dashboard warning lights RENAULT TWINGO 2009 2.G Panelwork Workshop Manual

Page 135 of 209

42A-26
FRONT UPPER STRUCTURE
Dashboard cross member: Removal - Refitting
42A
REMOVAL
a
I - REMOVAL PREPARATION OPERATION
aLock the airbag computer using the Diagnostic tool
(see Fault finding - Replacement of components)
(MR 413, 88C, Airbags and pretensioners).
aDisconnect the battery (see Battery: Removal - Re-
fitting) (MR 411, 80A, Battery).
aRemove:
-the dashboard (see Dashboard: Removal - Refit-
ting) (MR 412, 57A, Interior equipment),
-the steering column (see Steering column: Re-
moval - Refitting) (MR 411, 36A, Steering assem-
bly).II - OPERATION FOR REMOVAL OF PART
CONCERNED
aRemove:
-the dashboard cross member wiring harnesses,
-the flange bolts (1) ,
-the flange.
aRemove the bulkhead tie-rod bolt (2) . Equipment required
Diagnostic tool
Tightening torquesm
the dashboard cross
member bolts21 Nm
windscreen aperture
lower cross member tie-
rod bolt21 Nm
the bulkhead tie-rod bolt8 Nm
the flange bolts21 Nm
IMPORTANT
To avoid any risk of triggering when working on
or near a pyrotechnic component (airbags or pre-
tensioners), lock the airbag computer using the
diagnostic tool.
When this function is activated, all the trigger
lines are inhibited and the airbag warning light on
the instrument panel lights up continuously (igni-
tion on).
IMPORTANT
Never handle the pyrotechnic systems (preten-
sioners or airbags) near to a source of heat or
naked flame - they may be triggered.
119713
121240