heater CHRYSLER VOYAGER 2004 Service Manual

CHRYSLER VOYAGER 2004 Service Manual VOYAGER 2004 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56870/w960_56870-0.png CHRYSLER VOYAGER 2004 Service Manual

Page 2465 of 2585

CHRYSLER VOYAGER 2004  Service Manual tion that meets SAE Standard J2210 to the refriger-
ant system.
(2) Attach a clamp-on thermocouple to the liquid
line. The thermocouple must be placed as close to the
A/C pressure transducer as possib

Page 2468 of 2585

CHRYSLER VOYAGER 2004  Service Manual CHARGING PROCEDURE
CAUTION: A small amount of refrigerant oil is
removed from the A/C system each time the refrig-
erant system is recovered and evacuated. Before
charging the A/C system, you MUST rep

Page 2476 of 2585

CHRYSLER VOYAGER 2004  Service Manual is fitted to the evaporator inlet and outlet tubes
where they exit the HVAC housing.
(2) Assemble the HVAC housing (Refer to 24 -
HEATING & AIR CONDITIONING/DISTRIBUTION/
HVAC HOUSING - ASSEMBLY).
(3)

Page 2478 of 2585

CHRYSLER VOYAGER 2004  Service Manual (8) Lubricate new rubber O-ring seals with clean
refrigerant oil and install them on the front liquid
line rear section and suction line fittings for the
expansion valve.
(9) Connect the liquid line a

Page 2479 of 2585

CHRYSLER VOYAGER 2004  Service Manual (9) Remove the heater core tubes and sealing plate
as a unit from beneath the instrument panel.
(10) Use absorbent toweling to clean up any
engine coolant spills from the preceding operation.
REMOVAL

Page 2480 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
INSTALLATION - HEATER CORE TUBES
(1) Remove the plugs or tape from both heater core
tube fittings and both heater core ports.
(2) Position the heater core tubes and sealing plate
as a uni

Page 2481 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
WARNING: REFER TO THE APPLICABLE WARN-
INGS AND CAUTIONS FOR THIS SYSTEM BEFORE
PERFORMING THE FOLLOWING OPERATION (Refer
to 24 - HEATING & AIR CONDITIONING/PLUMBING -
WARNING).(1) Using

Page 2482 of 2585

CHRYSLER VOYAGER 2004  Service Manual (1) Drain the engine cooling system (Refer to 7 -
COOLING - STANDARD PROCEDURE - COOLING
SYSTEM DRAIN).
(2) Using spring tension clamp pliers, compress
and slide the clamps off of each end of the hose

Page 2484 of 2585

CHRYSLER VOYAGER 2004  Service Manual REAR SECTION
(1) Recover the refrigerant from the refrigerant
system (Refer to 24 - HEATING & AIR CONDITION-
ING/PLUMBING - FRONT/REFRIGERANT - STAN-
DARD PROCEDURE - REFRIGERANT
RECOVERY).
(2) Discon

Page 2486 of 2585

CHRYSLER VOYAGER 2004  Service Manual (21) Install a new tie strap just forward of the con-
nections between the underbody plumbing and the
engine compartment plumbing for the rear heater
and air conditioner.
(22) Lower the vehicle.
(23)