torque SUZUKI SWIFT 2006 2.G Service Owner's Manual
Page 282 of 1496
Downloaded from www.Manualslib.com manuals search engine 1C-10 Engine Electrical Devices: 
Knock Sensor Removal and InstallationS7RS0B1306016
Removal1) Disconnect negative (–) cable at battery.
2) Hoist vehicle.
3) Remove right side drive shaft referring to “Front  Drive Shaft Assembly Removal and Installation in 
Section 3A”.
4) Disconnect knock sensor connector (1).
5) Remove knock sensor (2) from cylinder block.
Installation
Reverse removal procedure for installation.
Tightening torque
Knock sensor (a):  22 N· m (2.2 kgf-m, 16.0 lb-ft)
Main Relay, Fuel Pump Relay and Starting Motor 
Control Relay Inspection
S7RS0B1306017
1) Disconnect negative (–) cable at battery.
2) Remove main relay (1), fuel pump relay (3) and/or 
starting motor control relay (2) from individual circuit 
fuse box No.1.
3) Check that there is no continuity between terminal  “C” and “D”. If there is continuity, replace relay.
4) Connect battery positive (+ ) terminal to terminal “B” 
of relay. Connect battery negative (–) terminal to 
terminal “A” of relay. Ch eck for continuity between 
terminal “C” and “D”. If t here is no continuity when 
relay is connected to the battery, replace relay.
1 2, (a)
I3RB0A130007-01
"D"
"B" "A"
"C"
2
1
3
I4RS0A130014-01  
Page 283 of 1496
Downloaded from www.Manualslib.com manuals search engine Engine Electrical Devices:  1C-11
MAF and IAT Sensor On-Vehicle InspectionS7RS0B1306018
NOTE
Before performed this inspection, be sure to 
read the “Precautions of ECM Circuit 
Inspection in Section 1A”.
 
1) Disconnect negative (–) cable at battery.
2) Disconnect MAF and IAT sensor connector.
3) Connect voltmeter to “BLK/RED” wire terminal (2) of 
MAF and IAT sensor connector (1) disconnected and 
ground.
4) Turn ON ignition switch position and check that  voltage is battery voltage.
If not, check if wire harness is open or connection is 
poor.
5) Turn OFF ignition switch position and connect  connector to MAF and IAT sensor.
6) Remove ECM from its bracket referring to “ECM  Removal and Installation”.
7) Connect special tool between ECM and ECM  connector referring to “Inspection of ECM and Its 
Circuits in Section 1A”.
8) Turn ON ignition switch position and check MAF  signal voltage between “C37-26” terminal circuit and 
“C37-27” terminal circuit of special tool.
MAF signal voltage between “C37-26” terminal 
circuit and “C37-27” termi nal circuit of special 
tool
MAF signal voltage of MAF and IAT sensor with 
ignition switch turned ON: 0.5 – 1.0 V
9) Start engine and check that voltage is lower than 5 V  and it rises as engine speed increases.
MAF signal voltage between “C37-26” terminal 
circuit and “C37-27” termi nal circuit of special 
tool
MAF signal reference voltage of MAF and IAT 
sensor at specified Idle speed: 1.3 – 1.8 V 10) If check result is not as
 specified above, cause may 
lie in wire harness, connec tor connection, MAF and 
IAT sensor or ECM.
MAF and IAT Sensor Removal and InstallationS7RS0B1306019
CAUTION! 
• Do not disassemble MAF and IAT sensor.
• Do not expose MAF and IAT sensor to any  shock.
• Do not clean MAF and IAT sensor.
• If MAF and IAT sensor has been dropped, it  should be replaced.
• Do not blow compressed air by using air  gun or the like.
• Do not put finger or any other object into  MAF and IAT sensor. Malfunction may 
occur.
 
Removal
1) Disconnect negative (–) cable at battery.
2) Disconnect MAF and IAT sensor connector.
3) Remove air cleaner case (1).
4) Remove MAF and IAT sensor (2) from air cleaner  case.
Installation
Reverse removal procedure noting the followings.
• Tighten MAF and IAT sensor screws to specified  torque.
Tightening torque
MAF and IAT sensor screw (a):  1.5 N·m (0.15 kgf-
m, 1.1 lb-ft)
• Connect MAF and IAT sensor connector securely.
1. ECM
I3RB0A130009-01
“C37-27” “C37-26” 1
I4RS0A130009-01
1
2
I4RS0A130010-01
(a)
I4RS0A130011-01  
Page 285 of 1496
Downloaded from www.Manualslib.com manuals search engine Engine Electrical Devices:  1C-13
Without Using SUZUKI Scan Tool1) Measure sensor voltage between “C37-23” terminal  of ECM connector and vehicle body ground referring 
to “Inspection of ECM and Its Circuits in Section 1A”.
If check result is satisfactory, electric load current 
sensor is in good condition.
If check result is not satisfactory, check the following 
parts and circuit.
• Electric load current sensor circuit (power, ground and output)
• Following charging system components – Battery (refer  to “Battery Inspection in Section 
1J”)
– Generator (refer to “Generator Inspection in  Section 1J”)
– Generator output control circuit (refer to  “Generator Test (Undercharged Battery Check) 
in Section 1J”)
– Generator field coil monitor circuit (refer to  “Generator Inspection in Section 1J”) If electric load current sensor circuit and charging 
system is in good condition, 
electric load current sensor 
(1) is faulty.
Specifications
Tightening Torque SpecificationsS7RS0B1307001
Reference:
For the tightening torque of fastener not specified in this  section, refer to “Fasteners Information in Section 0A”.
2. Main fuse box
2
1
I5RS0C130001-01
Fastening part
Tightening torque
Note
N ⋅mkgf-mlb-ft
ECM mounting bolt  8 0.8  6.0  )
APP sensor assembly nut 5.5  0.55  4.0  )
ECT sensor 15 1.5  11.0  )
Heated oxygen sensor 45 4.5  32.5  )
CMP sensor bolt 10 1.0  7.5  )
CKP sensor bolt  10 1.0  7.5  )
Knock sensor 22 2.2  16.0  )
MAF and IAT sensor screw 1.5 0.15  1.1  )  
Page 289 of 1496
Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-4
Targeted Timing Varying Operation
Diagnostic Information and Procedures
Compression CheckS7RS0B1404001
Check compression pressure on all 4 cylinders as 
follows:
1) Warm up engine to normal operating temperature.
2) Stop engine after warming up.
NOTE
After warming up engine, place transaxle 
gear shift lever in “Neutral”, and set parking 
brake and block drive wheels.
 
3) Disconnect negative cable at battery.
4) Remove engine cover.
5) Remove air cleaner assembly and air suction hose  referring to “Air Cleaner Components”.
6) Remove cylinder head upper cover.
7) Disconnect ignition coil couplers (1).
8) Remove ignition coil assemblies (2) with high- tension cord (3).
9) Remove all spark plugs.
10) Disconnect fuel injector wires (4) at the coupler. Driving condition Valve timing Target of control Effect
Engine running at idle 
speed Most retardedTo shorten the valve opening overlap in 
order to prevent the exhaust gas 
counterflow to in
take manifold. Stabilization of the engine 
rotation at idle speed.
Average engine load 
range To the advanced 
sideTo lengthen the valve opening overlap 
in order to enhance the internal 
exhaust gas recirculation and reduce 
the pumping loss. Improvement of the fuel 
efficiency.
Lowering of the exhaust 
emission.
Light engine load 
range To the retarded sideTo shorten the valve opening overlap in 
order to prevent the exhaust gas 
counterflow to in
take manifold. Keeping of the engine stability.
Low or average 
engine speed range 
with heavy engine 
load To the advanced 
side
To advance the closing timing of the 
intake valve in order to improve the 
volumetric efficiency. Improvement of generating the 
engine torque at low and 
average engine speed.
High engine speed 
range with heavy 
engine load To the retarded sideTo retard the closing timing of the 
intake valve in order to improve the 
volumetric efficiency. Improvement of generating the 
engine power.
Low engine coolant 
temperature Most retardedTo shorten the valve opening overlap in 
order to prevent the exhaust gas 
counterflow to intake manifold and 
reduce the fuel increasing.
To slow the fast idle speed of the 
engine as a result of stabilizing the 
engine idling. Stabilization of the fast idling of 
the engine.
Improvement of the fuel 
efficiency.
At engine starting and 
stopping Most retardedTo shorten the valve opening overlap in 
order to prevent the exhaust gas 
counterflow to in
take manifold. Improvement of start ability.I2RH0B140003-01  
Page 293 of 1496
Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-8
For example of intake side:
When thickness of removed shim is 2.40 mm (0.094 
in.), and measured valve clearance is 0.45 mm 
(0.018 in.).
A = 2.40 mm (0.094 in.) + 0.45 mm (0.018 in.) – 0.20 
mm (0.008 in.) = 2.65 mm (0.104 in.) 
Calculated thickness of new shim = 2.65 mm (0.104 
in.)
6) Select new shim No. (1) with a thickness as close as  possible to calculated value.
Available new shims No.
7) Install new shim facing shim No. side with tappet. 8) Lift valve by turning crankshaft counterclockwise (in 
opposite direction against above Step 4)) and 
remove special tool.
Special tool
(A):  09916–67020
(A):  09916–67021
9) Install camshaft housing (1) and tighten bolts to  specified torque.
Tightening torque
Camshaft housing bolt (a ):  11 N·m (1.1 kgf-m, 
8.0 lb-ft)
10) Check valve clearance again after adjusting it. 11) After checking and adjusting all valves.
12) Install cylinder head cover referring to “Cylinder  Head Cover Removal and Installation”.
Thickness 
mm (in.) Shim No.Thickness 
mm (in.) Shim No.
2.175 (0.0856) 218 2.600 (0.1024) 260
2.200 (0.0866) 220 2.625 (0.1033) 263
2.225 (0.0876) 223 2.650 (0.1043) 265
2.250 (0.0886) 225 2.675 (0.1053) 268
2.275 (0.0896) 228 2.700 (0.1063) 270
2.300 (0.0906) 230 2.725 (0.1073) 273
2.325 (0.0915) 233 2.750 (0.1083) 275
2.350 (0.0925) 235 2.775 (0.1093) 278
2.375 (0.0935) 238 2.800 (0.1102) 280
2.400 (0.0945) 240 2.825 (0.1112) 283
2.425 (0.0955) 243 2.850 (0.1122) 285
2.450 (0.0965) 245 2.875 (0.1132) 288
2.475 (0.0974) 248 2.900 (0.1142) 290
2.500 (0.0984) 250 2.925 (0.1152) 293
2.525 (0.0994) 253 2.950 (0.1161) 295
2.550 (0.1004) 255 2.975 (0.1171) 298
2.575 (0.1014) 258 3.000 (0.1181) 300
I2RH0B140015-01
1. Tappet
2. Camshaft
(A)2
1
I3RM0A140006-01
I2RH0B140149-01  
Page 296 of 1496
Downloaded from www.Manualslib.com manuals search engine 1D-11 Engine Mechanical: 
2) Remove oil, old sealant, and dust from sealing surfaces on cylinder head and cover. After cleaning, 
apply sealant “A” to the following point.
• Cylinder head cover gasket (1) sealing surface area (2) as shown.
“A”:  Water tight sealant 99000–31250 
(SUZUKI Bond No.1207F) 
• Timing chain cover (1) and cylinder head (2)  mating surface as shown.
“A”:  Water tight sealant 99000–31250 
(SUZUKI Bond No.1207F)  3) Install cylinder head cover to cylinder head.
NOTE
When installing cylinder head cover, use care 
so that cylinder head cover gasket or spark 
plug hole gaskets will not get out of place or 
fall off.
 
4) Tighten cylinder head cover bolts as follows.
a) Tighten cylinder head cover bolts to 3 N ⋅m (0.3 
kgf-m, 2.5 lb-ft) according to numerical order (“1” 
through “7”) as shown in figure.
b) In the same manner as  in Step, a) tighten them 
to 5 N ⋅m (0.5 kgf-m, 4.0 lb-ft).
c) Retighten them by turning through 8 N ⋅m (0.8 
kgf-m, 6.0 lb-ft) in same manner as Step a).
Tightening torque
Cylinder head cover bolt (a):  Tighten 3 N ⋅m (0.3 
kgf-m, 2.5 lb-ft), 5 N ⋅m (0.5 kgf-m, 4.0 lb-ft) and 8 
N ⋅m (0.8 kgf-m, 6.0 lb-ft) by the specified 
procedure
5) Connect PCV hose (2) to PCV valve (3).
6) Connect breather hose (4).
7) Install oil level gauge (1).
8) Install wire harness clamp to cylinder head cover.
9) Install ignition coil assemb lies with high-tension cord 
referring to “Ignit ion Coil Assembly (Including ignitor) 
Removal and Installati on in Section 1H”.
10) Connect ignition coil couplers and clamp harness  securely.
11) Install cylinder head upper cover.
12) Install air cleaner case and resonator.
13) Connect negative cable at battery.
I2RH0B140036-01
I2RH0B140037-01
I3RH0B140016-01  
Page 300 of 1496
Downloaded from www.Manualslib.com manuals search engine 1D-15 Engine Mechanical: 
Installation
Reverse removal procedure for installation noting the 
followings.
• Use new intake manifold gasket (1).
• Use new EGR pipe gasket (2).
• Install intake manifold bolts (3) and nuts (4) to  specified torque.
Tightening torque
Intake manifold bolt  (a):  23 N·m (2.3 kgf-m, 17.0 
lb-ft)
Intake manifold nut (b):   23 N·m (2.3 kgf-m, 17.0 
lb-ft) • Install intake manifold rear stiffener (1) as shown in 
figure.
• Connect ground terminal (2) to intake manifold to  specified torque.
Tightening torque
Intake manifold ground terminal bolt (a):  11 N·m (
1.1 kgf-m, 8.0 lb-ft)
• Install throttle body referrin g to “Electric Throttle Body 
Assembly Removal and Installation”.
• Install cowl top plate referring to “Cowl Top  Components in Section 9K”.
• Refill cooling system refe rring to “Cooling System 
Flush and Refill in Section 1F”.
• Upon completion of installation, turn ignition switch  ON but engine OFF and check for fuel leaks.
• Finally, start engine and check for engine coolant  leaks.
1
2
3,(a)
4,(b)
I6RS0B141011-01
(a)
12
I6RS0B141012-01  
Page 304 of 1496
Downloaded from www.Manualslib.com manuals search engine 1D-19 Engine Mechanical: 
24) Before removing engine with transaxle from engine compartment, recheck to  make sure all hoses, 
electric wires and cables are disconnected from 
engine and transaxle.
25) Lower engine with transaxle from engine  compartment.
CAUTION! 
Before lowering engine, to avoid damage to 
A/C compressor and clutch operating 
cylinder, make clearance by rising them. Be 
sure not to damage suspended A/C 
compressor and clutch operating cylinder.
 
26) Disconnect transaxle from engine, referring to “Manual Transaxle Unit Dismounting and 
Remounting in Section 5B” or “Automatic Transaxle 
Unit Dismounting and Re mounting in Section 5A”.
27) For M/T model, remove clutch cover and clutch disk  referring to “Clutch Cover, Clutch Disc and Flywheel 
Removal and Installa tion in Section 5C”.
Installation 1) For M/T model, install clutch cover and clutch disk  referring to “Clutch Cover, Clutch Disc and Flywheel 
Removal and Installa tion in Section 5C”.
2) Connect transaxle to engine referring to “Manual  Transaxle Unit Dismounting and Remounting in 
Section 5B” or “Automatic Transaxle Unit 
Dismounting and Remounting in Section 5A”.
3) Lift engine and transaxle into engine compartment  with jack.
4) Install engine left mounting bracket nuts (1) and  engine right mounting nuts (2).Tighten these nuts to 
specified torque.
Tightening torque
Engine left mounting bracket nut (a):  55 N·m (5.5 
kgf-m, 40.0 lb-ft)
Engine right mounting nut (b):  65 N·m (6.5 kgf-
m, 47.0 lb-ft) 5) Support engine assemble by using chain hoist.
6) Install engine rear mounting to engine rear 
mountingNo.1 bracket.
Tightening torque
Engine rear mounting bush bolt:  55 N·m (5.5 
kgf-m, 40.0 lb-ft)
7) Install suspension frame referring to “Front  Suspension Frame, Stabiliz er Bar and/or Bushings 
Removal and Installati on in Section 2B”.
8) Remove chain hoist.
9) Install exhaust No.1, No.2 and center pipes referring  to “Exhaust Pipe and Muffler Removal and 
Installation in Section 1K”.
10) Connect drive shaft joints referring to “Front Drive  Shaft Assembly Removal and Installation in Section 
3A”.
11) Reverse disconnected hoses, cables and electric  wires for connection  noting the followings.
• Tighten nuts to specified torque.
Tightening torque
Starting motor terminal nut:  11 N·m (1.1 kgf-m, 
8.0 lb-ft)
Generator terminal nut:  6 N·m (0.6 kgf-m, 4.5 lb-
ft)
Intake manifold ground terminal bolt:  11 N·m (
1.1 kgf-m, 18.0 lb-ft)
12) Install intake manifold  rear stiffener to intake 
manifold and cylinder block.
13) Install air cleaner assembly referring to “Air Cleaner  Components”.
14) Install cowl top referring  to “Cowl Top Components in 
Section 9K”.
I4RS0A140009-01
1, (a)
2, (b)
I4RS0A140010-01  
Page 307 of 1496
Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-22
Installation1) Clean sealing surface on timing chain cover, cylinder  block and cylinder head.
Remove oil, old sealant and dust from sealing 
surface.
2) Install oil seal (1) to timi ng chain cover, if removed.
NOTE
When installing new oil seal, press fit to 
timing chain cover (2) by using special tool 
(bearing installer) as shown in figure.
 
Drive in dimension
“a”: 1.5 mm (0.06 in.)
Special tool
(A):  09913–75810
3) Install oil control valve to timing chain cover referring  to “Oil Control Valve Removal and Installation”.
4) Apply sealant “A” to mating surface of cylinder and  cylinder head and “B” to mating surface of timing 
chain cover as shown in figure.
“A”:  Water tight sealant 99000–31140 (SUZUKI 
Bond No.1207B) 
“B”:  Sealant 99000–31260 (SUZUKI Bond 
No.1217G) 
Sealant amount for timing chain cover
Width “a”: 3 mm (0.12 in.)
Height “b”: 2 mm (0.08 in.) 5) Apply engine oil to oil seal lip, then install timing 
chain cover (1). Tighten bolts and nut to specified 
torque.
NOTE
Before installing timing chain cover, check 
that pin is securely fitted.
 
Tightening torque
Timing chain cover bolt (a):  25 N·m (2.5 kgf-m, 
18.0 lb-ft)
Timing chain cover nut (b):  25 N·m (2.5 kgf-m, 
18.0 lb-ft)
6) Apply engine oil to new O-rings (2) and install them  to cap (3).
7) Install cap (3) to ti ming chain cover (1).
Tighten bolts to specified torque.
Tightening torque
Cap bolt (c):  25 N·m (2.5 kgf-m, 18.0 lb-ft)
I2RH0B140058-01
I3RH0B140025-01
(a)
(b)
(c)
1
2
3
I4RS0B140011-02  
Page 308 of 1496
Downloaded from www.Manualslib.com manuals search engine 1D-23 Engine Mechanical: 
8) Install new O-ring (1) to oil gallery pipes No.2 (2) and 
No.3 (3).
9) Install oil gallery pipes  No.2 and No.3 to cylinder 
head (4) and timing chain cover (5).
Tighten bolts to specified torque.
Tightening torque
Oil gallery pipe No.2 and No.3 bolt (a):  11 N·m (
1.1 kgf-m, 8.0 lb-ft)
10) Install water pump pulley. 11) Install cylinder head cover referring to “Cylinder  Head Cover Removal and Installation”.
12) Install oil pan referring  to “Oil Pan and Oil Pump 
Strainer Removal and Installation in Section 1E”.
13) Install crankshaft pulley (1). Tighten bolt (2) to  specified torque. To lock crankshaft pulley, use 
special tool with it as shown in figure.
Special tool
(A):  09917–68221
Tightening torque
Crankshaft pulley bolt (a):  150 N·m (15.0 kgf-m, 
108.5 lb-ft)
14) Install engine assembly to vehicle referring to  “Engine Assembly Removal and Installation”.
Timing Chain Cover InspectionS7RS0B1406014
Oil Seal
Check oil seal lip for fault or other damage. Replace as 
necessary. Timing Chain Cover
Inspect strainer (1) of oil passage for driving intake cam 
timing sprocket assembly (VVT actuator).
If clog or foreign matter exists, clean strainer.
Oil Control Valve Removal and InstallationS7RS0B1406015
Removal
Remove oil gallery pipe No.1 
(1) and oil control valve (2) 
from timing chain cover (3).
Installation
1) Install new O-ring (4) to oil control valve.
2) Install oil control valve to timing chain cover. Tighten nuts to specification.
Tightening torque
Oil control valve mounting  nut (a):  11 N·m (1.1 
kgf-m, 8.0 lb-ft)
3) Install oil gallery pipe No .1 with new copper washers 
(5) to timing chain cover.
Tighten bolts to specification.
Tightening torque
Oil gallery pipe No.1 bolt  (b):  30 N·m (3.0 kgf-m, 
21.5 lb-ft)
(a)
(a) 1
2
3
4
5
I3RH0B140027-01
I2RH0B140056-01
1
I3RH0B140028-01
1
5
(b) 3
(a)
2 4
5
I3RM0A140027-01