torque MAZDA MX-5 1994 Workshop Manual
Page 740 of 1708
WHEEL ALIGNMENT LEFT WHEEL POSITIVE RIGHT WHEEL POSITIVE Camber Camber is adjusted by turning the front and rear adjust- ing cam bolts at the lower arm. 2 Caution Adjust the camber after adjusting the caster. 1. Loosen the front and rear cam nuts. 2. Turn the front and rear adjusting cam bolts the same amount in the opposite direction to provide the correct camber angle. Left wheel Note Turning the front cam one graduation changes the camber about 25' and the caster about 22'. Turning the rear cam one graduation changes the camber about 2' and the caster about 22'. Right wheel Positive Negative Note If the cam cannot be turned far enough to make the adjustment, begin again at adjustment of the caster using the other cam. i 3. Tighten the nuts. I Caster I Front cam 1 Rear cam I Front cam I Rear cam Tightening torque: 94--112 N.m (9.5-11.5 kgf.m, 69-43 ftlbf) clockwise Counter- Clockwise 4. Adjust the toe-in. Toe-in 1. Remove the steering gear boot clamp. 2. Loosen the left and right tie rod locknuts, and turn the tie rods by the same amount. 3. Loosen the left and right tie rod locknuts and turn the tie rods equally. Both tie rods are right threaded, so turning the right tie rod toward the front of the vehicle and the left toward the rear increases toe-in. Clockwise Counter- clockwise Note Turning both tie rods one complete turn changes toe-in by about 7 mm (0.28 in}. 4. Tighten the tie rod locknuts to the specified torque. Clockwise Counter- clockwise Tightening torque: 35-39 N.m (3.5--4.0 kgf.m, 26--28 ft4bf) Counter- clOCkWise Clockwise 5. Verify that the boot is not twisted, and install the boot - clamp. Gartner Banana
Page 742 of 1708
WHEEL ALIGNMENT RIGHT WHEEL C I I I I Counter- I Counter- I Clockwise I Clockwise I clockwise I 4 Positive clockwise Left wheel Right wheel Note Turning the front cam one graduation changes the camber about 15' and the toe-in about 2.8mm (0.11 in}. Turning the rear cam one graduation changes the camber about 6' and the toe-in about 2.8mm I0.11 in). If the cam cannot be turned far enough to make the adjustment, begin again at adjustment of the toe in using the other cam. Negative 3. Tighten the nuts. Caster Tightening torque: 73-95 Nm (7.4--9.7 kgf.m, 54--70 ft4bf) Front cam I Rear cam I Front cam I Rear cam Counter- clockwise Counter- clockwise Clockwise Gartner Banana
Page 743 of 1708
FRONT SUSPENSION (DOUBLE-WISHBONE) FRONT SUSPENSION (DOUBLE-WISHBONE) PREPARATION SST 49 0727 575 Puller, socket oint Attachment, steering worm bearing preload measuring 49 GO34 1 A0 Compressor, coil spring Screw (Part of - 49 GO34 1 AO) - Wrench, flare nut For removal of lower arm ball joint For 1 49 GO34 101 49 01 18 850C Puller, ball joint For inspection of upper arm ball joint 49 H028 301 Installer, dust boot For 1 49 GO34 103 removal and installation of coil spring Body (Part of 49 GO34 1 AO) For removal and installation of brake pipe removal and installation of coil spring SHOCK ABSORBER AND SPRING Removal / Installation 1. Jack up the front of the vehicle and support it with safety stands. 2. Remove the undercover. 3. Remove the band for the wheel speed sensor harnes. 4. Remove in the order shown in the figure, referring to Removal Note. Arm (Part of 49 GO34 I AO) 5. Inspect all parts and repair or replace as necessary. 6. Install in the reverse order of removal. For removal of upper arm ball joint For installation of front lower arm boot For removal and installation of coil spring For removal and installation of coil spring 7. Loosely tighten the shock absorber, upper arm, stabilizer control link, and stabilizer bracket bolts. Tighten all other nuts and bolts to the specified torques. 8. Install the band for the wheel speed sensor. 9. Lower the vehicle. 10. With the vehicle unloaded, tighten the upper arm and shock absorber bolts to the specified torques. - 11. Adjust the front wheel alignment. (Refer to page R-6.) 25UORX406 Gartner Banana
Page 745 of 1708
FRONT SUSPENSION (DOUBLE-WISHBONE) R Disassembly I Inspection I Assembly 1. Disassemble in the order shown in the figure, referring to Disassembly Note. 2. lnspect all parts and repair or replace as necessary. 3. Assemble in the reverse order of disassembly, referring to Assembly Note. 4. Tighten all nuts and bolts to the specified torques, referring to the figure. (FRONT ONLY) & 3 1. Sheet (front only) 2. Cap 3. Mounting plate 4. Bound stopper lnspect for damage 5. Coil spring .......... Disassembly Note page R-13 ............ Assembly Note page R-14 6. Shock absorber lnspect for oil leakage and abnormal noise Disassembly note Coil spring Warning Removing the coil spring nut is dangerous. The shock absorber and spring could fly off under tre- mendous pressure and cause serious injury or death. Secure the shock absorber in the SST before removing the coil spring nut. 1. Loosen the piston rod upper nut several turns, but do not remove the nut. 2. Assemble the SST. 3. Compress the coil spring with the SST, and remove the upper nut. 4. Remove the coil spring. Gartner Banana
Page 746 of 1708
I3 FRONT SUSPENSION (DOUBLE-WISHBONE) I t'- SHOCK ABSORBER 05UORX-02 Inspection Shock absorber Check the following and replace if necessary. 1. lnspect for damage and oil leakage. 2. lnspect the rubber bushing for deterioration and wear. 3. Compress and extend the shock piston at least three (3) times. Verify that the operational force does not change and that there is no unusual noise. 4. (1) Compress the shock absorber piston and release it. (2) Verify that the piston extends fully at a normal speed. Assembly note Coil spring and bound stopper 1. Set the shock absorber in a vise. 2. Install the bound stopper on the shock absorber as shown. 3. lnstall the compressed coil spring (compressed with SST). 4. Install the mounting plate. 5. Tighten the mounting plate nut, but do not torque it yet. 6. Remove the SST. 7. Secure the mounting plate in a vise. 8. Tighten the piston rod upper nut. Tightening torque: 30-36 N.m (3.0-3.7 kgf.m, 22-26 ftdbf) Disposal of shock absorber Caution The gas in the shock absorber is color less, order less, and non-toxic. Wear safety glasses as drilling chips may be expelled by the pressurized gas. 1. Lay the shock absorber flat. 2. Drill a hole in the shock absorber body. Drill size: 2-3mm (0.08-0.11 in). 3. Allow the gas to escape from the shock absorber. 4. Discard the shock absorber. Gartner Banana
Page 747 of 1708
FRONT SUSPENSION (DOUBLE-WISHBONE) LOWER ARM Removal / lnspection I Installation 1. Jack up the front of the vehicle and support it with safety stands. 2. Remove the undercover. 3. Remove in the order shown in the figure, referring to Removal Note. 4. lnspect all parts and repair or replace as necessary. 5. Install in the reverse order of removal, referring to lnstallation Note. 6. Loosely tighten the lower arm, shock absorber, and stabilizer control link bolts. Tighten all other nuts and bolts to the specified torque with the vehicle unladen. 7. Lower the vehicle. 8. With the vehicle unloaded, tighten the lower arm, shock absorber, and stabilizer control link bolts to the - specified torques. 9. Adjust the front wheel alignment. (Refer to page R-6.) 1. Wheel and tire 15UORX-012 5. Ball joint dust boot 2. Stabilizer control link bolt emo oval ~ote ............. page R-16 3. Shock absorber bolt Installation Note ........... page R-16 u 4. Lower arm ball joint 6. Lower arm Removal Note ............. page R-16 Inspect for damage and cracks Inspection ................. page R-16 7. Lower arm bushing (front and rear) lnspect for deterioration and wear Gartner Banana
Page 748 of 1708
FRONT SUSPENSION (DOUBLE-WISHBONE) Removal note Lower arm ball joint Separate the ball joint from the knuckle with the SST. ./-' Ball joint dust boot Carefully remove the dust boot with a chisel. Installation note Ball joint dust boot 1. Wipe away the grease on the ball joint. 2. Liberally coat the inside of the new dust boot with grease. 3. Press the dust boot onto the ball joint with the SST. J 4. Wipe away any grease that has been expelled from the dust boot. Inspection Lower arm ball joint Ball joint rotation torque 1. Shake the ball joint stud 5 times. 2. Connect the SST to the ball stud, and measure the rota- tion torque with a pull scale. Rotation torque: 0.5-1.4 N.m (5--15 kgf.cm, 4.4--13 in-lbf) Pull scale reading: 5.b14.7 N (0.5-1.5 kgf, 1.1-3.3 Ibf) Gartner Banana
Page 749 of 1708
FRONT SUSPENSION (DOUBLE-WISHBONE) R UPPER ARM Removal I Inspection I Installation 1. Jack up the front of the vehicle and support it with safety stands. L/ 2. Remove the undercover. 3. Remove the band for the wheel speed sensor harness. 4. Remove in the order shown in the figure, referring to Removal Note. 5. lnspect all parts and repair or replace as necessary. 6. Install in the reverse order of removal, referring to Installation Note. 7. Loosely tighten the upper arm and shock absorber bolts. Tighten all other nuts and bolts to the specified torques. 8. Install the band for the wheel speed sensor harnes. 9. Lower the vehicle. 10. With the vehicle unloaded, tighten the upper arm and shock absorber bolts to the specified torques. 11. Adjust the front wheel alignment. (Refer to page R-6.) 25UORX-01 1. Wheel and tire 5, Ball ioint dust boot Upper arm ball joint demoval ~ote ............. page R-18 Removal Note ............. page R-18 Installation Note ........... page R-18 Shock absorber bolt 6. Upper arm bushing (front and rear) 4. Upper arm Inspect for deterioration and damage Inspect for damage and cracks Gartner Banana
Page 750 of 1708
R FRONT SUSPENSION (DOUBLE-WISHBONE) I0.04 in} Removal note Upper arm ball joint Separate the upper arm ball joint from the knuckle with the SST. Ball joint dust boot Carefully remove the dust boot with a chisel. Installation note Ball joint dust boot 1. Liberally coat the inside of the new dust boot with grease. 2. Press the dust boot on with a 30mm (1 118 in) socket until the dust boot contacts the seat. Caution Install the dust boot squarely and do not press excessively; the inner metal ring will be deformed if not done correctly. 3. Verify that the clearance between the boot and the seat is less than 1mm (0.04 in). Inspection Upper arm ball joint Ball joint rotation torque 1. Shake the ball joint stud 5 times. 2. Connect the SST to the ball stud, and measure the rota- tion torque with a pull scale. Rotation torque: O.4--1.7 N.m {&-I 8 kgf.cm, 3.5--15.6 in4 bf) Pull scale reading: 4.b17.6 N (0.4--1.8 kgf, 0.9--3.9 Ibf) Gartner Banana
Page 751 of 1708
FRONT SUSPENSION (DOUBLE-WISHBONE) R STABILIZER Removal / Inspection / installation 1. Jack up the front of the vehicle and support it with safety stands. - 2. Remove the undercover. 3. Remove in the order shown in the figure. 4. lnspect all parts and repair or replace as necessary. 5. Install in the reverse order of removal, referring to Installation Note. 6. Loosely tighten the stabilizer control link and bracket bolts. Tighten all other nuts and bolts to the speci- fied torques. - 7. Lower the vehicle. 8. With the vehicle unloaded, tighten the stabilizer control link and bolts to the specified torques. 1. Stabilizer bracket 3. Stabilizer 2. Stabilizer bushing Inspect for bending and damage Inspect for deterioration and wear 4. Stabilizer control link Installation Note . . . . . . . . . . . . . . . . R-19 Inspect for bending and damage Installation note Align the bushing with the installation mark on the stabi- lizer. Gartner Banana