battery SUZUKI SWIFT 2000 1.G SF310 Service Owners Manual
Page 415 of 557
6E1-24 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
VEHICLE SPEED SENSOR (VSS) For M / T
INSPECTION
1) Disconnect negative cable at battery.
2) Remove combination meter from instrument panel.
3) Connect ohmmeter between “VSS” terminal (2) and “GND” ter-
minal (3) of combination meter and turn cable joint (1) of
speedometer with a screwdriver. Ohmmeter indicator should
move back and forth between 0 (zero) and ∞ (infinity) 4 times
while cable joint is turned one full revolution.
Replace speedometer if check result is not satisfactory.
4) Install combination meter to instrument panel.
5) Connect negative cable at battery.
VEHICLE SPEED SENSOR (VSS) For A / T
INSPECTION
Vehicle speed sensor (1) itself can be checked on its resistance by
disconnecting connector.
NOTE:
Function of vehicle speed sensor can be checked by mea-
suring generated pulse as voltage.
For its measurement, use an analog type voltmeter while
spinning wheels on lift and with selector lever in D position.
Vehicle speed sensor specifications
Coil resistance100 – 300 Ω
Output voltage at 40 km / h (25 mile / h)approximately 1 V
FUEL LEVEL SENSOR (GAUGE)
Refer to Section 8.
Page 416 of 557
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-25
1. Main relay
2. Relay box
CRANKSHAFT POSITION SENSOR
INSPECTION
Check crankshaft position sensor referring to step 1 and 2 of DTC
P0335 Flow Chart. If malfunction is found, replace.
REMOVAL
1) Hoist vehicle.
2) Remove fender apron extension on right side.
3) Disconnect connector from crankshaft position sensor.
4) Remove crankshaft position sensor from oil pan.
INSTALLATION
1) Check to make sure that crankshaft position sensor and pulley
tooth is free from any metal particles and damage.
2) Install crankshaft position sensor to oil pan.
3) Connect connector to it securely.
4) Install fender apron extension.
MAIN RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove main relay from relay box.
3) Check resistance between each two terminals as in table below.
If check results are as specified, proceed to next operation
check. If not, replace.
TERMINALS
RESISTANCE
Between A and B∞ (infinity)
Between C and D100 – 120 Ω
4) Check that there is continuity between terminals “A” and “B”
when battery is connected to terminals “C” and “D”.
If found defective, replace.
Page 417 of 557
6E1-26 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Throttle body
FUEL PUMP RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove fuel pump relay (1) from relay box (2).
3) Structure of fuel pump relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
If found defective, replace.
FUEL INJECTOR RESISTOR
INSPECTION
1) With ignition switch OFF, disconnect resistor coupler.
2) Check resistor (1) for resistance.
Resistance: 1.9 – 2.1 Ω at 20C, 68F
If check result is not satisfied, replace.
FUEL CUT OPERATION
INSPECTION
NOTE:
Before inspection, check to make sure that gear shift lever is in
neutral position (with A/T model, selector lever in “P” range), A/C
is OFF and that parking brake lever is pulled all the way up.
1) Warm up engine to normal operating temperature.
2) While listening to sound of injector by using sound scope (2) or
such, increase engine speed to higher than 3,000 r / min.
3) Check to make sure that sound to indicate operation of injector
stops when throttle valve operation of injector stops when
throttle valve is closed instantly and it is heard again when en-
gine speed is reduced to less than about 2,000 r / min.
IDLE SPEED CONTROL SYSTEM
SYSTEM INSPECTION
NOTE:
Before inspection, check to make sure that:
–Gear shift lever is in neutral position (with A / T vehicle, selec-
tor lever in “P” range) and that parking brake lever is pulled
all the way up.
–Battery voltage is higher than 11 V.
–Throttle valve moves smoothly.
–Ambient temperature is higher than 0C (32F)
Page 419 of 557
6E1-28 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. 1.5 V battery (6.0 V in total)
“A”
“B”
“C”
3) Arrange 4 new 1.5 V batteries in series (6.0 V in total).
With throttle lever in contact with plunger of ISC actuator, con-
nect these batteries to ISC actuator terminals and check ISC ac-
tuator for operation.
CAUTION:
Make sure that connection is made correctly between
batteries and terminals. Also, voltage must not be ap-
plied for longer than 1 second, or a faulty condition will
occur.
Make sure that connection is correct. Connecting to
other terminals may cause damage to closed throttle
position switch (idle switch).
After inspection, be sure to check that CTP switch is
ON. If it is OFF, move ISC actuator again and turn CTP
switch ON.
When positive terminal is
connected to “E” terminal
while plunger is contracted: Plunger expands
When positive terminal is
connected to “D” terminal
while plunger is expanded : Plunger contracts
When an abnormality has been found in above checks 2) and 3),
replace.
CLOSED THROTTLE POSITION (CTP) SWITCH, IDLE
SWITCH (IN ISC ACTUATOR)
INSPECTION
1) Disconnect connector from ISC actuator.
2) Arrange 3 new 1.5 V batteries in series (4.5 V in total) and con-
nect these batteries to CTP switch terminals “A” and “B”.
Check voltage between terminals “B” and “C” under following
each condition.
Throttle lever is in contact with ISC
actuator plunger : 0 – 1 V
Throttle lever is apart from plunger : 3.5 – 5.5 V
If check result is not satisfactory, replace throttle lower body.
Page 420 of 557
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-29
1. ISC actuator relay
2. Relay box
1. EFE heater
2. Rubber cover
3.“Red” wire
4.“Black” wire
ISC ACTUATOR RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove ISC actuator relay from relay box.
3) Structure of ISC actuator relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
EFE HEATER CONTROL SYSTEM
SYSTEM CIRCUIT INSPECTION
NOTE:
Before inspection, check to make sure that gear shift lever is
in neutral position (with A/T model, selector lever in “P” range)
and that parking brake lever is pulled all the way up.
1) Turn up rubber cover of EFE heater to expose terminal-to-wire
connections.
2) Connect voltmeter to EFE terminals and check for voltage under
each condition given below.
CONDITION
VOLTAGE
Fast idle condition
Coolant temp.: below 80C (176F)
Engine speed: over 750 r/min.Battery
voltage
After warming up (other than above)No voltage
If check results are not as specified in above table, check EFE
heater, relay and wire harness.
3) Cover EFE heater connections with rubber cover.
EFE HEATER
CAUTION:
Do not bend wire harness of EFE heater excessively.
ON-VEHICLE INSPECTION
1) Disconnect EFE heater coupler.
2) Check resistance of EFE heater.
If it is not as specified below, replace.
EFE heater resistance: 0.5 – 3.0 Ω at 20C (68F)
3) Connect EFE heater coupler securely.
REMOVAL
1) Remove throttle body according to procedure described pre-
viously.
In this case, however, it is not necessary to disconnect fuel
hoses and engine cooling water hoses from throttle body.
2) Disconnect EFE heater coupler.
3) Remove EFE heater from intake manifold.
Page 421 of 557
6E1-30 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Insulator
2. Lower gasket
3. Heater
1. Intake manifold
2. EFE heater
1. EFE heater relay
2. Relay box
1. Radiator fan motor
INSPECTION
Check lower gasket for damage and deterioration. Replace as
necessary.
Check heater and insulator for crack, corrosion or any other dam-
age. Replace as necessary.
INSTALLATION
1) Clean mating surfaces of throttle body and intake manifold that
mate with EFE heater.
2) Install EFE heater to intake manifold.
Use new upper gasket.
3) Install throttle body according to procedure described previous-
ly.
4) Connect EFE heater coupler.
EFE HEATER RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove EFE heater relay from relay box.
3) Structure of EFE heater relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
If found defective, replace.
RADIATOR FAN CONTROL SYSTEM
SYSTEM INSPECTION
WARNING:
Keep hands, tools, and clothing away from engine cooling
fan to help prevent personal injury. This fan is electric and
can come on whether or not the engine is running. The fan
can start automatically in response to the ECT sensor with
the ignition switch in the “ON” position.
Connect SUZUKI scan tool (2) to DLC (3).
Start engine and keep it running to warm it up.
Now check to ensure that radiator fan is started when the coolant
temperature displayed on SUZUKI scan tool reaches 96C
(205F).
If check result is not satisfactory, check RFC relay, wire harness,
ECT sensor, ECM, coolant temp. meter and sender gauge unit.
Refer to “DTC P0480 FLOW TABLE” of Section 6 and “COOLANT
TEMP. METER AND GAUGE UNIT” of Section 8.
Page 422 of 557
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-31
1. RFC relay
2. Relay box
RADIATOR FAN CONTROL RELAY (RFC RELAY)
INSPECTION
1) Disconnect negative cable at battery.
2) Remove RFC relay from relay box.
3) Structure of RFC relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay. If found defective, replace.
RADIATOR FAN
INSPECTION
1) Disconnect negative cable at battery.
2) Disconnect radiator fan motor connector.
3) Connect battery to the motor and check for operation.
If fan fails to operate, replace.
Page 424 of 557
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-33
EVAP CANISTER PURGE VALVE INSPECTION
WARNING:
Do not suck the air through valve. Fuel vapor inside valve
is harmful.
1) With the ignition switch OFF position, disconnect coupler from
EVAP canister purge valve.
2) Check resistance between two terminals of EVAP canister
purge valve.
Resistance of EVAP canister purge valve:
33 – 39 Ω at 20C (68F)
If resistance is as specified, proceed to next operation check.
If not, replace.
3) Disconnect vacuum hoses from intake manifold and its pipe.
4) With coupler disconnected, blow into pipe “A”. Air should not
come out of pipe “B”.
5) Connect 12 V-battery to EVAP canister purge valve terminals.
In this state, blow pipe “A”.
Air should come out of pipe “B”.
If check result is not as described, replace canister purge valve.
6) Connect vacuum hoses.
7) Connect EVAP canister purge valve coupler securely.
Page 429 of 557
6E2
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-1
GENERAL DESCRIPTION6E2- 2 . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2- 6. . . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2- 7. . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2- 8. . . . . .
Engine and Emission Control Input /
Output Table 6E2- 9. . . . . . . . . . . . . . . . . . . . . . . .
DIAGNOSISSee Section 6. . . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE6E2-13 . . . . . . . . . . . . . . . .
Accelerator Cable Adjustment 6E2-13. . . . . . . . . .
Idle Speed/Idle Air Control (IAC)
Duty Inspection 6E2-14. . . . . . . . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2-15. . . . . . . . . . . . . . . . . .
Throttle Body 6E2-15. . . . . . . . . . . . . . . . . . . . . . . .
Idle Air Control Valve 6E2-17. . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2-18. . . . . . . . . . . . . .
Fuel Pressure Inspection 6E2-18. . . . . . . . . . . . . .
Fuel Pump 6E2-21. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Pressure Regulator 6E2-22. . . . . . . . . . . . . . .
Fuel Injector 6E2-23. . . . . . . . . . . . . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2-27. . . . . .
ECM / PCM 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . . .
MAP Sensor 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . .
TP Sensor 6E2-28. . . . . . . . . . . . . . . . . . . . . . . . . . .
IAT Sensor 6E2-29. . . . . . . . . . . . . . . . . . . . . . . . . .
ECT Sensor 6E2-30. . . . . . . . . . . . . . . . . . . . . . . . . Heated Oxygen Sensor -1 and -2 6E2-31. . . . . . .
Camshaft Position Sensor 6E2-32. . . . . . . . . . . . .
Crankshaft Position Sensor 6E2-32. . . . . . . . . . . .
Vehicle Speed Sensor 6E2-33. . . . . . . . . . . . . . . . .
Fuel Level Sensor (gauge) 6E2-33. . . . . . . . . . . . .
Main Relay, Fuel Pump Relay and
Radiator Fan Control Relay 6E2-33. . . . . . . . . . .
Fuel Cut Operation (Inspection) 6E2-34. . . . . . . .
Radiator Fan Control System 6E2-34. . . . . . . . . .
System Inspection 6E2-34. . . . . . . . . . . . . . . . . .
Radiator Fan 6E2-34. . . . . . . . . . . . . . . . . . . . . . .
EMISSION CONTROL SYSTEM 6E2-35. . . . . . . . .
EGR System 6E2-35. . . . . . . . . . . . . . . . . . . . . . . . .
EVAP Control System 6E2-36. . . . . . . . . . . . . . . . .
EVAP Canister Purge Inspection 6E2-36. . . . . .
Vacuum Passage Inspection 6E2-37. . . . . . . . .
Vacuum Hose Inspection 6E2-37. . . . . . . . . . . .
EVAP Canister Purge Valve
Inspection 6E2-37. . . . . . . . . . . . . . . . . . . . . . . .
EVAP Canister Inspection 6E2-38. . . . . . . . . . .
PCV System 6E2-38. . . . . . . . . . . . . . . . . . . . . . . . .
PCV Hose Inspection 6E2-38. . . . . . . . . . . . . . .
PCV Valve Inspection 6E2-38. . . . . . . . . . . . . . .
SPECIAL TOOLS6E2-39 . . . . . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE
SPECIFICATIONS6E2-39 . . . . . . . . . . . . . . . . . . . . .
SECTION 6E2
ENGINE AND EMISSION CONTROL SYSTEM
(SFI FOR G13)
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
CONTENTS
Page 436 of 557
6E2-8 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
INFORMATION SENSORS
-1. MAP sensor
-2. TP sensor
-3. IAT sensor
-4. ECT sensor
-5. Heated oxygen sensor-1
5-1. Heated oxygen sensor-2
-6. VSS (A / T)
-7. Transmission range switch (A / T)
-8. Battery
-9. CMP sensor
-10. CKP sensor
-11. Fuel level sensor (gauge) (in fuel tank)
-12. PSP switch
-13. A / C control module (if equipped)
-14. VSS (speedometer) (M / T)OTHERS
A: ECM (PCM)
B: Main relay
C: EVAP canister
D: Data link connector CONTROL DEVICES
a: Fuel injector
b: EVAP canister purge valve
c: Fuel pump relay
d: EGR valve (step motor)
e: Malfunction indicator lamp
f: Ignition coil assembly
g: Radiator fan control relay
h: IAC valve
The electronic control system consists of 1) various
sensors which detect the state of engine and driving
conditions, 2) ECM (PCM) which controls various de-
vices according to the signals from the sensors and
3) various controlled devices.
Functionally, it is divided into nine sub systems:
Fuel injection control system
Idle speed control systemFuel pump control system
A / C control system (if equipped)
Radiator fan control system
EGR system
Evaporative emission control system
Oxygen sensor heater control system
Ignition control system
Also, with A / T model, PCM controls A / T.
ELECTRONIC CONTROL SYSTEM