dimensions NISSAN TEANA 2003 User Guide
Page 2110 of 3502
EM-2 CAMSHAFT ............................................................... 41
Removal and Installation ........................................ 41
REMOVAL ........................................................... 41
INSPECTION AFTER REMOVAL ........................ 44
INSTALLATION .................................................... 47
INSPECTION AFTER INSTALLATION ................ 49
Valve Clearance ...................................................... 50
INSPECTION ....................................................... 50
ADJUSTMENT .................................................... 51
TIMING CHAIN .......................................................... 53
Removal and Installation ........................................ 53
REMOVAL ........................................................... 54
INSPECTION AFTER REMOVAL ........................ 57
INSTALLATION .................................................... 58
OIL SEAL .................................................................. 62
Removal and Installation of Valve Oil Seal ............. 62
REMOVAL ........................................................... 62
INSTALLATION .................................................... 62
Removal and Installation of Front Oil Seal ............. 63
REMOVAL ........................................................... 63
INSTALLATION .................................................... 63
Removal and Installation of Rear Oil Seal .............. 64
REMOVAL ........................................................... 64
INSTALLATION .................................................... 64
CYLINDER HEAD ..................................................... 65
On-Vehicle Service ................................................. 65
CHECKING COMPRESSION PRESSURE ......... 65
Removal and Installation ........................................ 66
REMOVAL ........................................................... 66
INSPECTION AFTER REMOVAL ........................ 67
INSTALLATION .................................................... 68
INSPECTION AFTER INSTALLATION ................ 68
Disassembly and Assembly .................................... 70
DISASSEMBLY ................................................... 70
ASSEMBLY ......................................................... 71
Inspection After Disassembly ................................. 72
VALVE DIMENSIONS .......................................... 72
VALVE GUIDE CLEARANCE .............................. 73
VALVE GUIDE REPLACEMENT ......................... 73
VALVE SEAT CONTACT ..................................... 75
VALVE SEAT REPLACEMENT ........................... 75
VALVE SPRING SQUARENESS ......................... 76
VALVE SPRING DIMENSIONS AND VALVE
SPRING PRESSURE LOAD ............................... 76
ENGINE ASSEMBLY ................................................ 77
Removal and Installation ........................................ 77
REMOVAL ........................................................... 78
INSTALLATION .................................................... 79
INSPECTION AFTER INSTALLATION ................ 80
CYLINDER BLOCK ................................................... 81
Disassembly and Assembly .................................... 81
DISASSEMBLY ................................................... 82
ASSEMBLY ......................................................... 86
How to Select Piston and Bearing .......................... 91
DESCRIPTION .................................................... 91
HOW TO SELECT PISTON ................................. 92
HOW TO SELECT CONNECTING ROD BEAR-ING ....................................................................... 92
HOW TO SELECT MAIN BEARING .................... 95
Inspection After Disassembly .................................. 99
CRANKSHAFT END PLAY .................................. 99
CONNECTING ROD SIDE CLEARANCE ........... 99
PISTON TO PISTON PIN OIL CLEARANCE ....... 99
PISTON RING SIDE CLEARANCE ...................100
PISTON RING END GAP ..................................100
CONNECTING ROD BEND AND TORSION .....101
CONNECTING ROD BIG END DIAMETER ......101
CONNECTING ROD BUSHING OIL CLEAR-
ANCE .................................................................101
CYLINDER BLOCK DISTORTION ....................102
MAIN BEARING HOUSING INNER DIAMETER .103
PISTON TO CYLINDER BORE CLEARANCE ..103
CRANKSHAFT MAIN JOURNAL DIAMETER ...104
CRANKSHAFT PIN JOURNAL DIAMETER ......105
OUT-OF-ROUND AND TAPER OF CRANK-
SHAFT ...............................................................105
CRANKSHAFT RUNOUT ..................................105
CONNECTING ROD BEARING OIL CLEAR-
ANCE .................................................................105
MAIN BEARING OIL CLEARANCE ...................106
MAIN BEARING CRUSH HEIGHT ....................107
CONNECTING ROD BEARING CRUSH
HEIGHT .............................................................107
LOWER CYLINDER BLOCK MOUNTING BOLT
OUTER DIAMETER ...........................................107
CONNECTING ROD BOLT OUTER DIAMETER .107
SERVICE DATA AND SPECIFICATIONS (SDS) ....108
Standard and Limit ................................................108
GENERAL SPECIFICATIONS ...........................108
DRIVE BELT ......................................................108
EXHAUST MANIFOLD ......................................108
SPARK PLUG ....................................................108
CYLINDER HEAD ..............................................108
VALVE ................................................................109
CAMSHAFT AND CAMSHAFT BEARING .........113
CYLINDER BLOCK ............................................113
PISTON, PISTON RING AND PISTON PIN ......114
CONNECTING ROD ..........................................115
CRANKSHAFT ...................................................115
MAIN BEARING .................................................117
CONNECTING ROD BEARING .........................118
VQ
PRECAUTIONS .......................................................119
Precautions Necessary for Steering Wheel Rotation
After Battery Disconnect .......................................119
OPERATION PROCEDURE ..............................119
Precautions for Drain Engine Coolant ...................119
Precautions for Disconnecting Fuel Piping ...........119
Precautions for Removal and Disassembly ..........119
Precautions for Inspection, Repair and Replace-
ment ......................................................................119
Precautions for Assembly and Installation ............119
Page 2111 of 3502
EM-3
C
D
E
F
G
H
I
J
K
L
M
EMA
Parts Requiring Angle Tightening ......................... 120
Precautions for Liquid Gasket .............................. 120
REMOVAL OF LIQUID GASKET SEALING ...... 120
LIQUID GASKET APPLICATION PROCEDURE . 120
PREPARATION ....................................................... 122
Special Service Tools ........................................... 122
Commercial Service Tools .................................... 124
NOISE, VIBRATION AND HARSHNESS (NVH)
TROUBLESHOOTING ............................................ 126
NVH Troubleshooting — Engine Noise ................ 126
Use the Chart Below to Help You Find the Cause
of the Symptom. ................................................... 127
DRIVE BELTS ......................................................... 128
Checking Drive Belts ............................................ 128
Tension Adjustment .............................................. 128
ALTERNATOR AND A/C COMPRESSOR BELT . 129
POWER STEERING OIL PUMP BELT ............. 129
Removal and Installation ...................................... 129
REMOVAL ......................................................... 129
INSTALLATION ................................................. 129
AIR CLEANER AND AIR DUCT ............................. 131
Removal and Installation ...................................... 131
REMOVAL ......................................................... 131
INSPECTION AFTER REMOVAL ..................... 132
INSTALLATION ................................................. 132
Changing Air Cleaner Filter .................................. 132
REMOVAL ......................................................... 132
INSTALLATION ................................................. 132
INTAKE MANIFOLD COLLECTOR ........................ 133
Removal and Installation ...................................... 133
REMOVAL ......................................................... 134
INSPECTION AFTER REMOVAL ..................... 136
INSTALLATION ................................................. 136
INTAKE MANIFOLD ............................................... 138
Removal and Installation ...................................... 138
REMOVAL ......................................................... 138
INSPECTION AFTER REMOVAL ..................... 139
INSTALLATION ................................................. 139
EXHAUST MANIFOLD AND THREE WAY CATA-
LYST ....................................................................... 140
Removal and Installation ...................................... 140
REMOVAL ......................................................... 140
INSPECTION AFTER REMOVAL ..................... 142
INSTALLATION ................................................. 142
OIL PAN AND OIL STRAINER ............................... 145
Removal and Installation ...................................... 145
REMOVAL ......................................................... 145
INSPECTION AFTER REMOVAL ..................... 148
INSTALLATION ................................................. 148
INSPECTION AFTER INSTALLATION ............. 150
IGNITION COIL ....................................................... 152
Removal and Installation ...................................... 152
REMOVAL ......................................................... 152
INSTALLATION ................................................. 152
SPARK PLUG (PLATINUM-TIPPED TYPE) ........... 153
Removal and Installation ...................................... 153
REMOVAL ......................................................... 153
INSPECTION AFTER REMOVAL ..................... 153
INSTALLATION ................................................. 154FUEL INJECTOR AND FUEL TUBE ......................155
Removal and Installation ......................................155
REMOVAL .........................................................155
INSTALLATION .................................................157
INSPECTION AFTER INSTALLATION ..............159
ROCKER COVER ...................................................160
Removal and Installation ......................................160
REMOVAL .........................................................160
INSTALLATION .................................................161
FRONT TIMING CHAIN CASE ...............................163
Removal and Installation ......................................163
REMOVAL .........................................................163
INSTALLATION .................................................166
INSPECTION AFTER INSTALLATION ..............171
TIMING CHAIN ........................................................173
Removal and Installation ......................................173
REMOVAL .........................................................174
INSPECTION AFTER REMOVAL .....................180
INSTALLATION .................................................181
INSPECTION AFTER INSTALLATION ..............191
CAMSHAFT ............................................................192
Removal and Installation ......................................192
REMOVAL .........................................................192
INSPECTION AFTER REMOVAL .....................194
INSTALLATION .................................................197
INSPECTION AFTER INSTALLATION ..............201
Valve Clearance ...................................................202
INSPECTION ....................................................202
ADJUSTMENT ..................................................205
OIL SEAL ................................................................207
Removal and Installation of Valve Oil Seal ...........207
REMOVAL .........................................................207
INSTALLATION .................................................207
Removal and Installation of Front Oil Seal ...........208
REMOVAL .........................................................208
INSTALLATION .................................................208
Removal and Installation of Rear Oil Seal ............208
REMOVAL .........................................................208
INSTALLATION .................................................209
CYLINDER HEAD ...................................................210
On-Vehicle Service ...............................................210
CHECKING COMPRESSION PRESSURE .......210
Removal and Installation ......................................211
REMOVAL .........................................................211
INSPECTION AFTER REMOVAL .....................212
INSTALLATION .................................................213
INSPECTION AFTER INSTALLATION ..............215
Disassembly and Assembly ..................................215
DISASSEMBLY .................................................216
ASSEMBLY .......................................................216
Inspection After Disassembly ...............................218
VALVE DIMENSIONS ........................................218
VALVE GUIDE CLEARANCE ............................218
VALVE GUIDE REPLACEMENT .......................219
VALVE SEAT CONTACT ...................................220
VALVE SEAT REPLACEMENT .........................220
VALVE SPRING SQUARENESS .......................221
VALVE SPRING DIMENSIONS AND VALVE
SPRING PRESSURE LOAD .............................221
Page 2115 of 3502
PRECAUTIONS
EM-7
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
3. Attach liquid gasket tube to the tube presser (SST).
Use Genuine Liquid Gasket or equivalent.
4. Apply the liquid gasket without breaks to the specified location
with the specified dimensions.
If there is a groove for the liquid gasket application, apply the
liquid gasket to the groove.
As for the bolt holes, normally apply the liquid gasket inside
the holes. Occasionally, it should be applied outside the
holes. Make sure to read the text of service manual.
Within 5 minutes of liquid gasket application, install the mating
component.
If the liquid gasket protrudes, wipe it off immediately.
Do not retighten mounting bolts or nut after the installation.
Wait 30 minutes or more after installation before refilling
engine oil and engine coolant.
CAUTION:
If there are specific instructions in this manual, observe
them.
PBIC2160E
SEM159F
Page 2118 of 3502
EM-10
[QR]
PREPARATION
Commercial Service ToolsBBS0058P
KV11103000
Pulley pullerRemoving crankshaft pulley
Quick connector release Removing fuel tube quick connectors in
engine room
(Available in SEC. 164 of PARTS CATALOG:
Part No. 16441 6N210) Tool number
Tool nameDescription
NT676
PBIC0198E
Tool nameDescription
Spark plug wrench Removing and installing spark plug
Valve seat cutter set Finishing valve seat dimensions
Piston ring expander Removing and installing piston ring
Valve guide drift Removing and installing valve guide
Intake and Exhaust:
a: 9.5 mm (0.374 in) dia.
b: 5.5 mm (0.217 in) dia.
Valve guide reamer (1): Reaming valve guide inner hole
(2): Reaming hole for oversize valve guide
Intake and Exhaust:
d
1 : 6.0 mm (0.236 in) dia.
d
2 : 10.2 mm (0.402 in) dia.
S-NT047
S-NT048
S-NT030
S-NT015
NT016
Page 2165 of 3502
TIMING CHAIN
EM-57
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
19. Remove balancer unit timing chain and crankshaft sprocket.
20. Loosen mounting bolts in reverse order as shown in the figure,
and remove balancer unit.
CAUTION:
Do not disassemble balancer unit.
NOTE:
Use TORX socket (size E14).
INSPECTION AFTER REMOVAL
Timing Chain
Check for cracks and any excessive wear at link plates and roller
links of timing chain. Replace timing chain as necessary.
Balancer Unit Mounting Bolt Outer Diameter
Measure the outer diameters (“d1”, “d2”) at two positions as
shown in the figure.
If reduction appears in “A” range, regard it as “d2”.
If it exceeds the limit (large difference in dimensions), replace
balancer unit mounting bolt with a new one.
KBIA0122E
PBIC0282E
Limit (“d1” – “d2”) : 0.15 mm (0.0059 in)
PBIC1137E
Page 2180 of 3502
EM-72
[QR]
CYLINDER HEAD
Compress valve spring with valve spring compressor, attach-
ment and adapter (SST). Install valve collet with magnet
hand.
CAUTION:
When working, be careful not to damage valve lifter
holes.
Tap valve stem edge lightly with plastic hammer after installa-
tion to check its installed condition.
8. Install valve lifter.
Install it in the original position.
9. Install spark plug tube if removed.
Press-fit it into cylinder head with the following procedure:
a. Remove old liquid gasket from cylinder head side installation
hole.
b. Apply sealant all round on spark plug tube within approximately
12 mm (0.47 in) width from edge of spark plug tube on the
press-fit side.
Use Thread Locking Sealant or equivalent.
c. Using drift, press-fit spark plug tube so that height is as same as
“H” shown in the figure.
CAUTION:
When press-fitting, be careful not to deform spark plug tube.
After press-fitting, wipe off any protruding thread locking sealant on top surface of cylinder
head.
10. Install spark plug with spark plug wrench (commercial service tool).
Inspection After DisassemblyBBS0059E
VALVE DIMENSIONS
Check dimensions of each valve. For dimensions, refer to EM-
109, "Valve Dimensions" .
If dimensions are out of the standard, replace valve.
PBIC1791E
Standard press-fit height “H”
: 41.2 - 42.2 mm (1.622 - 1.661 in)
PBIC2636E
SEM188A
Page 2182 of 3502
EM-74
[QR]
CYLINDER HEAD
2. Drive out valve guide with a press [under a 20 kN (2 ton, 2.2 US
ton, 2.0 lmp ton) force] or hammer and valve guide drift (com-
mercial service tool).
CAUTION:
Cylinder head contains heat, when working, wear protective
equipment to avoid getting burned.
3. Ream cylinder head valve guide hole with valve guide reamer
(commercial service tool).
4. Heat cylinder head to 110 to 130°C (230 to 266°F) by soaking in
heated oil.
5. Using valve guide drift (commercial service tool), press valve
guide from camshaft side to dimensions as shown in the figure.
CAUTION:
Cylinder head contains heat, when working, wear protective
equipment to avoid getting burned.
SEM931C
Valve guide hole diameter (for service parts):
Intake and exhaust
: 10.175 - 10.196 mm (0.4006 - 0.4014 in)
SEM932C
SEM008A
Projection “H”:
Intake : 10.1 - 10.3 mm (0.398 - 0.406 in)
Exhaust : 10.0 - 10.4 mm (0.394 - 0.409 in)
PBIC2187E
Page 2183 of 3502
CYLINDER HEAD
EM-75
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
6. Apply reamer finish to valve guide with valve guide reamer
(commercial service tool).
VALVE SEAT CONTACT
After confirming that the dimensions of valve guides and valves
are within specifications, perform this procedure.
Apply prussian blue (or white lead) onto contacting surface of
valve seat to check the condition of the valve contact on the sur-
face.
Check if the contact area band is continuous all around the cir-
cumference.
If not, grind to adjust valve fitting and check again. If the contact-
ing surface still has NG conditions even after the re-check,
replace valve seat. Refer to EM-75, "
VALVE SEAT REPLACE-
MENT" .
VALVE SEAT REPLACEMENT
When valve seat is removed, replace with oversized [0.5 mm (0.020 in)] valve seat.
1. Bore out old seat until it collapses. Boring should not continue beyond the bottom face of the seat recess
in cylinder head. Set the machine depth stop to ensure this. Refer to EM-112, "
Va l v e S e a t" .
CAUTION:
Prevent to scratch cylinder head by excessive boring.
2. Ream cylinder head recess diameter for service valve seat.
Be sure to ream in circles concentric to the valve guide center.
This will enable valve seat to fit correctly.
3. Heat cylinder head to 110 to 130°C (230 to 266°F) by soaking in
heated oil.
4. Provide valve seat cooled well with dry ice. Press-fit valve seat into cylinder head.
CAUTION:
Avoid directly to touching cold valve seats.Standard
Intake and exhaust
: 6.000 - 6.018 mm (0.2362 - 0.2369 in)
SEM932C
SBIA0322E
Oversize [0.5 mm (0.020 in)]
Intake : 37.000 - 37.016 mm (1.4567 - 1.4573 in)
Exhaust : 32.000 - 32.016 mm (1.2598 - 1.2605 in)
SEM795A
SEM008A
Page 2184 of 3502
EM-76
[QR]
CYLINDER HEAD
Cylinder head contains heat, when working, wear protective equipment to avoid getting burned.
5. Using valve seat cutter set (commercial service tool) or valve
seat grinder, finish valve seat to the specified dimensions. For
dimensions, refer to EM-112, "
Va l v e S e a t" .
CAUTION:
When using valve seat cutter, firmly grip the cutter handle
with both hands. Then, press on the contacting surface all
around the circumference to cut in a single drive. Improper
pressure on with the cutter or cutting many different times
may result in stage valve seat.
6. Using compound, grind to adjust valve fitting.
7. Check again for normal contact. Refer to EM-75, "
VALVE SEAT CONTACT" .
VALVE SPRING SQUARENESS
Set try square along the side of valve spring and rotate spring.
Measure the maximum clearance between the top face of spring
and try square.
CAUTION:
Do not remove valve spring seat from valve spring.
If it exceeds the limit, replace valve spring (with valve spring
seat).
VALVE SPRING DIMENSIONS AND VALVE SPRING PRESSURE LOAD
Check valve spring each load at specified spring height.
CAUTION:
Do not remove valve spring seat from valve spring.
Standard:
If the installation load or load with valve open is out of the standard, replace valve spring (with valve spring
seat).
SEM934C
Limit : 1.9 mm (0.075 in)
PBIC0080E
SEM113
Items Intake Exhaust
Free height 44.84 - 45.34 mm (1.7654 - 1.7850 in) 45.28 - 45.78 mm (1.7827 - 1.8024 in)
Installation height 35.30 mm (1.390 in) 35.30 mm (1.390 in)
Installation load 151 - 175 N (15.4 - 17.8 kg, 34 - 39 lb) 151 - 175 N (15.4 - 17.8 kg, 34 - 39 lb)
Height during valve open 24.94 mm (0.9819 in) 26.39 mm (1.0390 in)
Load with valve open 358 - 408 N (36.5 - 41.6 kg, 80 - 92 lb) 325 - 371 N (33.1 - 37.8 kg, 73 - 83 lb)
Identification color Blue Yellow
Page 2201 of 3502
CYLINDER BLOCK
EM-93
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
2. Apply crankshaft pin journal diameter grade stamped on crank-
shaft front side to the column in the “Connecting Rod Bearing
Selection Table”.
3. Read the symbol at the cross point of selected row and column in the “Connecting Rod Bearing Selection
Table”.
4. Apply the symbol obtained to the “Connecting Rod Bearing Grade Table” to select connecting rod bearing.
When Crankshaft and Connecting Rod are Reused
1. Measure the dimensions of the connecting rod big end diameter and crankshaft pin journal diameter indi-
vidually. Refer to EM-101, "
CONNECTING ROD BIG END DIAMETER" and EM-105, "CRANKSHAFT
PIN JOURNAL DIAMETER" .
2. Apply the measured dimension to the “Connecting Rod Bearing Selection Table”.
3. Read the symbol at the cross point of selected row and column in the “Connecting Rod Bearing Selection
Table”.
4. Apply the symbol obtained to the “Connecting Rod Bearing Grade Table” to select connecting rod bearing.
PBIC2198E