air conditioning CHRYSLER CARAVAN 2002 Service Manual

CHRYSLER CARAVAN 2002 Service Manual CARAVAN 2002 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56864/w960_56864-0.png CHRYSLER CARAVAN 2002 Service Manual

Page 2351 of 2399

CHRYSLER CARAVAN 2002  Service Manual INSTALLATION
INSTALLATION - REAR HEATER LINES
(1) Install line into underbody straps.
(2) Install line into front hose and install hose
clamp.
(3) Connect quick fitting at rear of line.
(4) Lower vehi

Page 2354 of 2399

CHRYSLER CARAVAN 2002  Service Manual FUEL DOSING PUMP
DESCRIPTION
The dosing pump is a combined delivery, dosing
and shut-off system for the fuel supply to the heater
from the vehicles fuel tank.
OPERATION
The dosing pump is an electrica

Page 2355 of 2399

CHRYSLER CARAVAN 2002  Service Manual (4) Connect the electrical connector to the fuel
pump by depressing the integral spring and pushing
the connector towards the dosing pump. Pull the con-
nector towards the heater to verify the install

Page 2357 of 2399

CHRYSLER CARAVAN 2002  Service Manual (7) With the DRBIIItin Cabin Heater, select Sys-
tem Tests and Dosing Pump Prime. Allow the Dosing
Pump to run for the full 45 second cycle time. When
the 45 second cycle is complete, press Page Back

Page 2358 of 2399

CHRYSLER CARAVAN 2002  Service Manual (12) Remove the heater unit support device from
under the vehicle.
(13) Lower vehicle from lift.
(14) Refill cooling system(Refer to 7 - COOLING -
STANDARD PROCEDURE).
(15) Verify function of the cabi

Page 2390 of 2399

CHRYSLER CARAVAN 2002  Service Manual EXHAUST GAS RECIRCULATION
TABLE OF CONTENTS
page page
EXHAUST GAS RECIRCULATION
DESCRIPTION..........................3
OPERATION............................3
VA LV E
DESCRIPTION.......................
Page:   < prev 1-10 ... 61-70 71-80 81-90 91-100 101-110