oil level CHRYSLER CARAVAN 2002 Workshop Manual

CHRYSLER CARAVAN 2002 Workshop Manual CARAVAN 2002 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56864/w960_56864-0.png CHRYSLER CARAVAN 2002 Workshop Manual

Page 1343 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (3) Clean oil screen and pick-up tube in clean sol-
vent.
INSPECTION
(1) Inspect oil drain plug and plug hole for
stripped or damaged threads and repair as necessary.
Install a new drain plug gasket.

Page 1344 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual INSTALLATION
(1) Clean relief valve, spring and bore.
NOTE: Lubricate relief valve with clean engine oil
before installing.
(2) Install relief valve and spring into housing.
(3) Install new retainer c

Page 1359 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (18) Install oil pump pick-up tube with new
O-ring. Tighten attaching bolt to 28 N´m (250 in.
lbs.).
(19) Install oil pan. (Refer to 9 - ENGINE/LUBRI-
CATION/OIL PAN - INSTALLATION)
(20) Install inne

Page 1368 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual INSTALLATION
INSTALLATION - 2.5L TURBO DIESEL ENGINE
(1) Reassembly engine and transmission assembly
and install on engine cradle.
(2) Position engine and cradle assembly under
vehicle.
(3) Slowly low

Page 1394 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (5) Install front engine cover (Refer to 9 -
ENGINE/ENGINE BLOCK/ENGINE COVER -
INSTALLATION).
(6) Install rear main bearing support in engine
block.Be sure to align oil hole in rear main
bearing supp

Page 1407 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual CRANKSHAFT OIL SEAL -
REAR
REMOVAL
This must be done with either the engine or trans-
mission removed from vehicle.
(1) Remove flywheel assembly.
(2) Pry out old crankshaft oil seal.
INSTALLATION
(1)

Page 1409 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (3) Install oil pump retaining bolts (Fig. 71).
Torque bolts to 10.8N´m.
(4) Install crankshaft sprocket (Fig. 71). Torque
bolts to 10.8N´m.
(5) Install front engine cover (Refer to 9 -
ENGINE/ENGIN

Page 1410 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (4) Lower vehicle.
(5) Start engine and check for leaks.
(6) Check and adjust oil level as necessary.
OIL PRESSURE RELIEF VALVE
DESCRIPTION
The oil pressure relief valve mounts in the front of
the eng

Page 1412 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (2) Install oil cooler, retaining bolt, and stud (Fig.
79). Torque retaining bolt to 47.1N´m and stud to
50N´m.
(3) Connect coolant hoses at cooler (Fig. 79).
(4) Install oil filter housing and reta

Page 1413 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual OIL JET
DESCRIPTION
There are four oil jets installed in the engine block.
These oil jets are used to cool and lubricate the pis-
ton assemblies (Fig. 82).
REMOVAL
CAUTION: Use caution when removing a