TOYOTA AVENSIS 2003 Service Repair Manual
Page 501 of 2234
A61184
A66202
A77305
A77380
SST
A77381
SST
14±142
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
23. REMOVE ENGINE MOUNTING BRACKET NO.2 RH
(a) Place the jack underneath the engine, and put a wooden block on the jack.
(b) Remove the 2 bolts and 2 nuts, and then detach the mounting bracket No. 2 RH.
24. REMOVE TRANSVERSE ENGINE ENGINE MOUNTING INSULATOR
(a) Remove the 3 bolts and the engine mounting insulator.
25. REMOVE CRANKSHAFT PULLEY
(a) Using SST, fix the crankshaft pulley and loosen a crank- shaft pulley bolt.
SST 09213±54015 (91651±60855), 09330±00021
(b) Using a crankshaft pulley bolt and SST, remove the crank- shaft pulley.
SST 09950±50013 (09951±05010, 09952±05010, 09953±05020, 09954±05021)
http://vnx.su
Page 502 of 2234
A77286
Push
A64641
A00019
A77288
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
14±143
AVENSIS REPAIR MANUAL (RM1018E)
26. REMOVE CHAIN TENSIONER ASSY NO.1
(a) Remove the 2 nuts, the chain tensioner No. 1 and gasket.
NOTICE:
Do not turn the crankshaft.
27. REMOVE CRANKSHAFT POSITION SENSOR 28. REMOVE OIL PAN SUB±ASSY
(a) Remove the 12 bolts and 2 nuts.
(b) Insert the blade of SST between the crank case, timingchain cover and oil pan, cut off applied sealer and remove
the oil pan.
SST 09032±00100
NOTICE:
Be careful not to damage the contact surface of the timing
chain cover, crank case and oil pan.
29. REMOVE V±RIBBED BELT TENSIONER ASSY
http://vnx.su
Page 503 of 2234
A77289
Pry
A77243
14±144
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
30. REMOVE TIMING CHAIN OR BELT COVER SUB±ASSY
(a) Remove the 14 bolts and 2 nuts.
(b) Using a screwdriver, pry between the timing chain cover
and cylinder head or cylinder block.
(c) Remove the timing chain cover.
NOTICE:
Be careful not to damage the contact surface of the timing
chain cover, cylinder head and cylinder block.
31. REMOVE CRANKSHAFT POSITION SENSOR PLATE NO.1
32. REMOVE CHAIN TENSIONER SLIPPER
(a) Remove the 2 bolts and the chain tensioner slipper.
33. REMOVE CHAIN VIBRATION DAMPER NO.1
(a) Remove the bolt and the chain vibration damper No. 1 34. REMOVE TIMING CHAIN GUIDE
(a) Remove the bolt and the timing chain guide.
35. REMOVE CHAIN SUB±ASSY
36. REMOVE CRANKSHAFT TIMING GEAR OR SPROCKET
http://vnx.su
Page 504 of 2234
A77382
Groove90
A77383
Groove
A66833
B11424
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
14±145
AVENSIS REPAIR MANUAL (RM1018E)
37. REMOVE NO.2 CHAIN SUB±ASSY
(a) Turn the crankshaft counterclockwise 90 , and align an
adjusting hole of the oil pump drive shaft gear with the
groove of the oil pump.
(b) Put a 4 mm diameter bar in the adjusting hole of the oil pump drive shaft gear to lock in position, and remove the
nut.
(c) Remove the bolt, and then remove the chain tensioner and spring.
(d) Remove the oil pump drive shaft gear and chain No. 2.
38. INSTALL NO.2 CHAIN SUB±ASSY
(a) Set the crankshaft key to the left side position.
(b) Orient the flat portion of the drive shaft upward.
http://vnx.su
Page 505 of 2234
A77384
Mark Link
Timing Mark
Timing Mark
Mark Link
A77385
Groove
A77386
Groove
A77387
90
14±146
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
(c) Align the mark links (yellow colored links) with the timing marks of each gear as shown in the illustration.
(d) Install the gears to the crankshaft and oil pump shaft with
the chain wrapped.
(e) Temporarily tighten the oil pump drive shaft gear with the nut.
(f) Insert the damper spring into the adjusting hole, and install the chain tensioner plate with the bolt.
Torque: 12 N m (122 kgf cm, 9.0 ftlbf)
(g) Align an adjusting hole of the sprocket with the groove of the oil pump.
(h) Insert a 4 mm diameter bar into the adjusting hole of the sprocket to lock in position, and tighten the nut.
Torque: 30 N m (301 kgf cm, 22 ftlbf)
(i) Rotate the crankshaft clockwise 90 , and position the
crankshaft key upward.
http://vnx.su
Page 506 of 2234
A77285
Unleaded Gasoline
Timing
Marks
Leaded Gasoline
Timing
Marks
Timing
Marks
Timing
Marks
A52505
A77388
SST
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
14±147
AVENSIS REPAIR MANUAL (RM1018E)
39. INSTALL CRANKSHAFT TIMING GEAR OR SPROCKET
40. SET NO. 1 CYLINDER TO TDC/COMPRESSION
(a) Turn the camshafts with a wrench on the hexagonal lobe,and align the timing marks of the camshaft timing gear
with each timing mark located on the No. 1 and No. 2
bearing caps as shown in the illustration.
(b) Using the crankshaft pulley bolt, turn the crankshaft and position the key on the crankshaft upward.
41. INSTALL CHAIN VIBRATION DAMPER NO.1 42. INSTALL CHAIN SUB±ASSY
http://vnx.su
Page 507 of 2234
A77389
Timing MarksMark Links
Timing Mark
A77290
Hold
Stopper
A32629
A77390Seal Packing
14±148
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
(a) Align the mark links (gold or yellow colored links) with each timing mark located on the camshaft timing gears,
and install the chain.
43. INSTALL TIMING CHAIN GUIDE Torque: 9.0 N m (92 kgf cm, 80 in. lbf)
44. INSTALL CHAIN TENSIONER SLIPPER
(a) Install the chain tensioner slipper with the bolt. Torque: 19 N m (195 kgf cm, 14 ftlbf)
(b) Check that the chain tensioner slipper is hold on the cylin- der block stopper.
45. INSTALL CRANKSHAFT POSITION SENSOR PLATE NO.1
(a) Install the plate with the ºFº mark facing forward.
46. INSTALL TIMING CHAIN OR BELT COVER SUB±ASSY
NOTICE:
Remove any oil from the contact surface.
Install the chain cover within 3 minutes after applying
seal packing.
Do not start the engine within 2 hours after installing.
(a) Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing
chain cover.
(b) Apply a continuous bead (Diameter 2 mm (0.09 in.)) of seal packing as shown in the illustration.
Seal packing: Part No. 08826 ± 00080 or equivalent.
http://vnx.su
Page 508 of 2234
A77391
Seal Packing
4mm
2.5 mm
A
A
AA
3 to 4 mm
A77251
Nut
Nut
C
C C
C
B
B
B
B B
B
B
B
AC
A13759
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
14±149
AVENSIS REPAIR MANUAL (RM1018E)
(c) Apply a continuous bead (Diameter 3 to 4 mm (0.118 to
0.157 in.)) of seal packing as shown in the illustration.
Seal packing: Part No. 08826 ± 00080 or equivalent
(d) Install the timing chain cover with the 14 bolts and 2 nuts. Torque:
Bolt A 9.0 N m (92 kgfcm, 80 in. lbf)
Bolt B 21 N m (214 kgfcm, 15 ftlbf)
Bolt C 43 N m (438 kgfcm, 32 ftlbf)
Nut 9.0 N m (92 kgfcm, 80 in. lbf)
47. INSTALL V±RIBBED BELT TENSIONER ASSY
(a) Install the V±ribbed belt tensioner with the bolt and nut. Torque: 60 N m (610 kgf cm, 44 ftlbf)
NOTICE:
As the drive tensioner should be fastened together with the
timing chain cover, so be sure install it within 15 minutes
after the timing chain cover is installed.
http://vnx.su
Page 509 of 2234
A77392
Seal Packing6mm
A64641
A77393
SST
A77394
Raise
Pin Hook
Push
14±150
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
48. INSTALL OIL PAN SUB±ASSY
NOTICE:
Remove any oil from the contact surface.
Install the oil pan within 3 minutes after applying seal
packing.
Do not start the engine within 2 hours after installing.
(a) Remove any old packing (FIPG) material and be careful
not to drop any oil on the contact surface of the cylinder
block and oil pan.
(b) Apply a continuous bead (Diameter 3 mm to 4 mm (0.157 in.)) of seal packing as shown in the illustration, and install
the oil pan.
Seal packing: part No. 08826 ± 00080 or equivalent
(c) Install the oil pan with the 12 bolts and 2 nuts. Torque: 9.0 N m (92 kgf cm, 80 in. lbf)
49. INSTALL CRANKSHAFT POSITION SENSOR 50. INSTALL CRANKSHAFT PULLEY
(a) Using SST, tighten the set bolt.SST 09213±54015 (91651±60855), 09330±00021
Torque: 170 N m (1,733 kgfcm, 125 ft lbf)
51. INSTALL CHAIN TENSIONER ASSY NO.1
(a) Release the ratchet pawl, fully push in the plunger and ap- ply the hook to the pin so that the plunger is located in
position.
http://vnx.su
Page 510 of 2234
A77395
Engine
Front
A77396
Hook
PinTurn
Disconnect
A77397
Push Turn
Plunger
A77398
A
B
A
A
±
ENGINE MECHANICAL CHAIN SUB±ASSY (1AZ±FE)
14±151
AVENSIS REPAIR MANUAL (RM1018E)
(b) Install a new gasket chain tensioner with the 2 nuts.
Torque: 9.0 N m (92 kgf cm, 80 in. lbf)
NOTICE:
If the hook is released wile inserting, apply the hook again,
and insert the chain tensioner.
(c) Turn the crankshaft counterclockwise, and check that the
hook is disengaged from the plunger knock pin.
(d) Turn the crankshaft clockwise, and check that the plunger is extended.
52. INSTALL TRANSVERSE ENGINE ENGINE MOUNTING INSULATOR Torque: 52 N m (530 kgf cm, 38 ftlbf)
53. INSTALL ENGINE MOUNTING BRACKET NO.2 RH Torque:
A 52 N m (530 kgf cm, 38 ftlbf)
B 113 N m (1,152 kgf cm, 83 ft lbf)
54. INSTALL CYLINDER HEAD COVER SUB±ASSY
(a) Remove any old seal packing (FIPG) material.
http://vnx.su