Torque BMW 530i 1997 E39 Owner's Guide
[x] Cancel search | Manufacturer: BMW, Model Year: 1997, Model line: 530i, Model: BMW 530i 1997 E39Pages: 1002
Page 146 of 1002
Downloaded from www.Manualslib.com manuals search engine
. .- --
Cylinder Head Removal and Installation
Secure camshaft sprockets and impulse wheels:
Tighten mounting screws
(A) on exhaust camshaft impulse
wheel to approx.
5 Nm (44 in-lb).
Tighten mounting nuts
(8) on exhaust and intake sprocket
assemblies to approx.
5 Nm (44 in-lb).
Torque down mounting screws (A) and nuts (B) to final
specifications.
Tightening torques
sprocket assembly to camshaft
initial torque
5 Nm (44 in-lb)
Sprocket assembly
wheel to camshaft
M7 torx screws (A) 20 Nm (15 ft-lb)
M6 mounting nuts (5) 10 Nm (8 ft-lb)
- Remove crankshaft locking tool from transmission bell hous-
ing so that crankshaft is no longer secured in
TDC position.
- Remove camshaft locking tools from cylinder head.
4 Turn engine over twice in direction of rotation until cylinder 1
intake and exhaust camshaft lobes (arrows) face each other.
- Secure crankshaft in TDC position with BMW special tool 11
2 300.
4 Place BMW special tool set 11 3 240 over camshafts and
measure clearances.
CAUTION-
- If the exhaust side of the tool (A) is not flush with tlie head,
camshaft timing is incorrect Reset camshaft timing as de-
scribed in
117 Camshaft Timing Chain.
* Due to flexible sprocket design, VANOS unit tolerances
and play in the VANOS splines, when the camshaft tim-
ing is set correctly, the intake side of special tool
11 3
240 (6) may be up to 1 mm (0.04 in.) above the surface
of the cylinder head. This is normal. Reassemble en-
gine.
Othe~lise, reset camshaft timing as described in
11 7 Camshaft Timing Chain.
- Remove BMW special tool 11 6 150 from front of cylinder
head.
Page 147 of 1002
Downloaded from www.Manualslib.com manuals search engine
Cylinder Head Removal and Installation /
< Clean contact edges of cylinder head face and VANOS unit
and apply a thin coat of permanently elastic Three Bond
1209 8 or equivalent to suriaces.
CAUTION-
Check locating dowel (A) and dowel sleeve (B) at top of
cylinder head for damage or incorrect installation.
Make sure all gasket material is removed from face of
cylinder head. Clean sealing face and keep free of oil.
If any foreign material is present on the sealing surface,
the camshaft timing will be incorrect.
- Install new steel gasket to front of cylinder head and install
VANOS unit.
NOTE -
If VANOS control unit is being replaced, be sure to check and
adjust camshaft timing as described in
11 7 Camshaft Tim-
ing Chain.
- Reinstall engine lifting eye.
Tightening torque
VANOS unit to cylinder head
M6 nut
M7 nut
lo Nm (89 in-lb)
14 Nrn (10 it-lb)
- Reconnect electrical harness connectors to camshaft posi-
tion sensors and VANOS solenoid valves.
4 Insert and tighten down VANOS hydraulic piston set screws
in splined shafts on
intake and exhaust camshafts.
CAUJION-
Set screws have left hand tliread. Tighten counterclockwise.
Tightening torque
Hydraulic piston
to splined shaft 10 Nm (89 in-lb)
< Replace sealing caps inside VANOS unit with short needle
nose pliers.
Page 148 of 1002
Downloaded from www.Manualslib.com manuals search engine
. ." ".
[Cylinder Head Removal and Installation - .. - -1 -
4 Insert and secure VANOS sealing plugs (arrows) with new
sealing O-rings.
Tightening torque Sealing
plug to VANOS 50
Nm (37 ft-lb)
4 Install coolant pipe fasteners at base of cylinder head and
tighten fasteners (arrows).
NOTE-
Use new sealing O-ring on coolant pipe.
- lnstall VANOS oil line banjo bolt with new seals. Attach oil
line to VANOS unit.
Tightening torque Oil line to VANOS unit
(banjo bolt) 32
Nm (24 ft-ib)
- Remove adjustable timing chain tensioner tool and reinstall
chain tensioner.
Tightening torque Primary chain tensioner cylinder to
cylinder head 70
Nm
(52 fi-ib)
- Remove flywheel locking tool from transmission bell housing.
Replace special tool bore sealing plug.
- Remove camshaft locking tools from cylinder head
4 lnstall intake camshaft cover and cylinder head cover.
0 Check for correct seating of half-moon seals (A) in back of
cylinder head cover.
Use a small amount of Three Bond
1209 8 or equivalent
sealant at corners
(B) of half-moon cutouts.
Seat gasket and seal corners in front of cylinder head at
VANOS unit.
Tightening torque
Cylinder head cover to cylinder head
(M6) 10 Nm (89 in-lb)
Page 149 of 1002
Downloaded from www.Manualslib.com manuals search engine
Cylinder Head Removal and Installation
- Install exhaust manifolds using new gaskets and nuts. Coat
manifold studs with copper paste prior to installing nuts.
Tightening torque Exhaust
maniiold to cylinder head (M7)
20 Nm (15 ft-lb)
- Install electrical harness connectors for oil pressure sender
and coolant temperature sensor before installing
intalte man-
ifold.
7 Install intake manifold:
1. Manifold mounting nuts: tighten to 15 Nm (1 1 ft-lb)
2. Fuel pipe bracltet
3. Fuel pipe bracltet
4. Vacuum pump bracltet
5. Manifold mounting bracltet
6.
Tank venting valve bracltet
7. Mounting bracket to manifold bolt (M6)
8. Mounting bracket to cylinder block nut (MIO), tighten to
47 Nm (33 fi-lb)
Intake manifold installation is reverse of removal, noting the
following:
* Use new fuel injector seals.
Carefully
check intake manifold gasket and replace if nec-
essary.
Inspect O-ring seal between mass air flow sensor and air
filter housing. To facilitate reassembly, coat seal with
acid-
free grease.
Use new fuel injector seals.
Carefully check intake manifold gasket and replace if
necessary.
CA UTIOPI-
When reattaching throttle assembly harness connector, con-
nector is fully tightened when arrows on connector
andplug
line up.
Tightening torque
lntalte manifold to cylinder
head (M7)
15 Nm (1 1 it-lb) ~ ~- Mounting bracket to cylinder bloclt (M10) 47 Nm (33 ft-lb)
Mounting bracket to intake manifold (MI?) 10 Nm (89 in-lb)
Page 150 of 1002
Downloaded from www.Manualslib.com manuals search engine
11 3-56
I Cvlinder Head Removal and Installation
- Installation of the remaining parts is reverse or removal, not-
ing the following:
- Refill cooling system as described in 170 Radiator and
Cooling System.
Change engine oil and filter as described in
020 Mainte-
nance.
If necessary, adjust accelerator cable.
a Reconnect battery.
CAUTION- To prevent damaging the engine electronic systems, installall
ground wire previously removed, including the ground wires
for the
ionition coils.
Tightening torque Coolant drain
pluq to cylinder bloclc 25 Nm (1 8 ft-lb)
Radiator cooling fan to coolant pump 40 Nm (30 ft-lb) -
Radiator drain screw to radiator 2.5
Nm (22 in-lb)
spark plug to cylinder head 25
Nm (1 8 ft-lb)
CYLINDER MEAD REMOVAL AND
INSTALLATION (M62 ENGINE)
This procedure covers cylinder head removal and installation
for the
M62 V-8 engine. Procedures forthe M62 TU VANOS
engine are not covered in this manual.
Intake manifold, left cylinder head, and right cylinder head re-
moval and installation are written as separate procedures.
The intake manifold must be removed before the cylinder
heads can be removed.
WARNING
-
Due to risk of personal injuv be sure the engine is cold be-
fore beginning the removal procedure.
Cylinder head removal and installation requires multiple spe-
cial service tools. Read the entire procedure before beginning
the repair.
Intake manifold, removal and installation,
M62 engine
- Disconnect negative (-) battery cable.
CAUTION- Prior to disconnecting the
batterj read the baitery discon-
nection cautions
in 001 General Cautions and Warnings.
Page 160 of 1002
Downloaded from www.Manualslib.com manuals search engine
. .- --
I Cylinder Head Removal and Installation
- Evaluate cylinder head as described in 116 Cylinder head
and valvetrain.
Left cylinder head, installing, M62 engine
- Clean cylinder head and block sealing surfaces of gasket
debris, making sure no debris drops into coolant or oil pas-
sages.
- Clean cylinder head bolt holes and check condition of
threads.
< Check cylinder head locator sleeves (arrows) for damage.
If the cylinder head has been machined, a special
0.3 mm
thicker gasket should be installed. The thicker gasket is avail-
able through an authorized
BMW dealer and should be
marked accordingly.
- Place new cylinder head gasket over locating sleeve on
block.
The word
"OBEN" or "TOP" (arrow) printed on the gasket,
must face up.
Set lefl side cylinder head in position on cylinder block while
pressing oil separator outward.
CAUJION-
Male sure the crankshaft, which had been rotated approxi-
mately
45" opposite the direction of engine rotation from
TDC, is still in thatposition before installing the cylinder head.
All pistons must be out of
TDCposition to prevent valvelpis-
ton contact.
- Install new cylinder head bolts and washers finger tight. Be
sure not to remove coating from new cylinder head bolts.
4 Tighten cylinder head bolts in correct sequence (1-10) to
stage
1 torque values.
Page 161 of 1002
Downloaded from www.Manualslib.com manuals search engine
1 13-67
Cylinder Head Removal and lnstaKI --
< Using a torque angle gauge, tighten cylinder head bolts to
specified torque angle in stages
2 and 3.
Tightening torques
Stage I 30 Nrn (22 ft-lb)
Stage II +80°
Stage Ill +80°
4 If possible, confirm oil return pipe at bottom of separator is
correctly seated
(arrow).
NOTE-
Photo shows lower timing case cover removed.
< Remove old O-ring and install new O-ring (arrow) in angle
section.
- Press oil separator into angle section and install guide rail re-
taining screws.
4 Tighten allen screw (arrow) just until it makes contact with
crankcase vent tube angle section without play.
NOTE-
Allen screw secures crankcase vent tube in place. Do not
torque down.
Page 163 of 1002
Downloaded from www.Manualslib.com manuals search engine
11 3-69
Cylinder Head Removal and Installation
4 Lock crankshaft in TDC position with BMW special tool 11 3
200 (arrow).
NOTE-
Boss for special tool 11 3 200 located at rear of engine oil
pan.
4 Working at left cylinder head (driver's side) fit primary sprock-
et and chain to camshaft flange, centering threaded bores.
Insert bolts (arrows) and hand tighten.
?-I I 4 Install BMW special tool 11 3 390 into right timing case cover.
NOTE-
BMW special tool 00 9 250 is a flexible shaft torque wrench.
I - Tighten sprocket retaining bolts in the following order:
All bolts on left cylinder head exhaust camshaft
3 accessible bolts on right cylinder head exhaust camshaft
All bolts on left cylinder head
intake camshaft
3 accessible bolts on right cylinder head intake camshaft r"".."..7n
Tightening torques
Sprocltet bolts to camshait flange
15 Nm (11 ft-lb)
- Remove camshaft and crankshaft locking tools from engine.
- Using crankshaft center bolt, turn engine clockwise to access
remaining sprocket retaining bolts of right cylinder head cam-
shafts. Tighten remaining bolts.
Tightening torques Sprocket bolts to camshaft flange 15 Nm
(11 ft-lb)
Page 164 of 1002
Downloaded from www.Manualslib.com manuals search engine
11 3-70
Cylinder Head Removal and Installation
- Remove adjustable timing chain tensioner tool from timing
case cover and install primary timing chain tensioner with
new sealing washer.
Tightening torque Chain tensioner cylinder to timing cover
65 Nm (48 ft-lb)
4 Install oil supply lines and mounting nuts (arrows) to both
heads.
Tightening torque
Oil supply line nuts 10 Nm (7.5 ft-lb)
- Remove old gasket from lefl timing cover, and clean gasket
surface.
4 Apply Three Bond 1209 8 sealant to joint between cylinder
head and timing cover (arrows).
Using a new gasket, install lefl timing cover with lower inner
fastener inserted in cover (arrow). Position cover in place
and tighten cover fasteners finger tight.
NOTE-
It is not possible to install lower inner fastener after cover is
in place.
Page 165 of 1002
Downloaded from www.Manualslib.com manuals search engine
. ." . .
I - Cylinder Head Removal - and instard --
4 Remove left cylinder head cover gasket and install spacing
tool (BMW
11 1 412) in place of gasket.
- lnstall lefl cylinder head cover fasteners and tighten uniformly
in
'I2 turn steps.
Tightening torque Cylinder head cover nuts
10 Nrn (7.5 it-lb)
- Tighten left upper timing cover retaining bolts in two passes.
Tightening torque
Timing chain cover to head 10 Nrn (7.5 ft-lb)
- Remove lefl cylinder head cover and BMW special tool 11 4
412.
4 Reinstall cylinder head covers to left and right cylinder heads
using new gaskets.
Check for correct seating of half-moon seals
(A) in back of
cylinder head cover.
Use a small amount of Three Bond 1209
03 or equivalent
sealer at corners
(6) of half-moon cutouts.
- Install left cylinder head cover fasteners and tighten uniformly
in
'I? turn steps.
- Install exhaust manifolds using new gaskets and fasteners.
See
180 Exhaust System.