NISSAN X-TRAIL 2005 Service Repair Manual

Page 1291 of 4555

EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-887
[QR (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC

Diagnostic ProcedureEBS01145
1. CHECK OVERALL FUNCTION
With CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose connected to the EVAP canister.
3. Turn ignition switch ON, and select “PURG VOL CONT/V” in
“ACTIVE TEST” mode with CONSULT-II.
4. Start engine and let it idle.
5. Change the valve opening percentage with touching “Qu” or
“Qd” on CONSULT-II screen, and check for vacuum existence at
the EVAP purge hose under the following conditions.
Without CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose connected to the EVAP canis-
ter.
3. Start engine and let it idle for at least 80 seconds.
4. Check for vacuum existence at the EVAP purge hose under the
following conditions.
OK or NG
OK >> GO TO 2.
NG >> GO TO 3.
2. CHECK EVAP CANISTER
Refer to EC-965, "
Component Inspection" .
OK or NG
OK >>INSPECTION END
NG >> Replace EVAP canister.
PBIB0569E
Conditions
(PURG VOL CONT/V)Va c u u m
0% Should not exist.
100% Should exist.
PBIB0676E
Conditions Vacuum
At idle Should not exist.
Engine speed is about 2,000 rpm. Should exist.
PBIB0676E

Page 1292 of 4555

EC-888
[QR (WITHOUT EURO-OBD)]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE

3. CHECK EVAP PURGE LINE
Check EVAP purge line (pipe, rubber tube, fuel tank and EVAP canister) for cracks or improper connection.
Refer to EC-963, "
EVAPORATIVE EMISSION LINE DRAWING" .
OK or NG
OK >> GO TO 4.
NG >> Repair or reconnect the hose.
4. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE POWER SUPPLY CIR-
CUIT
1. Turn ignition switch OFF.
2. Disconnect EVAP canister purge volume control solenoid valve
harness connector.
3. Turn ignition switch ON.
4. Check voltage between EVAP canister purge volume control
solenoid valve terminal 1 and ground with CONSULT-II or tester.
OK or NG
OK >> GO TO 6.
NG >> GO TO 5.
5. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors F41, M61
Harness for open or short between EVAP canister purge volume control solenoid valve and ECM relay
Harness for open or short between EVAP canister purge volume control solenoid valve and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
PBIB1993E
PBIB1968E
Voltage: Battery voltage
PBIB0148E

Page 1293 of 4555

EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-889
[QR (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC

6. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OUTPUT SIGNAL CIR-
CUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between EVAP canister purge volume control solenoid valve terminal 2 and
ECM terminal 19. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK (With CONSULT-II)>>GO TO 7.
OK (Without CONSULT-II)>>GO TO 8.
NG >> Repair open circuit or short to ground and short to power in harness or connectors.
7. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OPERATION
With CONSULT-II
1. Reconnect all harness connectors disconnected.
2. Start engine.
3. Perform “PURG VOL CONT/V” in “ACTIVE TEST” mode with
CONSULT-II. Check that engine speed varies according to the
valve opening.
OK or NG
OK >> GO TO 9.
NG >> GO TO 8.
8. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Refer to EC-890, "
Component Inspection" .
OK or NG
OK >> GO TO 9.
NG >> Replace EVAP canister purge volume control solenoid valve.
9. CHECK INTERMITTENT INCIDENT
Refer to EC-624, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>>INSPECTION END Continuity should exist.
PBIB0569E

Page 1294 of 4555

EC-890
[QR (WITHOUT EURO-OBD)]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE

Component InspectionEBS01146
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
With CONSULT-II
Check air passage continuity of EVAP canister purge volume control
solenoid valve under the following conditions.
Without CONSULT-II
Check air passage continuity of EVAP canister purge volume control
solenoid valve under the following conditions.
Removal and InstallationEBS01147
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Refer to EM-18, "INTAKE MANIFOLD" .
Condition
(PURG VOL CONT/V)Air passage continuity
between A and B
100% Yes
0% No
PBIB0149E
ConditionAir passage continuity
between A and B
12V direct current supply between termi-
nals 1 and 2Ye s
No supply No
PBIB0150E

Page 1295 of 4555

INJECTOR CIRCUIT
EC-891
[QR (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC

INJECTOR CIRCUITPFP:16600
Component DescriptionEBS0114I
The fuel injector is a small, precise solenoid valve. When the ECM
supplies a ground to the injector circuit, the coil in the injector is
energized. The energized coil pulls the ball valve back and allows
fuel to flow through the injector into the intake manifold. The amount
of fuel injected depends upon the injection pulse duration. Pulse
duration is the length of time the injector remains open. The ECM
controls the injection pulse duration based on engine fuel needs.
CONSULT-II Reference Value in Data Monitor ModeEBS0114J
Specification data are reference values.
SEF375Z
MONITOR ITEM CONDITION SPECIFICATION
B/FUEL SCHDL See EC-620, "
TROUBLE DIAGNOSIS - SPECIFICATION VALUE" .
INJ PULSE-B1
Engine: After warming up
Shift lever: P or N (A/T), Neutral
(M/T)
Air conditioner switch: OFF
No loadIdle 2.0 - 3.0 msec
2,000 rpm 1.9 - 2.9 msec

Page 1296 of 4555

EC-892
[QR (WITHOUT EURO-OBD)]
INJECTOR CIRCUIT

Wiring DiagramEBS0114K
TBWA0630E

Page 1297 of 4555

INJECTOR CIRCUIT
EC-893
[QR (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC

Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.)
Diagnostic ProcedureEBS0114L
1. INSPECTION START
Turn ignition switch to START.
Is any cylinder ignited?
Ye s o r N o
Ye s > > G O T O 2 .
No >> GO TO 3.
TERMI-
NAL
NO.WIRE
COLORITEM CONDITION DATA (DC Voltage)
22
23
41
42G/B
R/B
L/B
Y/BInjector No. 3
Injector No. 1
Injector No. 4
Injector No. 2[Engine is running]
Warm-up condition
Idle speed
NOTE:
The pulse cycle changes depending on rpm at
idleBATTERY VOLTAGE
(11 - 14V)
[Engine is running]
Warm-up condition
Engine speed is 2,000 rpmBATTERY VOLTAGE
(11 - 14V)
PBIB0529E
PBIB0530E

Page 1298 of 4555

EC-894
[QR (WITHOUT EURO-OBD)]
INJECTOR CIRCUIT

2. CHECK OVERALL FUNCTION
With CONSULT-II
1. Start engine.
2. Perform “POWER BALANCE” in “ACTIVE TEST” mode with
CONSULT-II.
3. Make sure that each circuit produces a momentary engine
speed drop.
Without CONSULT-II
1. Start engine.
2. Listen to each injector operating sound.
OK or NG
OK >>INSPECTION END
NG >> GO TO 3.
3. CHECK INJECTOR POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect injector harness connector.
3. Turn ignition switch ON.
4. Check voltage between injector terminal 1 and ground with
CONSULT-II or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
PBIB0133E
Clicking noise should be heard.
PBIB1986E
PBIB1970E
Voltage: Battery voltage
PBIB0582E

Page 1299 of 4555

INJECTOR CIRCUIT
EC-895
[QR (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC

4. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M61, F41
Harness connectors F1, F101
Fuse block (J/B) connector M1
10A fuse
Harness for open or short between injector and fuse
>> Repair open circuit or short to ground or short to power in harness or connectors.
5. CHECK INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between injector terminal 2 and ECM terminals 22, 23, 41, 42.
Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 7.
NG >> GO TO 6.
6. DETECT MALFONCTIONING PART
Check the following.
Harness connectors F101, F1
Harness for open or short between injector and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
7. CHECK INJECTOR
Refer to EC-896, "
Component Inspection" .
OK or NG
OK >> GO TO 8.
NG >> Replace injector.
8. CHECK INTERMITTENT INCIDENT
Refer to EC-624, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>>INSPECTION END Continuity should exist.

Page 1300 of 4555

EC-896
[QR (WITHOUT EURO-OBD)]
INJECTOR CIRCUIT

Component InspectionEBS0114M
INJECTOR
1. Disconnect injector harness connector.
2. Check resistance between terminals as shown in the figure.
Removal and InstallationEBS0114N
INJECTOR
Refer to EM-34, "FUEL INJECTOR AND FUEL TUBE" . Resistance: 13.5 - 17.5Ω [at 10 - 60°C (50 - 140°F)]
PBIB1727E

Page:   < prev 1-10 ... 1251-1260 1261-1270 1271-1280 1281-1290 1291-1300 1301-1310 1311-1320 1321-1330 1331-1340 ... 4560 next >