Fuel PipingEBS00REK
Before starting work, make sure no fire or spark producing items are in the work area.
Release fuel pressure before disconnecting and disassembly.
After disconnecting pipes, plug openings to stop fuel leakage.
Precautions for Removal and DisassemblyEBS00REL
When instructed to use special service tools, use the specified tools. Always be careful to work safely,
avoid forceful or uninstructed operations.
Exercise maximum care to avoid damage to mating or sliding surfaces.
Cover openings of engine system with tape or the equivalent, if necessary, to seal out foreign materials.
Mark and arrange disassembly parts in an organized way for easy troubleshooting and assembly.
When loosening nuts and bolts, as a basic rule, start with the one furthest outside, then the one diagonally
opposite, and so on. If the order of loosening is specified, do exactly as specified. Power tools may be
used where noted in the step.
Precautions for Inspection, Repair and ReplacementEBS00REM
Before repairing or replacing, thoroughly inspect parts. Inspect new replacement parts in the same way, and
replace if necessary.
Precautions for Assembly and InstallationEBS00REN
Use torque wrench to tighten bolts or nuts to specification.
When tightening nuts and bolts, as a basic rule, equally tighten in several different steps starting with the
ones in center, then ones on inside and outside diagonally in this order. If the order of tightening is speci-
fied, do exactly as specified.
Replace with new gasket, packing, oil seal or O-ring.
Thoroughly wash, clean, and air-blow each part. Carefully check engine oil or engine coolant passages for
any restriction and blockage.
Avoid damaging sliding or mating surfaces. Completely remove foreign materials such as cloth lint or dust.
Before assembly, oil sliding surfaces well.
Release air within route when refilling after draining engine coolant.
Page 1895 of 3383
EM-4Revision: November 2009
PRECAUTIONS
2006 QX56
Before starting engine, apply fuel pressure to fuel lines with turning ignition switch ON (with engine
stopped). Then make sure that there are no leaks at fuel line connections.
After repairing, start engine and increase engine speed to check engine coolant, fuel, oil, and exhaust
systems for leakage.
Parts Requiring Angular TighteningEBS00REO
For final tightening of the following engine parts use Tool:
–Cylinder head bolts
–Main bearing cap bolts
–Connecting rod cap bolts
–Crankshaft pulley bolt (No angle wrench is required as the bolt flange is provided with notches for angle
tightening)
Do not use a torque value for final tightening.
The torque value for these parts are for a preliminary step.
Ensure thread and seat surfaces are clean and lightly coated with engine oil.
Precautions for Liquid GasketEBS00REP
REMOVAL OF LIQUID GASKET SEALING
After removing the bolts and nuts, separate the mating surface
and remove the old liquid gasket sealing using Tool.
CAUTION:
Do not damage the mating surfaces.
Tap the seal cutter to insert it.
In areas where the Tool is difficult to use, lightly tap to slide it.
LIQUID GASKET APPLICATION PROCEDURE
1. Remove the old liquid gasket adhering to the gasket applicationsurface and the mating surface using suitable tool.
Remove the liquid gasket completely from the groove of the
liquid gasket application surface, bolts, and bolt holes.
2. Thoroughly clean the mating surfaces and remove adhering moisture, grease and foreign material.
3. Attach the liquid gasket tube to the Tool. Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-46, "
Recommended Chemical Products and Sealants" .
4. Apply the liquid gasket without breaks to the specified location with the specified dimensions.Tool number : KV10112100 (BT-8653-A)
Tool number : KV10111100 (J-37228)
WBIA0566E
PBIC0003E
Tool number : WS39930000 ( — )
WBIA0567E
Page 1896 of 3383
PRECAUTIONSEM-5
C
DE
F
G H
I
J
K L
M A
EM
Revision: November 2009 2006 QX56
If there is a groove for the liquid gasket application, apply the
liquid gasket to the groove.
As for the bolt holes, normally apply the liquid gasket inside
the holes. If specified in the procedure, it should also be
applied outside the holes.
Within five minutes of liquid gasket application, install the mat-
ing component.
If the liquid gasket protrudes, wipe it off immediately.
Do not retighten after the installation.
Wait 30 minutes or more after installation before refilling the
engine with engine oil and engine coolant.
CAUTION:
If there are specific instructions in this manual, observe them.SEM159F
Page 1908 of 3383
INTAKE MANIFOLDEM-17
C
DE
F
G H
I
J
K L
M A
EM
Revision: November 2009 2006 QX56
INTAKE MANIFOLDPFP:14003
Removal and InstallationEBS00RF0
REMOVAL
1. Partially drain the engine coolant. Refer to CO-11, "DRAINING ENGINE COOLANT" .
WARNING:
To avoid the danger of being scalded, never drain the engine coolant when the engine is hot.
2. Remove the engine room cover using power tool. Refer to EM-12, "
REMOVAL" .
3. Release the fuel pressure. Refer to EC-80, "
FUEL PRESSURE RELEASE" .
4. Remove the air duct and resonator assembly. Refer to EM-15, "
REMOVAL" .
5. Disconnect the fuel tube quick connector on the engine side.
1. Intake manifold 2. PCV hose 3. Gasket
4. Electric throttle control actuator 5. Water hose 6. Water hose
7. PCV hose 8. EVAP hose 9. EVAP canister purge control sole-
noid valve
10. Bracket 11. Gasket
KBIA2461E
LBIA0395E
Page 1911 of 3383
EM-20Revision: November 2009
INTAKE MANIFOLD
2006 QX56
5. Install the quick connector cap on the quick connector joint (onengine side only).
6. Install the fuel hose and tube to hose clamps.
7. Refill the engine coolant. Refer to CO-11, "
REFILLING ENGINE
COOLANT" .
INSPECTION AFTER INSTALLATION
After installing fuel tubes, make sure there is no fuel leakage at connections in the following steps.
–Apply fuel pressure to fuel lines by turning ignition switch ON (with engine stopped). Then check for fuel
leaks at connections.
–Start the engine and rev it up and check for fuel leaks at the connections.
Perform procedures for “Throttle Valve Closed Position Learning ” after finishing repairs. Refer to EC-78,
"Throttle Valve Closed Position Learning" .
If electric throttle control actuator is replaced, perform procedures for “Idle Air Volume Learning” after fin-
ishing repairs. Refer to EC-78, "
Idle Air Volume Learning" .
SBIA0354E
Page 1955 of 3383
EM-64Revision: November 2009
CYLINDER HEAD
2006 QX56
Removal and InstallationEBS00RFE
REMOVAL
1. Remove the engine assembly from the vehicle. Refer to EM-74, "Removal and Installation" .
2. Remove the following components and related parts:
Drive belt auto tensioner drive belts and idler pulley. Refer to EM-14, "REMOVAL" .
Thermostat housing and hose. Refer to CO-21, "Removal and Installation" .
Oil pan and oil strainer. Refer to EM-24, "Removal and Installation" .
Fuel tube and fuel injector assembly. Refer to EM-31, "Removal and Installation" .
Intake manifold. Refer to EM-17, "Removal and Installation" .
Ignition coil. Refer to EM-28, "Removal and Installation" .
Rocker cover. Refer to EM-35, "Removal and Installation" .
3. Remove the crankshaft pulley, front cover, oil pump, and timing chain. Refer to EM-37, "
Removal and
Installation" .
4. Remove the camshaft sprockets and camshafts. Refer to EM-46, "
Removal and Installation" .
5. Remove the cylinder head bolts in reverse of order shown.
1. Harness bracket 2. Engine coolant temperature sensor 3. Washer
4. Cylinder head gasket (LH) 5. Cylinder head (RH) 6. Cylinder head bolt
7. Cylinder head gasket (RH) 8. Cylinder head (LH)
KBIA2528E
PBIC0068E
Page 1965 of 3383
EM-74Revision: November 2009
ENGINE ASSEMBLY
2006 QX56
ENGINE ASSEMBLYPFP:10001
Removal and InstallationEBS00RFH
WARNING:
Situate vehicle on a flat and solid surface.
Place chocks at front and back of rear wheels.
For engines not equipped with engine slingers, attach proper slingers and bolts described in
PARTS CATALOG.
CAUTION:
Always be careful to work safely, avoid forceful or uninstructed operations.
Do not start working until exhaust system and engine coolant are cooled sufficiently.
If items or work required are not covered by the engine section, refer to the applicable sections.
Always use the support point specified for lifting.
Use either 2-point lift type or separate type lift. If board-on type is used for unavoidable reasons,
support at the rear axle jacking point with transmission jack or similar tool before starting work, in
preparation for the backward shift of center of gravity.
For supporting points for lifting and jacking point at rear axle, refer to GI-41, "Garage Jack and
Safety Stand" .
REMOVAL
Preparation
1. Drain the engine coolant. Refer to CO-11, "DRAINING ENGINE COOLANT" .
2. Partially drain the A/T fluid. Refer to AT- 1 2 , "
Changing Automatic Transmission Fluid (ATF)" .
3. Release the fuel pressure. Refer to EC-80, "
FUEL PRESSURE RELEASE"
1. Rear engine mounting insulator 4WD 2. Rear engine mounting insulator 2WD 3. LH engine mounting bracket
4. LH heat shield plate 5. LH engine mounting insulator 6. RH engine mounting bracket
7. RH heat shield plate 8. RH engine mounting insulator
LBIA0397E
Page 1966 of 3383
ENGINE ASSEMBLYEM-75
C
DE
F
G H
I
J
K L
M A
EM
Revision: November 2009 2006 QX56
4. Remove the engine hood. Refer to BL-13, "Removal and Installation of Hood Assembly" .
5. Remove the cowl extension. Refer to EI-18, "
Removal and Installation" .
6. Remove the engine room cover using power tools.
7. Remove the air duct and air cleaner case assembly. Refer to EM-15, "
Removal and Installation" .
8. Disconnect the vacuum hose between the vehicle and engine and set it aside.
9. Remove the radiator assembly and hoses. Refer to CO-14, "
Removal and Installation" .
10. Remove the drive belts. Refer to EM-13, "
Removal and Installation" .
11. Remove the fan blade. Refer to CO-17, "
Removal and Installation (Crankshaft Driven Type)" .
12. Disconnect the engine room harness from the fuse box and set it aside.
13. Disconnect the ECM.
14. Disconnect the engine room harness from the engine side and set it aside.
15. Disconnect the engine harness grounds.
16. Disconnect the power steering reservoir tank from the engine and move it aside.
17. Disconnect the power steering oil pump from the engine. Move it aside and secure it using suitable wire or rope. Refer to PS-21, "
Removal and Installation" .
18. Remove the A/C compressor bolts and set the compressor aside. Refer to ATC-175, "
Removal and Instal-
lation for Compressor" (ATC).
19. Disconnect the brake booster vacuum line.
20. Disconnect the EVAP line.
21. Disconnect the fuel hose at the engine side connection. Refer to EM-31, "
Removal and Installation" .
22. Disconnect the heater hoses at the cowl, and install plugs to avoid leakage of engine coolant.
23. Remove the A/T oil level indicator and indicator tube upper bolts.
24. Remove the front final drive assembly (4WD only). Refer to FFD-12, "
Removal and Installation" .
25. Remove the exhaust manifolds. Refer to EM-21, "
Removal and Installation" .
26. Install the engine slingers into the left bank cylinder head and right bank cylinder head.
27. Remove the A/T. Refer to AT- 2 4 3 , "
Removal and Installation
(2WD)" or AT- 2 4 6 , "Removal and Installation (4WD)" .
28. Lift using a hoist and secure the engine in position.
29. Remove the engine assembly from the vehicle, avoid interfer- ence with the vehicle body.
CAUTION:
Before and during lifting, always check if any harnesses
are left connected.
30. Remove the parts that may restrict installation of the engine to the engine stand.
NOTE:
This procedure is described assuming that you use an engine stand mounting to the surface to which the
transmission mounts.
a. Remove the drive plate.
Holding the crankshaft pulley bolt, lock the crankshaft to remove the drive plate bolts.
WBIA0464E
Engine slinger torque: 45.0 N·m (4.6 kg-m, 33 ft-lb)
WBIA0715E
Page 1967 of 3383
EM-76Revision: November 2009
ENGINE ASSEMBLY
2006 QX56
Loosen the bolts diagonally.
CAUTION:
Be careful not to damage the drive plate. Especially
avoid deforming and damaging of the signal plate teeth
(circumference position).
Place the drive plate with the signal plate surface fac-
ing other than downward.
Keep magnetic materials away from the signal plate.
CAUTION:
Use an engine stand that has a load capacity [approximately 240kg (529 lb) or more] large enough
for supporting the engine weight.
If the load capacity of the stand is not adequate, remove the following parts beforehand to
reduce the potential risk of overturning the stand.
–Remove the fuel tube and fuel injector assembly. Refer to EM-31, "Removal and Installation" .
–Remove the intake manifold. Refer to EM-17, "Removal and Installation" .
–Remove the ignition coil. Refer to EM-28, "Removal and Installation" .
–Remove the rocker cover. Refer to EM-35, "Removal and Installation" .
–Other removable brackets.
CAUTION:
Before removing the hanging chains, make sure the engine stand is stable and there is no risk of
overturning.
31. Remove the alternator. Refer to SC-25, "
REMOVAL" .
32. Remove the engine mounting insulator and bracket using power tool.
INSTALLATION
Installation is in the reverse order of removal.
CAUTION:
When replacing an engine or transmission you must make sure the dowels are installed correctly
during re-assembly.
Improper alignment caused by missing dowels may cause vibration, oil leaks or breakage of driv-
etrain components.
INSPECTION AFTER INSTALLATION
Before starting the engine, check oil/fluid levels including engine coolant and engine oil. If the levels are
lower than required quantity, fill to the specified level. Refer to MA-11, "
Fluids and Lubricants" .
Use procedure below to check for fuel leakage.
Turn ignition switch ON (with engine stopped). With fuel pressure applied to the fuel piping, check for fuel
leakage at the connection points.
Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gas, or any oils/fluids includ-
ing engine oil and engine coolant.
Bleed air from passages in lines and hoses, such as in cooling system.
After cooling down the engine, again check oil/fluid levels including engine oil and engine coolant. Refill to
specified level if necessary.
Summary of the inspection items:
KBIA2491E