engine NISSAN 350Z 2007 Z33 Engine Mechanical Repair Manual
Page 77 of 148
CAMSHAFT
EM-77
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 November2007 350Z
INSTALLATION
1. Install timing chain tensioners (secondary) (1) on both sides of
cylinder head.
Install timing chain tensioner with its stopper pin (C) attached.
Install timing chain tensioner with sliding part facing down-
ward on right-side cylinder head, and with sliding part facing
upward on left-side cylinder head.
2. Install valve lifter.
Install it in the original position.
3. Install camshafts.
Follow your identification marks made during removal, or fol-
low the identification marks that are present on new cam-
shafts for proper placement and direction.
Install camshaft so that and dowel pin (A) on front end face
are positioned as shown in the figure. (No. 1 cylinder TDC on
its compression stroke)
NOTE:
Though camshaft does not stop at the portion as shown in the
figure, for the placement of cam nose, it is generally accepted
camshaft is placed for the same direction of the figure.
A : Right bank
B : Left bank
PBIC5045E
: Engine front
Bank INT/EXHDowel
pin (1)Paint marks
Identification
mark (D)
M1 (E) M2 (F) M3 (C)
RHINT (A) Yes Green No Light blue 1E
EXH (B) Yes No Green Light blue 1F
LHINT (A) Yes Green No Light blue 1G
EXH (B) Yes No Green Light blue 1H
PBIC5009E
1 : Crankshaft key
PBIC5010E
Page 79 of 148
CAMSHAFT
EM-79
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 November2007 350Z
5. Tighten camshaft bracket bolts in the following steps, in numeri-
cal order as shown in the figure.
a. Tighten No. 7 to 10 in numerical order as shown.
b. Tighten No. 1 to 6 in numerical order as shown.
c. Tighten No. 1 to 10 in numerical order as shown.
d. Tighten No. 1 to 10 in numerical order as shown.
CAUTION:
After tightening mounting bolts of camshaft brackets (No.
1), be sure to wipe off excessive liquid gasket from the
parts list below.
Mating surface of rocker cover
Mating surface of rear timing chain case
6. Inspect and adjust the valve clearance. Refer to EM-80, "
Valve Clearance" .
7. Install camshaft sensor bracket.
Tighten camshaft sensor bracket bolts in numerical order as
shown in the figure.
8. Install in the reverse order of removal after this step.
INSPECTION AFTER INSTALLATION
Inspection of Camshaft Sprocket (INT) Oil Groove
CAUTION:
Perform this inspection only when DTC P0011 or P0021 are detected in self-diagnostic results of
CONSULT-III and it is directed according to inspection procedure of EC section. Refer to EC-81,
"TROUBLE DIAGNOSIS" .
Check when engine is cold so as to prevent burns from any splashing engine oil.
1. Check the engine oil level. Refer to LU-6, "
ENGINE OIL" .
2. Perform the following procedure so as to prevent the engine from being unintentionally started while
checking.
a. Release fuel pressure. Refer to EC-79, "
FUEL PRESSURE RELEASE" .
b. Disconnect ignition coil and injector harness connectors.
3. Remove intake valve timing control solenoid valve. Refer to EM-72, "
CAMSHAFT" . : 1.96 N·m (0.2 kg-m, 17 in-lb)
: 1.96 N·m (0.2 kg-m, 17 in-lb)
: 5.88 N·m (0.6 kg-m, 52 in-lb)
: 10.4 N·m (1.1 kg-m, 92 in-lb)
PBIC2050E
: Engine front
PBIC5054E
Page 80 of 148
EM-80
CAMSHAFT
Revision: 2006 November2007 350Z
4. Crank the engine, and then make sure that engine oil comes out
from valve timing control solenoid valve hole. End crank after
checking.
WARNING:
Be careful not to touch rotating parts (drive belts, idler pul-
ley, and crankshaft pulley, etc.).
CAUTION:
Engine oil may squirt from intake valve timing control sole-
noid valve installation hole during cranking. Use a shop
cloth to prevent the engine components and the vehicle. Do not allow engine oil to get on rubber
components such as drive belt or engine mount insulators. Immediately wipe off any splashed
engine oil.
Clean oil groove between oil strainer and intake valve timing control solenoid valve if engine oil does not
come out from valve timing control solenoid valve hole. Refer to LU-4, "
LUBRICATION SYSTEM" .
5. Remove components between intake valve timing control solenoid valve and camshaft sprocket (INT),
and then check each oil groove for clogging.
Clean oil groove if necessary. Refer to LU-4, "LUBRICATION SYSTEM" .
6. After inspection, install removed parts.
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-11, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal/installation, slack in the guide may
generate a pounding noise during and just after engine start. However, this is normal. Noise will stop after
hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc.
Valve ClearanceNBS0000U
INSPECTION
Perform inspection as follows after removal, installation or replacement of camshaft or valve-related parts, or if
there is unusual engine conditions regarding valve clearance.
1 : Valve timing control solenoid valve
: Engine front
PBIC5141E
Items Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
Page 81 of 148
CAMSHAFT
EM-81
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 November2007 350Z
In cases of removing/installing or replacing camshaft and valve-
related parts, or of unusual engine conditions due to changes in
valve clearance (found malfunctions during stating, idling or causing
noise), perform inspection as follows:
1. Remove rocker covers (right and left bank). Refer to EM-40, "
ROCKER COVER" .
2. Measure the valve clearance as follows:
a. Set No. 1 cylinder at TDC of its compression stroke.
Rotate crankshaft pulley clockwise to align timing mark
(grooved line without color) with timing indicator.
Make sure that intake and exhaust cam nose on No. 1 cylin-
der (engine front side of right bank) are located as shown in
the figure.
If not, turn crankshaft one revolution (360 degrees) and align
as shown in the figure.
b. Use a feeler gauge, measure the clearance between valve lifter
and camshaft.
Valve clearance:
Unit: mm (in)
*: Approximately 80°C (176°F)
SEM713A
: Timing mark (grooved line without color)
PBIC4966E
SEM418G
SEM139D
Items Cold Hot * (reference data)
Intake 0.26 - 0.34 (0.010 - 0.013) 0.304 - 0.416 (0.012 - 0.016)
Exhaust 0.29 - 0.37 (0.011 - 0.015) 0.308 - 0.432 (0.012 - 0.017)
Page 82 of 148
EM-82
CAMSHAFT
Revision: 2006 November2007 350Z
By referring to the figure, measure the valve clearances at
locations marked “×” as shown in the table below (locations
indicated in the figure).
No. 1 cylinder at compression TDC
c. Rotate crankshaft by 240 degrees clockwise (when viewed from engine front) to align No. 3 cylinder at
TDC of its compression stroke.
NOTE:
To align cylinder No. 3 with the compression top dead center,
place matching marks (A) on the crankshaft pulley (1) side
and on the cylinder block side at a point 240° (b) counter-
clockwise from the compression top dead center using the
hex head of the crankshaft pulley bolt as a guide.
Measuring position (right bank) No. 1 CYL. No. 3 CYL. No. 5 CYL.
No. 1 cylinder at
compression TDCEXH×
INT×
Measuring position (left bank) No. 2 CYL. No. 4 CYL. No. 6 CYL.
No. 1 cylinder at
compression TDCINT×
EXH×
PBIC2054E
PBIC4984E
Page 83 of 148
CAMSHAFT
EM-83
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 November2007 350Z
By referring to the figure, measure the valve clearances at
locations marked “×” as shown in the table below (locations
indicated in the figure).
No. 3 cylinder at compression TDC
d. Rotate crankshaft by 240 degrees clockwise (when viewed from engine front) to align No. 5 cylinder at
TDC of its compression stroke.
NOTE:
To align cylinder No. 5 with the compression top dead center,
place matching marks (A) on the crankshaft pulley (1) side
and on the cylinder block side at a point 240° (b) counter-
clockwise from the compression top dead center using the
hex head of the crankshaft pulley bolt as a guide.
Measuring position (right bank) No. 1 CYL. No. 3 CYL. No. 5 CYL.
No. 3 cylinder at
compression TDCEXH×
INT×
Measuring position (left bank) No. 2 CYL. No. 4 CYL. No. 6 CYL.
No. 3 cylinder at
compression TDCINT×
EXH ×
PBIC2055E
PBIC4984E
Page 85 of 148
CAMSHAFT
EM-85
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 November2007 350Z
Thickness of new valve lifter can be identified by stamp marks
on the reverse side (inside the cylinder).
Stamp mark 788T indicates 7.88 mm (0.3102 in) in thickness.
Available thickness of valve lifter: 27 sizes with range 7.88 to 8.40 mm (0.3102 to 0.3307 in) in steps of
0.02 mm (0.0008 in) (when manufactured at factory). Refer to EM-138, "
Available Valve Lifter" .
6. Install selected valve lifter.
7. Install camshaft. Refer to EM-77, "
INSTALLATION" .
8. Manually turn crankshaft pulley a few turns.
9. Make sure that the valve clearances for cold engine are within the specifications by referring to the speci-
fied values. Refer to EM-80, "
INSPECTION" .
10. Install all removal parts in the reverse order of removal. Refer to EM-77, "
INSTALLATION" .
11. Warm up the engine, and check for unusual noise and vibration.
KBIA0119E
Page 86 of 148
EM-86
OIL SEAL
Revision: 2006 November2007 350Z
OIL SEALPFP:00100
Removal and Installation of Valve Oil SealNBS0000V
REMOVAL
1. Remove camshaft relating to valve oil seal to be removed. Refer to EM-72, "CAMSHAFT" .
2. Remove valve lifters. Refer to EM-72, "
CAMSHAFT" .
3. Turn crankshaft until the cylinder requiring new oil seals is at TDC. This will prevent valve from dropping
into cylinder.
4. Remove valve collet.
Compress valve spring with valve spring compressor, attach-
ment, adapter (SST). Remove valve collet with magnet hand.
CAUTION:
When working, take care not to damage valve lifter holes.
5. Remove valve spring retainer, valve spring and valve spring seat.
6. Remove valve oil seal using valve oil seal puller (SST).
INSTALLATION
1. Apply engine oil on new valve oil seal joint and seal lip.
2. Using valve oil seal drift (SST), press fit valve oil seal to height
“H” shown in the figure.
NOTE:
Dimension “H”: Height measured before valve spring seat instal-
lation
3. Install in the reverse order of removal after this step.
PBIC1803E
PBIC0884E
Intake and exhaust : 14.3 - 14.9 mm (0.563 - 0.587 in)
PBIC0802E
Page 87 of 148
OIL SEAL
EM-87
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 November2007 350Z
Removal and Installation of Front Oil SealNBS0000W
REMOVAL
1. Remove the following parts:
Undercover
Drive belts: Refer to EM-12, "DRIVE BELTS" .
Radiator cooling fan assembly: Refer to CO-21, "COOLING FAN" .
Crankshaft pulley: Refer to EM-53, "TIMING CHAIN" .
2. Remove front oil seal using suitable tool.
CAUTION:
Be careful not to damage front timing chain case and crank-
shaft.
INSTALLATION
1. Apply engine oil to both oil seal lip and dust seal lip of new front oil seal.
2. Install front oil seal.
Install front oil seal so that each seal lip is oriented as shown
in the figure.
Using suitable drift, press-fit until the height of front oil seal is
level with the mounting surface.
–Suitable drift: outer diameter 60 mm (2.36 in), inner diameter
50 mm (1.97 in).
CAUTION:
Be careful not to damage front timing chain case and
crankshaft.
Press-fit straight and avoid causing burrs or tilting oil
seal.
3. Install in the reverse order of removal after this step.
Removal and Installation of Rear Oil SealNBS0000X
REMOVAL
1. Remove transmission assembly. Refer to MT-18, "TRANSMISSION ASSEMBLY" (M/T models) or AT-
242, "TRANSMISSION ASSEMBLY" (A/T models).
2. Remove clutch cover and clutch disk (M/T models). Refer to CL-16, "
CLUTCH DISC, CLUTCH COVER" .
3. Remove flywheel (M/T models) or drive plate (A/T models). Refer to EM-107, "
CYLINDER BLOCK" .
PBIC2931E
SEM715A
PBIC2931E
Page 88 of 148
EM-88
OIL SEAL
Revision: 2006 November2007 350Z
4. Remove rear oil seal with a suitable tool.
CAUTION:
Be careful not to damage crankshaft and cylinder block.
INSTALLATION
1. Apply new engine oil to new rear oil seal joint surface and seal lip.
2. Install rear oil seal so that each seal lip is oriented as shown.
Press in rear oil seal to the position as shown.
Using suitable drift, press-fit until the height of front oil seal is
level with the mounting surface.
–Suitable drift: outer diameter 100 mm (3.94 in), inner diameter
85 mm (3.35 in).
CAUTION:
Be careful not to damage crankshaft and cylinder block.
Press-fit oil seal straight to avoid causing burrs or tilting.
3. Install in the reverse order of removal after this step.
PBIC2932E
SEM715A
SBIA0281E
LBIA0454E