ignition NISSAN TEANA 2003 Service Manual
Page 1561 of 3502
DTC P2138 APP SENSOR
EC-279
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EC
15. REPLACE ACCELERATOR PEDAL ASSEMBLY
1. Replace accelerator pedal assembly.
2. Perform EC-47, "
Accelerator Pedal Released Position Learning" .
3. Perform EC-47, "
Throttle Valve Closed Position Learning" .
4. Perform EC-47, "
Idle Air Volume Learning" .
>>INSPECTION END
16. CHECK INTERMITTENT INCIDENT
Refer to EC-105, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>>INSPECTION END
Component InspectionBBS005I5
ACCELERATOR PEDAL POSITION SENSOR
1. Reconnect all harness connectors disconnected.
2. Turn ignition switch ON.
3. Check voltage between ECM terminals 106 (APP sensor 1 sig-
nal), 98 (APP sensor 2 signal) and ground under the following
conditions.
4. If NG, replace accelerator pedal assembly and go to the next
step.
5. Perform EC-47, "
Accelerator Pedal Released Position Learning" .
6. Perform EC-47, "
Throttle Valve Closed Position Learning" .
7. Perform EC-47, "
Idle Air Volume Learning" .
Removal and InstallationBBS005I6
ACCELERATOR PEDAL
Refer to ACC-3, "ACCELERATOR CONTROL SYSTEM" .
Terminal Accelerator pedal Voltage
106
(Accelerator pedal position
sensor 1)Fully released 0.65 - 0.87V
Fully depressed More than 4.3V
98
(Accelerator pedal position
sensor 2)Fully released 0.28 - 0.48V
Fully depressed More than 2.0V
MBIB0023E
Page 1562 of 3502
EC-280
[QR]
ELECTRICAL LOAD SIGNAL
ELECTRICAL LOAD SIGNALPFP:25350
DescriptionBBS005I7
The electrical load signal (Headlamp switch signal, rear window defogger switch signal, etc.) is transferred
through the CAN communication line from BCM to ECM via IPDM E/R.
CONSULT-II Reference Value in Data Monitor ModeBBS005I8
Specification data are reference values.
Diagnostic ProcedureBBS005I9
1. CHECK LOAD SIGNAL CIRCUIT OVERALL FUNCTION-I
1. Turn ignition switch ON.
2. Connect CONSULT-II and select “DATA MONITOR” mode.
3. Select “LOAD SIGNAL” and check indication under the following
conditions.
OK or NG
OK >> GO TO 2.
NG >> GO TO 4.
2. CHECK LOAD SIGNAL CIRCUIT OVERALL FUNCTION-II
Check “LOAD SIGNAL” indication under the following conditions.
OK or NG
OK >> GO TO 3.
NG >> GO TO 5.
MONITOR ITEM CONDITION SPECIFICATION
LOAD SIGNAL
Ignition switch: ONRear window defogger switch: ON
and/or
Lighting switch: 2ndON
Rear window defogger switch and
lighting switch: OFFOFF
HEATER FAN SW
Ignition switch: ONHeater fan switch: ON ON
Heater fan switch: OFF OFF
Condition Indication
Rear window defogger switch: ON ON
Rear window defogger switch: OFF OFF
PBIB0103E
Condition Indication
Lighting switch: ON at 2nd position ON
Lighting switch: OFF OFF
PBIB0103E
Page 1566 of 3502
EC-284
[QR]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.) TERMI-
NAL
NO.WIRE
COLORITEM CONDITION DATA (DC Voltage)
19 PEVAP canister purge vol-
ume control solenoid valve[Engine is running]
Idle speedBATTERY VOLTAGE
(11 - 14V)
[Engine is running]
Engine speed: About 2,000 rpm (More
than 100 seconds after starting engine)Approximately 10V
111 W / BECM relay
(Self shut-off)[Engine is running]
[Ignition switch: OFF]
For a few seconds after turning ignition
switch OFF0 - 1.0V
[Ignition switch: OFF]
More than a few seconds after turning igni-
tion switch OFFBATTERY VOLTAGE
(11 - 14V)
11 9
120R/G
R/GPower supply for ECM[Ignition switch: ON]BATTERY VOLTAGE
(11 - 14V)
PBIB0050E
PBIB0520E
Page 1567 of 3502
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-285
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EC
Diagnostic ProcedureBBS005ID
1. CHECK OVERALL FUNCTION
With CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose connected to the EVAP canister.
3. Turn ignition switch ON, and select “PURG VOL CONT/V” in
“ACTIVE TEST” mode with CONSULT-II.
4. Start engine and let it idle.
5. Change the valve opening percentage with touching “Qu” or
“Qd” on CONSULT-II screen, and check for vacuum existence at
the EVAP purge hose under the following conditions.
Without CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose connected to the EVAP canis-
ter.
3. Start engine and let it idle for at least 80 seconds.
4. Check for vacuum existence at the EVAP purge hose under the
following conditions.
OK or NG
OK >> GO TO 2.
NG >> GO TO 3.
2. CHECK EVAP CANISTER
Refer to EC-288, "
Component Inspection" .
OK or NG
OK >>INSPECTION END
NG >> Replace EVAP canister.
PBIB0569E
Conditions
(PURG VOL CONT/V)Va c u u m
0% Should not exist.
100% Should exist.
PBIB2124E
Conditions Vacuum
At idle Should not exist.
Engine speed is about 2,000 rpm. Should exist.
PBIB2124E
Page 1568 of 3502
EC-286
[QR]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
3. CHECK EVAP PURGE LINE
Check EVAP purge line (pipe, rubber tube, fuel tank and EVAP canister) for cracks or improper connection.
Refer to EC-28, "
EVAPORATIVE EMISSION LINE DRAWING" .
OK or NG
OK >> GO TO 4.
NG >> Repair or reconnect the hose.
4. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE POWER SUPPLY CIR-
CUIT
1. Turn ignition switch OFF.
2. Disconnect EVAP canister purge volume control solenoid valve
harness connector.
3. Turn ignition switch ON.
4. Check voltage between EVAP canister purge volume control
solenoid valve terminal 1 and ground with CONSULT-II or tester.
OK or NG
OK >> GO TO 6.
NG >> GO TO 5.
5. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors F103, M52
Harness connectors E102, M57
Harness connectors E11, E253
Harness for open or short between EVAP canister purge volume control solenoid valve and IPDM E/R
Harness for open or short between EVAP canister purge volume control solenoid valve and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
PBIB2129E
Voltage: Battery voltage
PBIB0148E
Page 1569 of 3502
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-287
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EC
6. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OUTPUT SIGNAL CIR-
CUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between EVAP canister purge volume control solenoid valve terminal 2 and
ECM terminal 19. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK (With CONSULT-II)>>GO TO 7.
OK (Without CONSULT-II)>>GO TO 8.
NG >> Repair open circuit or short to ground or short to power in harness or connectors.
7. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OPERATION
With CONSULT-II
1. Reconnect all harness connectors disconnected.
2. Start engine.
3. Perform “PURG VOL CONT/V” in “ACTIVE TEST” mode with
CONSULT-II. Check that engine speed varies according to the
valve opening.
OK or NG
OK >> GO TO 9.
NG >> GO TO 8.
8. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Refer to EC-288, "
Component Inspection" .
OK or NG
OK >> GO TO 9.
NG >> Replace EVAP canister purge volume control solenoid valve.
9. CHECK INTERMITTENT INCIDENT
Refer to EC-105, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>>INSPECTION END Continuity should exist.
PBIB0569E
Page 1573 of 3502
FUEL INJECTOR
EC-291
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EC
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.)
Diagnostic ProcedureBBS005IJ
1. INSPECTION START
Turn ignition switch to START.
Is any cylinder ignited?
Ye s o r N o
Ye s > > G O T O 2 .
No >> GO TO 3.
TERMI-
NAL
NO.WIRE
COLORITEM CONDITION DATA (DC Voltage)
22
23
41
42R/Y
R/B
LG/R
R/WFuel injector No. 3
Fuel injector No. 1
Fuel injector No. 4
Fuel injector No. 2[Engine is running]
Warm-up condition
Idle speed
NOTE:
The pulse cycle changes depending on
rpm at idleBATTERY VOLTAGE
(11 - 14V)
[Engine is running]
Warm-up condition
Engine speed: 2,000 rpmBATTERY VOLTAGE
(11 - 14V)
PBIB0529E
PBIB0530E
Page 1574 of 3502
EC-292
[QR]
FUEL INJECTOR
2. CHECK OVERALL FUNCTION
With CONSULT-II
1. Start engine.
2. Perform “POWER BALANCE” in “ACTIVE TEST” mode with
CONSULT-II.
3. Make sure that each circuit produces a momentary engine
speed drop.
Without CONSULT-II
1. Start engine.
2. Listen to each fuel injector operating sound.
OK or NG
OK >>INSPECTION END
NG >> GO TO 3.
3. CHECK FUEL INJECTOR POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect fuel injector harness connector.
3. Turn ignition switch ON.
4. Check voltage between fuel injector terminal 1 and ground with
CONSULT-II or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
PBIB0133E
Clicking noise should be heard.
PBIB1986E
PBIB3290E
Voltage: Battery voltage
PBIB0582E
Page 1575 of 3502
FUEL INJECTOR
EC-293
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EC
4. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M52, F103
Harness connectors F1, F251
Fuse block (J/B) connector M1
10A fuse
Harness for open or short between fuel injector and fuse
>> Repair open circuit or short to ground or short to power in harness or connectors.
5. CHECK FUEL INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between fuel injector terminal 2 and ECM terminals 22, 23, 41, 42.
Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 7.
NG >> GO TO 6.
6. DETECT MALFONCTIONING PART
Check the following.
Harness connectors F1, F251
Harness for open or short between fuel injector and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
7. CHECK FUEL INJECTOR
Refer to EC-293, "
Component Inspection" .
OK or NG
OK >> GO TO 8.
NG >> Replace malfunctioning fuel injector.
8. CHECK INTERMITTENT INCIDENT
Refer to EC-105, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>>INSPECTION END
Component InspectionBBS005IK
FUEL INJECTOR
1. Disconnect fuel injector harness connector.Continuity should exist.
Page 1577 of 3502
FUEL PUMP
EC-295
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EC
FUEL PUMPPFP:17042
DescriptionBBS005IM
SYSTEM DESCRIPTION
*: ECM determines the start signal status by the signals of engine speed and battery voltage.
The ECM activates the fuel pump for several seconds after the ignition switch is turned ON to improve engine
startability. If the ECM receives a engine speed signal from the crankshaft position sensor (POS) and cam-
shaft position sensor (PHASE), it knows that the engine is rotating, and causes the pump to operate. If the
engine speed signal is not received when the ignition switch is ON, the engine stalls. The ECM stops pump
operation and prevents battery discharging, thereby improving safety. The ECM does not directly drive the fuel
pump. It controls the ON/OFF fuel pump relay, which in turn controls the fuel pump.
COMPONENT DESCRIPTION
A turbine type design fuel pump is used in the fuel tank.
CONSULT-II Reference Value in Data Monitor ModeBBS005IN
Specification data are reference values.
Sensor Input Signal to ECM ECM Function Actuator
Crankshaft position sensor (POS)
Camshaft position sensor (PHASE)Engine speed*
Fuel pump control Fuel pump relay
Battery Battery voltage*
Condition Fuel pump operation
Ignition switch is turned to ON. Operates for 1 second.
Engine running and crankingOperates.
When engine is stoppedStops in 1.5 seconds.
Except as shown aboveStops.
PBIB2259E
MONITOR ITEM CONDITION SPECIFICATION
FUEL PUMP RLY
For 1 second after turning ignition switch ON
Engine running or crankingON
Except above conditions OFF