engine oil CHRYSLER VOYAGER 2004 Service Manual
[x] Cancel search | Manufacturer: CHRYSLER, Model Year: 2004, Model line: VOYAGER, Model: CHRYSLER VOYAGER 2004Pages: 2585, PDF Size: 62.54 MB
Page 2551 of 2585

COMPRESSOR CLUTCH COIL -
DIAGNOSIS AND TESTING, A/C..........24-15
COMPRESSOR CLUTCH RELAY -
DESCRIPTION, A/C...................24-19
COMPRESSOR CLUTCH RELAY -
INSTALLATION, A/C...................24-20
COMPRESSOR CLUTCH RELAY -
OPERATION, A/C.....................24-19
COMPRESSOR CLUTCH RELAY -
REMOVAL, A/C......................24-20
COMPRESSOR CLUTCH/COIL -
DESCRIPTION, A/C...................24-15
COMPRESSOR CLUTCH/COIL -
INSPECTION, A/C.....................24-17
COMPRESSOR CLUTCH/COIL -
INSTALLATION, A/C...................24-17
COMPRESSOR CLUTCH/COIL -
OPERATION, A/C.....................24-15
COMPRESSOR CLUTCH/COIL -
REMOVAL, A/C......................24-16
COMPRESSOR MOUNTING BRACKET -
2.4L ENGINE - INSTALLATION, A/C.......24-76
COMPRESSOR MOUNTING BRACKET -
2.4L ENGINE - REMOVAL, A/C..........24-75
COMPRESSOR NOISE DIAGNOSIS -
DIAGNOSIS AND TESTING.............24-74
COMPUTER - DESCRIPTION, COMPASS/
MINI-TRIP..........................8M-9
COMPUTER - DIAGNOSIS AND TESTING,
COMPASS MINI-TRIP.................8M-10
COMPUTER - INSTALLATION, COMPASS/
MINI-TRIP.........................8M-10
COMPUTER - OPERATION, COMPASS/
MINI-TRIP............................8M-9
COMPUTER - REMOVAL, COMPASS/
MINI-TRIP.........................8M-10
CONCENTRATION TESTING - DIAGNOSIS
AND TESTING, COOLANT...............7-19
CONDENSER - DESCRIPTION, A/C.......24-76
CONDENSER - INSTALLATION, A/C.......24-78
CONDENSER - OPERATION, A/C.........24-76
CONDENSER - REMOVAL, A/C..........24-77
CONDITION CHECK, STANDARD
PROCEDURE - FLUID LEVEL....21-201,21s-102
CONDITIONER - DESCRIPTION, HEATER
AND AIR ............................24-1
CONDITIONER - OPERATION, HEATER
AND AIR ............................24-4
CONNECTING ROD - DESCRIPTION,
PISTON........................9-116,9-42
CONNECTING ROD - INSTALLATION,
PISTON.............................9-44
CONNECTING ROD - REMOVAL, PISTON . . . 9-43
CONNECTING ROD BEARING
CLEARANCE - STANDARD
PROCEDURE, MEASURING.............9-120
CONNECTING ROD, FITTING.............9-45
CONNECTING RODS - STANDARD
PROCEDURE, FITTING.................9-116
CONNECTOR - DESCRIPTION, DATA LINK . . 8E-6
CONNECTOR - INSTALLATION.......8W-01-11
CONNECTOR - OPERATION, DATA LINK....8E-7
CONNECTOR - REMOVAL...........8W-01-11
CONNECTOR, GROUND AND SPLICE
INFORMATION - DESCRIPTION........8W-01-7
CONNECTOR/GROUND/SPLICE LOCATION
- DESCRIPTION....................8W-91-1
CONSOLE - DESCRIPTION, OVERHEAD....8M-1
CONSOLE - DIAGNOSIS AND TESTING,
OVERHEAD..........................8M-2
CONSOLE - INSTALLATION, LOWER......23-69
CONSOLE - OPERATION, OVERHEAD......8M-2
CONSOLE - REMOVAL, LOWER..........23-69
CONSOLE - REMOVAL, OVERHEAD.......8M-6
CONSOLE LAMP - INSTALLATION,
CENTER............................8L-21
CONSOLE LAMP - REMOVAL, CENTER....8L-21
CONSOLE LAMP SWITCH -
INSTALLATION, CENTER...............8L-21
CONSOLE LAMP SWITCH - REMOVAL,
CENTER............................8L-21
CONSOLE, SPECIAL TOOLS - OVERHEAD
. . 8M-6
CONSOLE TRAY - BRACKET ASSEMBLY -
INSTALLATION, FLOOR
................23-83
CONSOLE TRAY - BRACKET ASSEMBLY -
REMOVAL, FLOOR
....................23-83
CONSOLE TRAY - INSTALLATION, FLOOR
. . 23-83
CONSOLE TRAY - REMOVAL, FLOOR
.....23-83CONTAINER - DESCRIPTION, COOLANT
RECOVERY..........................7-19
CONTAINER - INSTALLATION, COOLANT
RECOVERY..........................7-20
CONTAINER - OPERATION, COOLANT
RECOVERY..........................7-19
CONTAINER - REMOVAL, COOLANT
RECOVERY..........................7-20
CONTAMINATION - DIAGNOSIS AND
TESTING, BRAKE FLUID...........5-32,5s-31
CONTINUITY - STANDARD PROCEDURE,
TESTING.........................8W-01-9
CONTROL (4 SPEED EATX ONLY) -
OPERATION, INTERACTIVE SPEED........8P-2
CONTROL ARM - DESCRIPTION, LOWER . . . 2-12
CONTROL ARM - INSPECTION, LOWER....2-14
CONTROL ARM - INSTALLATION, LOWER . . 2-16
CONTROL ARM - OPERATION, LOWER.....2-12
CONTROL ARM - REMOVAL, LOWER......2-12
CONTROL ARM (REAR BUSHING -
HYDRO) - ASSEMBLY, LOWER...........2-14
CONTROL ARM (REAR BUSHING -
HYDRO) - DISASSEMBLY, LOWER........2-14
CONTROL ARM (REAR BUSHING -
STANDARD) - ASSEMBLY, LOWER........2-14
CONTROL ARM (REAR BUSHING -
STANDARD) - DISASSEMBLY, LOWER.....2-13
CONTROL (ATC) - INSTALLATION,
AUTOMATIC TEMPERATURE............24-29
CONTROL (ATC) - REMOVAL,
AUTOMATIC TEMPERATURE............24-28
CONTROL CABLE - INSTALLATION,
THROTTLE..........................14-36
CONTROL CABLE - REMOVAL,
THROTTLE..........................14-35
CONTROL CALIBRATION - STANDARD
PROCEDURE, A/C-HEATER.............24-20
CONTROL CIRCUIT TEST - DIAGNOSIS
AND TESTING..................8F-30,8F-32
CONTROL INFORMATION LABEL -
DESCRIPTION, VEHICLE EMISSION.......25-1
CONTROL MODULE - DESCRIPTION,
BODY...............................8s-1
CONTROL MODULE - DESCRIPTION,
BODY...............................8E-3
CONTROL MODULE - DESCRIPTION,
FRONT..............................8E-7
CONTROL MODULE - DESCRIPTION,
POWER LIFTGATE....................8E-10
CONTROL MODULE - DESCRIPTION,
SLIDING DOOR......................8E-19
CONTROL MODULE - DESCRIPTION,
TRANSMISSION......................8E-20
CONTROL MODULE - DIAGNOSIS AND
TESTING, FRONT......................8E-7
CONTROL MODULE - INSTALLATION,
BODY...............................8s-3
CONTROL MODULE - INSTALLATION,
BODY...............................8E-5
CONTROL MODULE - INSTALLATION,
FRONT..............................8E-8
CONTROL MODULE - INSTALLATION,
POWER LIFTGATE....................8E-11
CONTROL MODULE - INSTALLATION,
SLIDING DOOR......................8E-20
CONTROL MODULE - OPERATION, BODY . . . 8s-1
CONTROL MODULE - OPERATION, BODY . . . 8E-3
CONTROL MODULE - OPERATION,
FRONT..............................8E-7
CONTROL MODULE - OPERATION,
POWER LIFTGATE....................8E-11
CONTROL MODULE - OPERATION,
SLIDING DOOR......................8E-19
CONTROL MODULE - OPERATION,
TRANSMISSION......................8E-20
CONTROL MODULE - REMOVAL, BODY....8s-3
CONTROL MODULE - REMOVAL, BODY....8E-4
CONTROL MODULE - REMOVAL, FRONT . . . 8E-8
CONTROL MODULE - REMOVAL, POWER
LIFTGATE
...........................8E-11
CONTROL MODULE - REMOVAL,
SLIDING DOOR
......................8E-19
CONTROL MOTOR - DESCRIPTION, IDLE
AIR
...............................14-28
CONTROL MOTOR - INSTALLATION, IDLE
AIR
...............................14-29
CONTROL MOTOR - OPERATION, IDLE
AIR
...............................14-28CONTROL MOTOR - REMOVAL, IDLE AIR . . 14-29
CONTROL (MTC) - INSTALLATION,
MANUAL TEMPERATURE...............24-29
CONTROL (MTC) - REMOVAL, MANUAL
TEMPERATURE......................24-29
CONTROL RELAY - DESCRIPTION,
TRANSMISSION..............21-247,21s-150
CONTROL RELAY - OPERATION,
TRANSMISSION..............21-248,21s-150
CONTROL SWITCH - DIAGNOSIS AND
TESTING, TRACTION...................5-82
CONTROL SYSTEM - DESCRIPTION,
TRACTION...........................5-76
CONTROL SYSTEM - OPERATION,
AUTOMATIC TEMPERATURE...........24-112
CONTROL SYSTEM - OPERATION,
EVAPORATION.......................25-10
CONTROL SYSTEM - OPERATION,
MANUAL TEMPERATURE..............24-112
CONTROL SYSTEM - OPERATION,
TRACTION...........................5-77
CONTROLLER - DESCRIPTION,
OCCUPANT RESTRAINT................8O-8
CONTROLLER - INSTALLATION,
OCCUPANT RESTRAINT................8O-8
CONTROLLER - INSTALLATION, SBEC....8E-17
CONTROLLER - OPERATION, 8-VOLT
SUPPLY - PCM OUTPUT - SBEC.........8E-15
CONTROLLER - OPERATION, OCCUPANT
RESTRAINT..........................8O-8
CONTROLLER - REMOVAL, NGC.........8E-17
CONTROLLER - REMOVAL, OCCUPANT
RESTRAINT...........................8O-8
CONTROLLER - REMOVAL, SBEC........8E-16
CONTROLLER ANTILOCK BRAKE -
DESCRIPTION........................8E-5
CONTROLLER ANTILOCK BRAKE -
INSTALLATION........................8E-6
CONTROLLER ANTILOCK BRAKE -
OPERATION..........................8E-5
CONTROLLER ANTILOCK BRAKE -
REMOVAL...........................8E-6
CONVENTIONAL BATTERY CHARGING -
STANDARD PROCEDURE...............8F-11
CONVERTER - DESCRIPTION, CATALYTIC . . . 11-4
CONVERTER - DESCRIPTION, TORQUE . . 21-242,
21s-144
CONVERTER - INSPECTION, CATALYTIC....11-5
CONVERTER - INSTALLATION, CATALYTIC . . 11-6
CONVERTER - INSTALLATION, TORQUE . . 21-247,
21s-149
CONVERTER - OPERATION, CATALYTIC....11-4
CONVERTER - OPERATION, TORQUE....21-245,
21s-148
CONVERTER - REMOVAL, CATALYTIC......11-5
CONVERTER - REMOVAL, TORQUE.....21-247,
21s-149
CONVERTER HOUSING FLUID LEAKAGE -
DIAGNOSIS AND TESTING, TORQUE....21-123,
21s-31
COOL DOWN TEST - DIAGNOSIS AND
TESTING, A/C........................24-6
COOLANT - DESCRIPTION, ENGINE.......7-19
COOLANT - DESCRIPTION, ENGINE........0-3
COOLANT - STANDARD PROCEDURE,
ADDING ADDITIONAL...................7-5
COOLANT CONCENTRATION TESTING -
DIAGNOSIS AND TESTING..............7-19
COOLANT LEVEL CHECK - STANDARD
PROCEDURE..........................7-5
COOLANT RECOVERY CONTAINER -
DESCRIPTION........................7-19
COOLANT RECOVERY CONTAINER -
INSTALLATION........................7-20
COOLANT RECOVERY CONTAINER -
OPERATION..........................7-19
COOLANT RECOVERY CONTAINER -
REMOVAL...........................7-20
COOLANT RECOVERY SYSTEM -
DIAGNOSIS AND TESTING
..............7-20
COOLANT SERVICE - STANDARD
PROCEDURE
.........................7-19
COOLANT TEMPERATURE SENSOR -
2.4L - DESCRIPTION, ENGINE
............7-21
COOLANT TEMPERATURE SENSOR -
2.4L - INSTALLATION, ENGINE
...........7-21
COOLANT TEMPERATURE SENSOR -
2.4L - REMOVAL, ENGINE
...............7-21
8 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2552 of 2585

COOLANT TEMPERATURE SENSOR -
3.3/3.8L - DESCRIPTION, ENGINE.........7-21
COOLANT TEMPERATURE SENSOR -
3.3/3.8L - INSTALLATION, ENGINE........7-22
COOLANT TEMPERATURE SENSOR -
3.3/3.8L - REMOVAL, ENGINE............7-21
COOLANT THERMOSTAT - 2.4L -
INSTALLATION, ENGINE................7-23
COOLANT THERMOSTAT - 2.4L -
REMOVAL, ENGINE....................7-23
COOLANT THERMOSTAT - 3.3/3.8L -
INSTALLATION, ENGINE................7-24
COOLANT THERMOSTAT - 3.3/3.8L -
REMOVAL, ENGINE....................7-23
COOLANT THERMOSTAT - DESCRIPTION,
ENGINE.............................7-22
COOLANT THERMOSTAT - DIAGNOSIS
AND TESTING, ENGINE.................7-23
COOLANT THERMOSTAT - OPERATION,
ENGINE.............................7-22
COOLER - DESCRIPTION, FLUID.........19-44
COOLER - DESCRIPTION,
TRANSMISSION OIL...................7-37
COOLER - INSPECTION, TRANSMISSION
OIL ................................7-37
COOLER - INSTALLATION, FLUID........19-45
COOLER - INSTALLATION,
TRANSMISSION OIL...................7-37
COOLER & LINES - DESCRIPTION, OIL . . . 9-138
COOLER & LINES - INSTALLATION, OIL . . . 9-138
COOLER & LINES - OPERATION, OIL.....9-138
COOLER & LINES - REMOVAL, OIL........9-138
COOLER - OPERATION, FLUID..........19-44
COOLER - REMOVAL, FLUID............19-44
COOLER - REMOVAL, TRANSMISSION
OIL ................................7-37
COOLER LINES - INSTALLATION,
TRANSMISSION OIL...................7-38
COOLER LINES - REMOVAL,
TRANSMISSION OIL...................7-38
COOLING SYSTEM - DESCRIPTION........7-1
COOLING SYSTEM - DIAGNOSIS AND
TESTING, ENGINE.....................7-14
COOLING SYSTEM - OPERATION..........7-2
COOLING SYSTEM AERATION -
DIAGNOSIS AND TESTING...............7-3
COOLING SYSTEM DEAERATION -
DIAGNOSIS AND TESTING...............7-4
COOLING SYSTEM DRAINING -
STANDARD PROCEDURE.................7-4
COOLING SYSTEM FILLING - STANDARD
PROCEDURE..........................7-5
COOLING SYSTEM FLOW CHECK -
DIAGNOSIS AND TESTING...............7-3
COOLING SYSTEM LEAK TEST -
DIAGNOSIS AND TESTING...............7-2
COOLING SYSTEM PRESSURE CAP
TESTING - DIAGNOSIS AND TESTING......7-27
COOLING SYSTEM REQUIREMENTS -
DESCRIPTION, ENGINE.................24-1
COOLING SYSTEM, SPECIAL TOOLS.......7-6
COOLING SYSTEM, WARNING - ENGINE . . 24-65
CORE - DESCRIPTION, HEATER . . . 24-101,24-83
CORE - DESCRIPTION, SERVICE PORT
VALVE .............................24-94
CORE - INSTALLATION, HEATER . . . 24-103,24-85
CORE - INSTALLATION, SERVICE PORT
VALVE .............................24-94
CORE - OPERATION, HEATER.....24-101,24-83
CORE - REMOVAL, HEATER......24-102,24-84
CORE - REMOVAL, SERVICE PORT
VALVE .............................24-94
CORE AND OIL GALLERY PLUGS -
STANDARD PROCEDURE, ENGINE....9-10,9-86
CORE FILLING - STANDARD
PROCEDURE, REAR HEATER...........24-101
CORE TUBES - INSTALLATION, HEATER . . . 24-85
CORE TUBES - REMOVAL, HEATER.......24-83
COUPLER - DESCRIPTION, VISCOUS......3-41
COUPLER - OPERATION, VISCOUS........3-42
COURTESY LAMP - INSTALLATION.......8L-21
COURTESY LAMP - REMOVAL..........8L-21
COVER - CLEANING, CYLINDER HEAD
.....9-31
COVER - DESCRIPTION, SHIFT
.........21-113
COVER - DESCRIPTION, WHEEL
.........22-19
COVER - INSPECTION, CYLINDER HEAD
. . . 9-31
COVER - INSTALLATION, BENCH SEAT
BACK
.............................23-103COVER - INSTALLATION, CYLINDER
HEAD...............................9-31
COVER - INSTALLATION, DRIVER
AIRBAG TRIM........................8O-7
COVER - INSTALLATION, FRONT SEAT
CUSHION SIDE......................23-94
COVER - INSTALLATION, FRONT SEAT
TRACK - REAR......................23-96
COVER - INSTALLATION, FRONT
SEATBACK..........................23-93
COVER - INSTALLATION, INSTRUMENT
PANEL TOP.........................23-69
COVER - INSTALLATION, LOWER
STEERING COLUMN..................23-70
COVER - INSTALLATION, OVER
STEERING COLUMN..................23-70
COVER - INSTALLATION, TIMING CHAIN . . 9-155
COVER - INSTALLATION, WHEEL........22-19
COVER - LEFT - INSTALLATION,
CYLINDER HEAD.....................9-103
COVER - LEFT - REMOVAL, CYLINDER
HEAD..............................9-103
COVER - QUAD BUCKET, 50/50 SPLIT,
BENCH - INSTALLATION, SEAT
CUSHION..........................23-100
COVER - QUAD BUCKET, 50/50 SPLIT,
BENCH - REMOVAL, SEAT CUSHION.....23-100
COVER - REMOVAL, BENCH SEAT BACK . . 23-103
COVER - REMOVAL, CYLINDER HEAD.....9-31
COVER - REMOVAL, DRIVER AIRBAG
TRIM...............................8O-7
COVER - REMOVAL, FRONT SEAT
CUSHION SIDE........................23-94
COVER - REMOVAL, FRONT SEAT TRACK
- REAR............................23-96
COVER - REMOVAL, FRONT SEATBACK . . . 23-93
COVER - REMOVAL, INSTRUMENT
PANEL TOP.........................23-68
COVER - REMOVAL, LOWER STEERING
COLUMN...........................23-70
COVER - REMOVAL, OVER STEERING
COLUMN...........................23-70
COVER - REMOVAL, TIMING CHAIN......9-153
COVER - REMOVAL, WHEEL............22-19
COVER - RIGHT - INSTALLATION,
CYLINDER HEAD.....................9-103
COVER - RIGHT - REMOVAL, CYLINDER
HEAD..............................9-102
COVER AND DISC RUNOUT - DIAGNOSIS
AND TESTING, CLUTCH.................6-6
COVER BACKING PLATE -
INSTALLATION, STEERING COLUMN......23-70
COVER BACKING PLATE - REMOVAL,
STEERING COLUMN..................23-70
COVER BALL BEARING - INSTALLATION,
END ...............................21-10
COVER BALL BEARING - REMOVAL, END . . . 21-9
COVER O-RING - INSTALLATION, REAR . . . 21-20
COVER O-RING - REMOVAL, REAR.......21-19
COVER SEAL - INSTALLATION, END......21-11
COVER SEAL - INSTALLATION, INPUT
SHAFT.............................21-14
COVER SEAL - REMOVAL, END..........21-11
COVER SEAL - REMOVAL, INPUT SHAFT . . 21-13
COVER-LEFT - INSTALLATION, CYLINDER
HEAD..............................9s-20
COVER-LEFT - REMOVAL, CYLINDER
HEAD..............................9s-20
COVER-RIGHT - INSTALLATION,
CYLINDER HEAD.....................9s-19
COVER-RIGHT - REMOVAL, CYLINDER
HEAD..............................9s-19
COVER(S) - DESCRIPTION, CYLINDER
HEAD.........................9-102,9s-19
COVER(S) - INSTALLATION, TIMING
BELT ...............................9-62
COVERS - QUAD BUCKET, 50/50 SPLIT,
BENCH - INSTALLATION, SEAT BACK
HINGE............................23-101
COVERS - QUAD BUCKET, 50/50 SPLIT,
BENCH - REMOVAL, SEAT BACK HINGE . . 23-101
COVER(S) - REMOVAL, TIMING BELT......9-61
COWL GRILLE - INSTALLATION
.........23-51
COWL GRILLE - REMOVAL
.............23-50
COWL TRIM - INSTALLATION
...........23-76
COWL TRIM - REMOVAL
...............23-76
C-PILLAR - INSTALLATION, SEAT BELT
HEIGHT ADJUSTER-BOR
.............8O-13C-PILLAR - REMOVAL, SEAT BELT
HEIGHT ADJUSTER-BOR.............8O-13
C-PILLAR TRIM - INSTALLATION........23-77
C-PILLAR TRIM - REMOVAL............23-77
CRADLE CROSSMEMBER -
DESCRIPTION, FRONT..................13-9
CRADLE CROSSMEMBER THREAD
REPAIR - DESCRIPTION, FRONT..........13-9
CRANK - INSTALLATION, WINDOW.......23-21
CRANK - REMOVAL, WINDOW..........23-21
CRANKSHAFT - INSPECTION.........9-37,9s-7
CRANKSHAFT - INSTALLATION.......9-38,9s-7
CRANKSHAFT - REMOVAL...........9-37,9s-6
CRANKSHAFT END PLAY - STANDARD
PROCEDURE.....................9-36,9s-6
CRANKSHAFT END PLAY - STANDARD
PROCEDURE, MEASURING.............9-125
CRANKSHAFT MAIN BEARINGS -
INSTALLATION.......................9-124
CRANKSHAFT MAIN BEARINGS -
REMOVAL..........................9-124
CRANKSHAFT OIL SEAL - FRONT -
INSTALLATION...................9-127,9-40
CRANKSHAFT OIL SEAL - FRONT -
REMOVAL......................9-127,9-40
CRANKSHAFT OIL SEAL - REAR -
INSTALLATION...................9-129,9-42
CRANKSHAFT OIL SEAL - REAR -
REMOVAL......................9-128,9-41
CRANKSHAFT POSITION SENSOR -
DESCRIPTION.......................14-25
CRANKSHAFT POSITION SENSOR -
OPERATION.........................14-25
CRANKSHAFT POSITION SENSOR -
REMOVAL..........................14-25
CRANKSHAFT REAR OIL SEAL RETAINER
- INSTALLATION.....................9-129
CRANKSHAFT REAR OIL SEAL RETAINER
- REMOVAL.........................9-129
CRANKSHAFT SPROCKET -
INSTALLATION...................9-156,9-65
CRANKSHAFT SPROCKET - REMOVAL....9-156,
9-64
CROSSBAR - INSTALLATION, LUGGAGE
RACK..............................23-57
CROSSBAR - REMOVAL, LUGGAGE RACK . 23-56
CROSSMEMBER - DESCRIPTION, FRONT
CRADLE.............................13-9
CROSSMEMBER MOUNT BUSHINGS -
INSTALLATION, FRONT................13-12
CROSSMEMBER MOUNT BUSHINGS -
REMOVAL, FRONT....................13-12
CROSSMEMBER THREAD REPAIR -
DESCRIPTION, FRONT CRADLE..........13-9
CROSSOVER - INSTALLATION,
GEARSHIFT CABLE...................21-76
CROSSOVER - REMOVAL, GEARSHIFT
CABLE.............................21-73
CROSS-OVER PIPE - 3.3/3.8L -
INSTALLATION........................11-6
CROSS-OVER PIPE - 3.3/3.8L -
REMOVAL...........................11-6
CUP HOLDER - INSTALLATION..........23-64
CUP HOLDER - REMOVAL..............23-64
CUPHOLDER - INSTALLATION, QUAD
BUCKET SEAT SIDE SHIELD - NO
........23-97
CUPHOLDER - REMOVAL, QUAD BUCKET
SEAT SIDE SHIELD - NO
...............23-97
CURB HEIGHT MEASUREMENT -
STANDARD PROCEDURE
................2-55
CUSHION - INSTALLATION, FRONT/QUAD
SEAT
..............................23-93
CUSHION - INSTALLATION, STABILIZER
BAR
.................................2-4
CUSHION - REMOVAL, FRONT/QUAD
SEAT
..............................23-93
CUSHION - REMOVAL, STABILIZER BAR
....2-4
CUSHION COVER - QUAD BUCKET, 50/50
SPLIT, BENCH - INSTALLATION, SEAT
. . . 23-100
CUSHION COVER - QUAD BUCKET, 50/50
SPLIT, BENCH - REMOVAL, SEAT
.......23-100
CUSHION SIDE COVER - INSTALLATION,
FRONT SEAT
........................23-94
CUSHION SIDE COVER - REMOVAL,
FRONT SEAT
........................23-94
CV BOOT - INNER - INSTALLATION
........3-6
CV BOOT - INNER - REMOVAL
............3-6
RSINDEX9
Description Group-Page Description Group-Page Description Group-Page
Page 2553 of 2585

CV BOOT - INNER/OUTER -
INSTALLATION........................3-17
CV BOOT - INNER/OUTER - REMOVAL.....3-15
CV BOOT - OUTER - INSTALLATION.......3-10
CV BOOT - OUTER - REMOVAL...........3-10
CYCLE - STANDARD PROCEDURE,
POWER DOOR LEARN................8N-28
CYCLE - STANDARD PROCEDURE,
POWER LIFTGATE LEARN...............8N-9
CYLINDER - DESCRIPTION, KEY/LOCK....19-20
CYLINDER - DESCRIPTION, STANDARD 4 . . . 8I-9
CYLINDER - INSTALLATION, KEY/LOCK . . . 19-20
CYLINDER - INSTALLATION, LOCK . . 23-19,23-42
CYLINDER - INSTALLATION, SLAVE.......6-11
CYLINDER - INSTALLATION, SUPPORT....23-43
CYLINDER - LHD - INSTALLATION,
MASTER............................6-10
CYLINDER - LHD - REMOVAL, MASTER.....6-9
CYLINDER - OPERATION, KEY/LOCK......19-20
CYLINDER - REMOVAL, KEY/LOCK.......19-20
CYLINDER - REMOVAL, LOCK......23-19,23-42
CYLINDER - REMOVAL, SLAVE...........6-11
CYLINDER - REMOVAL, SUPPORT.......23-43
CYLINDER - RHD - INSTALLATION,
MASTER.............................6-9
CYLINDER - RHD - REMOVAL, MASTER.....6-8
CYLINDER BLEEDING - STANDARD
PROCEDURE, MASTER............5-35,5s-34
CYLINDER BORE FITTING - STANDARD
PROCEDURE, PISTON TO...............9-42
CYLINDER BORE HONING - STANDARD
PROCEDURE....................9-112,9-35
CYLINDER COMBUSTION PRESSURE
LEAKAGE TEST - DIAGNOSIS AND
TESTING.........................9-83,9-9
CYLINDER COMPRESSION PRESSURE
TEST - DIAGNOSIS AND TESTING.....9-83,9-9
CYLINDER (FLUID RESERVOIR) -
ASSEMBLY, MASTER..............5-38,5s-37
CYLINDER (FLUID RESERVOIR) -
DISASSEMBLY, MASTER...........5-37,5s-36
CYLINDER HEAD - CLEANING . . 9-100,9-26,9s-17
CYLINDER HEAD - DESCRIPTION....9-24,9-99,
9s-16
CYLINDER HEAD - INSPECTION.....9-101,9-26,
9s-17
CYLINDER HEAD - INSTALLATION . . . 9-101,9-26,
9s-18
CYLINDER HEAD - REMOVAL . . 9-100,9-25,9s-17
CYLINDER HEAD COVER - CLEANING......9-31
CYLINDER HEAD COVER - INSPECTION....9-31
CYLINDER HEAD COVER -
INSTALLATION........................9-31
CYLINDER HEAD COVER - LEFT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - LEFT -
REMOVAL..........................9-103
CYLINDER HEAD COVER - REMOVAL......9-31
CYLINDER HEAD COVER - RIGHT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - RIGHT -
REMOVAL..........................9-102
CYLINDER HEAD COVER-LEFT -
INSTALLATION
.......................9s-20
CYLINDER HEAD COVER-LEFT -
REMOVAL
..........................9s-20
CYLINDER HEAD COVER-RIGHT -
INSTALLATION
.......................9s-19
CYLINDER HEAD COVER-RIGHT -
REMOVAL
..........................9s-19
CYLINDER HEAD COVER(S) -
DESCRIPTION
..................9-102,9s-19
CYLINDER HEAD GASKET - DIAGNOSIS
AND TESTING
...............9-24,9-99,9s-16
CYLINDER HEAD OFF - INSTALLATION
. . . 9-108,
9-33,9s-26
CYLINDER HEAD OFF - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HEAD ON - INSTALLATION
....9-108,
9-33,9s-26
CYLINDER HEAD ON - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HOUSING - INSTALLATION,
LOCK
..............................19-19
CYLINDER HOUSING - REMOVAL, LOCK
. . 19-17
CYLINDER LOCK SWITCH -
DESCRIPTION, DOOR
.................8N-40CYLINDER LOCK SWITCH - DIAGNOSIS
AND TESTING, DOOR.................8N-40
CYLINDER LOCK SWITCH - EXPORT -
DESCRIPTION, DOOR..................8N-3
CYLINDER LOCK SWITCH - EXPORT -
DIAGNOSIS AND TESTING, DOOR........8N-3
CYLINDER LOCK SWITCH - EXPORT -
INSTALLATION, DOOR.................8N-4
CYLINDER LOCK SWITCH - EXPORT -
OPERATION, DOOR....................8N-3
CYLINDER LOCK SWITCH - EXPORT -
REMOVAL, DOOR.....................8N-3
CYLINDER LOCK SWITCH -
INSTALLATION, DOOR.................8N-41
CYLINDER LOCK SWITCH - OPERATION,
DOOR.............................8N-40
CYLINDER LOCK SWITCH - REMOVAL,
DOOR.............................8N-41
CYLINDERS - INSPECTION, WHEEL . . 5-57,5s-59
CYLINDERS - INSTALLATION, WHEEL . 5-57,5s-60
CYLINDERS - REMOVAL, WHEEL....5-57,5s-59
DAMAGED OR WORN THREADS -
STANDARD PROCEDURE, REPAIR OF . . 9-10,9-86
DAMPER - INSTALLATION, VIBRATION . . . 9-130,
9-47
DAMPER - REMOVAL, VIBRATION . . . 9-130,9-47
DATA BUS COMMUNICATION RECEIVE -
PCM INPUT - OPERATION..............8E-15
DATA LINK CONNECTOR - DESCRIPTION . . . 8E-6
DATA LINK CONNECTOR - OPERATION.....8E-7
DAY / NIGHT MIRROR - DESCRIPTION,
AUTOMATIC..........................8N-47
DAY / NIGHT MIRROR - DIAGNOSIS AND
TESTING, AUTOMATIC................8N-47
DAY / NIGHT MIRROR - OPERATION,
AUTOMATIC........................8N-47
DEAERATION - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-4
DECOUPLER PULLEY - DESCRIPTION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - DIAGNOSIS AND
TESTING, GENERATOR...........8F-25,8F-27
DECOUPLER PULLEY - INSTALLATION,
GENERATOR....................8F-26,8F-28
DECOUPLER PULLEY - OPERATION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - REMOVAL,
GENERATOR....................8F-26,8F-28
DEFINITION - DESCRIPTION, TRIP........25-1
DEFLECTOR - INSTALLATION, WIND.....23-121
DEFLECTOR - REMOVAL, WIND........23-121
DEFOGGER RELAY - DESCRIPTION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - INSTALLATION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - OPERATION, REAR
WINDOW............................8G-3
DEFOGGER RELAY - REMOVAL, REAR
WINDOW............................8G-3
DEFOGGER SWITCH - DESCRIPTION,
REAR WINDOW.......................8G-4
DEFOGGER SWITCH - OPERATION, REAR
WINDOW............................8G-4
DEFOGGER SYSTEM - DIAGNOSIS AND
TESTING, REAR WINDOW..............8G-2
DEFROSTER DUCT - INSTALLATION......24-50
DEFROSTER DUCT - REMOVAL..........24-50
DEMAGNETIZING - STANDARD
PROCEDURE, COMPASS...............8M-4
DEMISTER DUCTS - INSTALLATION,
INSTRUMENT PANEL..................24-55
DEMISTER DUCTS - REMOVAL,
INSTRUMENT PANEL..................24-55
DEMISTER OUTLET - INSTALLATION.....24-46
DEMISTER OUTLET - REMOVAL.........24-45
DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER AN
AIRBAG.............................8O-3
DETECTION ASSY - INSTALLATION,
NATURAL VAC LEAK
..................25-13
DETECTION ASSY - REMOVAL, NATURAL
VAC LEAK
..........................25-13
DETECTION PUMP - INSTALLATION,
LEAK
..............................25-13
DETECTION PUMP - REMOVAL, LEAK
....25-13
DEVICES - STANDARD PROCEDURE,
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE
........................8W-01-8DIAGNOSTIC SYSTEM - DIAGNOSIS AND
TESTING, ON-BOARD.................8F-21
DIAGNOSTIC TROUBLE CODES -
STANDARD PROCEDURE, OBTAINING.....8E-15
DIAGRAMS - 41TE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21-169
DIAGRAMS - 4XTE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21s-75
DIAGRAMS - DESCRIPTION, HOW TO
USE WIRING......................8W-01-1
DIAGRAMS - SPECIAL TOOLS,
SCHEMATICS.......................21s-89
DIESEL - DESCRIPTION, 2.5L...........19-51
DIESEL - DIAGNOSIS AND TESTING,
SYSTEM CHARGE LEVEL TEST - 2.5L....24-68
DIESEL - INSTALLATION, 2.5L..........19-52
DIESEL - REMOVAL, 2.5L..............19-51
DIESEL ENGINE - DESCRIPTION, FUEL
REQUIREMENTS.......................0-6
DIESEL ENGINES - DESCRIPTION,
ENGINE OIL...........................0-6
DIESEL ENGINES - EXPORT -
DESCRIPTION........................0-24
DIESEL HEATER WIRING -
INSTALLATION, SUPPLEMENTAL........24-119
DIESEL HEATER WIRING - REMOVAL,
SUPPLEMENTAL....................24-119
DIESEL SUPPLEMENTAL CABIN HEATER
- DIAGNOSIS AND TESTING...........24-113
DIFFERENTIAL - ASSEMBLY............21-66
DIFFERENTIAL - DESCRIPTION...........21-62
DIFFERENTIAL - DISASSEMBLY.........21-62
DIFFERENTIAL - OPERATION............21-62
DIFFERENTIAL ASSEMBLY -
DESCRIPTION........................3-39
DIFFERENTIAL ASSEMBLY - OPERATION . . . 3-39
DIFFERENTIAL ASSEMBLY FLUID
CHANGE - STANDARD PROCEDURE.......3-40
DIFFERENTIAL BEARING PRELOAD -
ADJUSTMENT......................21-199
DIFFERENTIAL BEARING PRELOAD
MEASUREMENT AND ADJUSTMENT,
ADJUSTMENTS....................21s-100
DIFFERENTIAL CARRIER SEAL -
INSTALLATION........................21-9
DIFFERENTIAL CARRIER SEAL -
REMOVAL...........................21-9
DIFFERENTIAL SIDE GEAR END PLAY -
ADJUSTMENT.......................21-70
DIFFERENTIAL TURNING TORQUE -
ADJUSTMENT.......................21-69
DIMENSIONS - SPECIFICATIONS, BODY
OPENING..........................23-127
DIMENSIONS, SPECIFICATIONS - FRAME . . . 13-4
DIODE - INSTALLATION............8W-01-14
DIODE - REMOVAL................8W-01-14
DISC AND PRESSURE PLATE - 2.5L TD -
INSTALLATION, CLUTCH................6-12
DISC AND PRESSURE PLATE - 2.5L TD -
REMOVAL, CLUTCH....................6-11
DISC BRAKE CALIPER - INSTALLATION,
REAR..........................5-30,5s-29
DISC BRAKE CALIPER - REMOVAL,
REAR..........................5-27,5s-26
DISC BRAKE CALIPER ADAPTER -
INSTALLATION, FRONT............5-31,5s-30
DISC BRAKE CALIPER ADAPTER -
REMOVAL, FRONT................5-31,5s-30
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - INSTALLATION,
FRONT.............................5s-26
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - REMOVAL, FRONT.....5s-23
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - INSTALLATION, FRONT........5-27
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - INSTALLATION, FRONT
........5-27
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-31
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) - REMOVAL
.......5-31
10 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2555 of 2585

DRIVE UNIT - INSTALLATION, LOWER....8N-33
DRIVE UNIT - OPERATION, LOWER......8N-32
DRIVE UNIT - REMOVAL, LOWER.......8N-33
DRIVE UNIT TRACK & RACK -
DESCRIPTION, LOWER................8N-34
DRIVE UNIT TRACK & RACK -
INSTALLATION, LOWER...............8N-34
DRIVE UNIT TRACK & RACK -
OPERATION, LOWER..................8N-34
DRIVE UNIT TRACK & RACK -
REMOVAL, LOWER...................8N-34
DRIVELINE MODULE - DESCRIPTION,
REAR...............................3-23
DRIVELINE MODULE - OPERATION,
REAR...............................3-23
DRIVELINE MODULE - SPECIFICATIONS,
REAR...............................3-34
DRIVELINE MODULE FLUIDS -
DESCRIPTION, AWD REAR...............0-6
DRIVELINE MODULE NOISE -
DIAGNOSIS AND TESTING, REAR.........3-24
DRIVELINE MODULE OPERATION -
DIAGNOSIS AND TESTING, REAR.........3-26
DRIVER AIRBAG - DESCRIPTION.........8O-6
DRIVER AIRBAG - INSTALLATION........8O-7
DRIVER AIRBAG - OPERATION...........8O-6
DRIVER AIRBAG - REMOVAL............8O-6
DRIVER AIRBAG TRIM COVER -
INSTALLATION.......................8O-7
DRIVER AIRBAG TRIM COVER -
REMOVAL...........................8O-7
DRIVER HEATED SEAT SWITCH -
DESCRIPTION........................8G-8
DRIVER HEATED SEAT SWITCH -
DIAGNOSIS AND TESTING..............8G-9
DRIVER HEATED SEAT SWITCH -
INSTALLATION......................8G-10
DRIVER HEATED SEAT SWITCH -
OPERATION..........................8G-8
DRIVER HEATED SEAT SWITCH -
REMOVAL..........................8G-10
DRIVER POWER SEAT TRACK -
DESCRIPTION..................8N-15,8N-58
DRIVER POWER SEAT TRACK -
DIAGNOSIS AND TESTING........8N-15,8N-58
DRIVER POWER SEAT TRACK -
INSTALLATION.................8N-16,8N-59
DRIVER POWER SEAT TRACK -
OPERATION...................8N-15,8N-58
DRIVER POWER SEAT TRACK -
REMOVAL.....................8N-16,8N-59
DRIVER SEAT SWITCH - DESCRIPTION . . . 8N-10,
8N-53
DRIVER SEAT SWITCH - DIAGNOSIS
AND TESTING..................8N-11,8N-54
DRIVER SEAT SWITCH - INSTALLATION . . 8N-12,
8N-55
DRIVER SEAT SWITCH - OPERATION....8N-11,
8N-54
DRIVER SEAT SWITCH - REMOVAL . 8N-12,8N-55
DRIVING CLUTCHES - DESCRIPTION....21-190,
21s-95
DRIVING CLUTCHES - OPERATION.....21-190,
21s-95
DROP - STANDARD PROCEDURE,
TESTING FOR A VOLTAGE...........8W-01-10
DRUM - INSTALLATION............5-32,5s-31
DRUM - REMOVAL...............5-32,5s-31
DRUM BRAKE - INSTALLATION,
SUPPORT PLATE.................5-56,5s-58
DRUM BRAKE - REMOVAL, SUPPORT
PLATE .........................5-56,5s-58
DRUM BRAKE AUTOMATIC ADJUSTER -
DIAGNOSIS AND TESTING.........5-13,5s-13
DRUM BRAKE SHOE LINING -
INSPECTION, REAR...............5-22,5s-21
DRUM BRAKE SHOES - ADJUSTMENT,
REAR..........................5-23,5s-22
DRUM BRAKE SHOES - INSTALLATION,
REAR..........................5-22,5s-21
DRUM BRAKE SHOES - REMOVAL, REAR . . 5-19,
5s-18
DRUM BRAKES (REAR) - DESCRIPTION
. . . 5-13,
5s-12
DUAL ZONE - DESCRIPTION
.............24-2
DUAL ZONE - OPERATION
...............24-5
DUCT - INSTALLATION, DEFROSTER
.....24-50
DUCT - INSTALLATION, DISTRIBUTION
. . . 24-57DUCT - INSTALLATION, REAR FLOOR
HEAT ..............................24-63
DUCT - REMOVAL, DEFROSTER.........24-50
DUCT - REMOVAL, DISTRIBUTION.......24-57
DUCT - REMOVAL, REAR FLOOR HEAT . . . 24-62
DUCTS - INSTALLATION, FLOOR
DISTRIBUTION.......................24-50
DUCTS - INSTALLATION, INSTRUMENT
PANEL.............................24-55
DUCTS - INSTALLATION, INSTRUMENT
PANEL DEMISTER....................24-55
DUCTS - REMOVAL, FLOOR
DISTRIBUTION.......................24-50
DUCTS - REMOVAL, INSTRUMENT
PANEL.............................24-55
DUCTS - REMOVAL, INSTRUMENT
PANEL DEMISTER....................24-55
DUTY, CARGO - INSTALLATION, AWD,
HEAVY..............................2-36
DUTY, CARGO - REMOVAL, AWD, HEAVY . . . 2-36
DVD PLAYER - DESCRIPTION............8A-8
DVD PLAYER - INSTALLATION...........8A-8
DVD PLAYER - OPERATION.............8A-8
DVD PLAYER - REMOVAL...............8A-8
ELECTROLYTE LEVEL - STANDARD
PROCEDURE, CHECKING BATTERY.......8F-14
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - DESCRIPTION........5-75
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - OPERATION..........5-77
ELECTRONIC VEHICLE INFO CENTER -
DESCRIPTION........................8M-6
ELECTRONIC VEHICLE INFO CENTER -
INSTALLATION.......................8M-9
ELECTRONIC VEHICLE INFO CENTER -
OPERATION.........................8M-7
ELECTRONIC VEHICLE INFO CENTER -
REMOVAL...........................8M-9
ELECTRONIC VEHICLE INFORMATION
CENTER - DIAGNOSIS AND TESTING......8M-7
ELECTRONIC VEHICLE INFORMATION
CENTER PROGRAMMING - STANDARD
PROCEDURE.........................8M-7
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE DEVICES - STANDARD
PROCEDURE......................8W-01-8
ELEMENT - INSTALLATION, AIR
CLEANER........................9-24,9-98
ELEMENT - REMOVAL, AIR CLEANER . . 9-24,9-98
ELEMENTS - DESCRIPTION, HEATED
SEAT ..............................8G-10
ELEMENTS - DIAGNOSIS AND TESTING,
HEATED SEAT .......................8G-10
ELEMENTS - INSTALLATION, HEATED
SEAT ..............................8G-11
ELEMENTS - OPERATION, HEATED SEAT . . 8G-10
ELEMENTS - REMOVAL, HEATED SEAT . . . 8G-11
E-MARK LABEL - DESCRIPTION.......Intro.-11
EMISSION CONTROL INFORMATION
LABEL - DESCRIPTION, VEHICLE.........25-1
END CAP - INSTALLATION, INSTRUMENT
PANEL.............................23-68
END CAP - REMOVAL, INSTRUMENT
PANEL.............................23-68
END COVER BALL BEARING -
INSTALLATION.......................21-10
END COVER BALL BEARING - REMOVAL . . . 21-9
END COVER SEAL - INSTALLATION......21-11
END COVER SEAL - REMOVAL..........21-11
END PLAY - ADJUSTMENT,
DIFFERENTIAL SIDE GEAR.............21-70
END PLAY - STANDARD PROCEDURE,
CRANKSHAFT....................9-36,9s-6
END PLAY - STANDARD PROCEDURE,
MEASURING CAMSHAFT................9-29
END PLAY - STANDARD PROCEDURE,
MEASURING CRANKSHAFT.............9-125
END SEAL - INSTALLATION, INPUT
SHAFT.............................21-16
END SEAL - REMOVAL, INPUT SHAFT....21-15
ENGAGE ACTUATOR - DESCRIPTION.....8N-10
ENGAGE ACTUATOR - INSTALLATION.....8N-11
ENGAGE ACTUATOR - OPERATION
.......8N-11
ENGAGE ACTUATOR - REMOVAL
........8N-11
ENGINE - CLEANING
...................7-18
ENGINE - DESCRIPTION, 2.4L/3.3L/3.8L
. . . 19-51
ENGINE - DESCRIPTION, FUEL
REQUIREMENTS - DIESEL
...............0-6ENGINE - INSPECTION.................7-18
ENGINE - INSTALLATION, 2.4L.....19-46,19-49,
19-50,19-52
ENGINE - INSTALLATION, 3.3L/3.8L . 19-47,19-49,
19-50,19-52
ENGINE - INSTALLATION, A/C
COMPRESSOR MOUNTING BRACKET -
2.4L...............................24-76
ENGINE - REMOVAL, 2.4L . . . 19-45,19-48,19-50,
19-51
ENGINE - REMOVAL, 3.3L/3.8L....19-45,19-48,
19-50,19-51
ENGINE - REMOVAL, A/C COMPRESSOR
MOUNTING BRACKET - 2.4L............24-75
ENGINE - SPECIFICATIONS, 2.4L.....9-17,9s-1
ENGINE - STANDARD PROCEDURE,
HYDROSTATIC LOCKED.............9-10,9-85
ENGINE 2.4L - DESCRIPTION.............9-3
ENGINE 3.3/3.8L - DESCRIPTION.........9-76
ENGINE ASSEMBLY - INSTALLATION . . 9-16,9-89
ENGINE ASSEMBLY - REMOVAL......9-13,9-86
ENGINE BLOCK - CLEANING........9-112,9-36
ENGINE BLOCK - DESCRIPTION.....9-112,9-35
ENGINE BLOCK - INSPECTION......9-112,9-36
ENGINE BLOCK HEATER - DESCRIPTION . . . 7-20
ENGINE BLOCK HEATER - INSTALLATION . . . 7-20
ENGINE BLOCK HEATER - OPERATION.....7-20
ENGINE BLOCK HEATER - REMOVAL......7-20
ENGINE BLOCK HEATER TESTING -
DIAGNOSIS AND TESTING................7-20
ENGINE COOLANT - DESCRIPTION........7-19
ENGINE COOLANT - DESCRIPTION.........0-3
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - DESCRIPTION..........7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - INSTALLATION..........7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - REMOVAL.............7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - DESCRIPTION.......7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - INSTALLATION.......7-22
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - REMOVAL..........7-21
ENGINE COOLANT THERMOSTAT - 2.4L -
INSTALLATION........................7-23
ENGINE COOLANT THERMOSTAT - 2.4L -
REMOVAL...........................7-23
ENGINE COOLANT THERMOSTAT -
3.3/3.8L - INSTALLATION...............7-24
ENGINE COOLANT THERMOSTAT -
3.3/3.8L - REMOVAL...................7-23
ENGINE COOLANT THERMOSTAT -
DESCRIPTION........................7-22
ENGINE COOLANT THERMOSTAT -
DIAGNOSIS AND TESTING..............7-23
ENGINE COOLANT THERMOSTAT -
OPERATION..........................7-22
ENGINE COOLING SYSTEM - DIAGNOSIS
AND TESTING........................7-14
ENGINE COOLING SYSTEM
REQUIREMENTS - DESCRIPTION.........24-1
ENGINE COOLING SYSTEM, WARNING
....24-65
ENGINE CORE AND OIL GALLERY PLUGS
- STANDARD PROCEDURE
..........9-10,9-86
ENGINE DIAGNOSIS - INTRODUCTION -
DIAGNOSIS AND TESTING
...........9-3,9-76
ENGINE DIAGNOSIS - MECHANICAL -
DIAGNOSIS AND TESTING
...........9-6,9-80
ENGINE DIAGNOSIS - PERFORMANCE -
DIAGNOSIS AND TESTING
...........9-4,9-78
ENGINE GASKET SURFACE
PREPARATION - STANDARD
PROCEDURE
.....................9-11,9-85
ENGINE MOUNTING - DESCRIPTION
. 9-131,9-48
ENGINE OIL - DESCRIPTION, FLEXIBLE
FUEL
................................0-3
ENGINE OIL - DIESEL ENGINES -
DESCRIPTION
.........................0-6
ENGINE OIL AND FILTER CHANGE -
STANDARD PROCEDURE
...........9-137,9-53
ENGINE OIL AND LUBRICANTS -
DESCRIPTION
.........................0-1
ENGINE OIL LEAK INSPECTION -
DIAGNOSIS AND TESTING
...........9-8,9-82
ENGINE OIL LEVEL CHECK - STANDARD
PROCEDURE
........................9-137
12 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2556 of 2585

ENGINE OIL LEVEL CHECK, STANDARD
PROCEDURE.........................9-53
ENGINE OIL PRESSURE - DIAGNOSIS
AND TESTING.......................9-136
ENGINE OIL PRESSURE - DIAGNOSIS
AND TESTING, CHECKING...............9-52
ENGINE, SPECIAL TOOLS - 2.4L..........9-21
ENGINE, SPECIAL TOOLS - 3.3/3.8L.......9-95
ENGINE, SPECIFICATIONS - 3.3/3.8L . . 9-91,9s-11
ENGINE SPEED SENSOR - DESCRIPTION . . 14-26
ENGINE SPEED SENSOR - OPERATION....14-26
ENGINES - DESCRIPTION, ENGINE OIL -
DIESEL..............................0-6
ENGINES - DIAGNOSIS AND TESTING,
SYSTEM CHARGE LEVEL TEST -
GASOLINE..........................24-67
ENGINES - EXPORT - DESCRIPTION,
DIESEL.............................0-24
ENTRY MODULE - DESCRIPTION,
REMOTE KEYLESS...................8N-43
ENTRY MODULE - DESCRIPTION,
SENTRY KEY REMOTE.................8Q-3
ENTRY MODULE - DIAGNOSIS AND
TESTING, REMOTE KEYLESS...........8N-43
ENTRY MODULE - DIAGNOSIS AND
TESTING, SENTRY KEY REMOTE.........8Q-5
ENTRY MODULE - INSTALLATION,
REMOTE KEYLESS...................8N-44
ENTRY MODULE - INSTALLATION,
SENTRY KEY REMOTE.................8Q-6
ENTRY MODULE - OPERATION, REMOTE
KEYLESS...........................8N-43
ENTRY MODULE - OPERATION, SENTRY
KEY REMOTE........................8Q-4
ENTRY MODULE - REMOVAL, REMOTE
KEYLESS...........................8N-44
ENTRY MODULE - REMOVAL, SENTRY
KEY REMOTE........................8Q-5
ENTRY SYSTEM - DIAGNOSIS AND
TESTING, SENTRY KEY REMOTE.........8Q-3
ENTRY TRANSMITTER - DIAGNOSIS AND
TESTING, KEYLESS..............8N-42,8N-5
ENTRY TRANSMITTER PROGRAMMING -
STANDARD PROCEDURE, REMOTE
KEYLESS............................8N-5
EQUIPMENT - STANDARD PROCEDURE,
REFRIGERANT SYSTEM SERVICE........24-70
ERASING TRANSMITTER CODES -
STANDARD PROCEDURE..............8M-11
EVACUATE - STANDARD PROCEDURE,
REFRIGERANT SYSTEM...............24-72
EVAP CANISTER - INSTALLATION, REAR . . 25-20
EVAP CANISTER - REMOVAL, REAR......25-19
EVAPORATION CONTROL SYSTEM -
OPERATION.........................25-10
EVAPORATOR - DESCRIPTION, A/C . 24-80,24-97
EVAPORATOR - INSTALLATION, A/C......24-80
EVAPORATOR - INSTALLATION, REAR
A/C................................24-99
EVAPORATOR - OPERATION, A/C . . . 24-80,24-97
EVAPORATOR - REMOVAL, A/C..........24-80
EVAPORATOR - REMOVAL, REAR A/C.....24-97
EVAPORATOR LINE EXTENSION -
INSTALLATION, REAR A/C..............24-99
EVAPORATOR LINE EXTENSION -
REMOVAL, A/C......................24-98
EVAPORATOR TEMPERATURE SENSOR -
DESCRIPTION.......................24-27
EVAPORATOR TEMPERATURE SENSOR -
OPERATION.........................24-28
EVAP/PURGE SOLENOID - DESCRIPTION . . 25-12
EVAP/PURGE SOLENOID - INSTALLATION . 25-12
EVAP/PURGE SOLENOID - OPERATION....25-12
EVAP/PURGE SOLENOID - REMOVAL.....25-12
EXCESSIVE EXHAUST SYSTEM NOISE -
DIAGNOSIS AND TESTING..............11-2
EXHAUST MANIFOLD - CLEANING........9-61
EXHAUST MANIFOLD - INSPECTION.......9-61
EXHAUST MANIFOLD - INSTALLATION.....9-61
EXHAUST MANIFOLD - LEFT - CLEANING . . 9-152
EXHAUST MANIFOLD - LEFT -
INSPECTION
........................9-152
EXHAUST MANIFOLD - LEFT -
INSTALLATION
.......................9-152
EXHAUST MANIFOLD - LEFT - REMOVAL
. . 9-152
EXHAUST MANIFOLD - REMOVAL
.........9-61
EXHAUST MANIFOLD - RIGHT -
CLEANING
..........................9-151EXHAUST MANIFOLD - RIGHT -
INSPECTION........................9-151
EXHAUST MANIFOLD - RIGHT -
INSTALLATION.......................9-151
EXHAUST MANIFOLD - RIGHT -
REMOVAL..........................9-150
EXHAUST SYSTEM - DESCRIPTION.......11-1
EXHAUST SYSTEM NOISE - DIAGNOSIS
AND TESTING, EXCESSIVE..............11-2
EXHAUST SYSTEM RESTRICTION CHECK
- DIAGNOSIS AND TESTING.............11-2
EXHAUST SYSTEM, SPECIAL TOOLS......11-4
EXHAUST TUBE - INSTALLATION.......24-115
EXHAUST TUBE - REMOVAL...........24-114
EXHAUSTER - DESCRIPTION, REAR
QUARTER PANEL/FENDER AIR..........23-57
EXHAUSTER - INSTALLATION, REAR
QUARTER PANEL/FENDER AIR..........23-58
EXHAUSTER - REMOVAL, REAR
QUARTER PANEL/FENDER AIR..........23-57
EXPANSION VALVE - DESCRIPTION......24-81
EXPANSION VALVE - DESCRIPTION, A/C . . 24-99
EXPANSION VALVE - DIAGNOSIS AND
TESTING..........................24-100
EXPANSION VALVE - DIAGNOSIS AND
TESTING, A/C.......................24-81
EXPANSION VALVE - INSTALLATION......24-82
EXPANSION VALVE - INSTALLATION, A/C . 24-100
EXPANSION VALVE - OPERATION........24-81
EXPANSION VALVE - OPERATION, A/C....24-99
EXPANSION VALVE - REMOVAL.........24-82
EXPANSION VALVE - REMOVAL, A/C.....24-100
EXPORT - BRAKE ROTOR..........5-55,5s-58
EXPORT - DESCRIPTION...........5-58,5s-60
EXPORT - DESCRIPTION................0-15
EXPORT - DESCRIPTION................2-10
EXPORT - DESCRIPTION, ANTENNA
MODULE............................8A-6
EXPORT - DESCRIPTION, DIESEL
ENGINES............................0-24
EXPORT - DESCRIPTION, DOOR
CYLINDER LOCK SWITCH...............8N-3
EXPORT - DESCRIPTION, POWER
FOLDAWAY MIRROR SWITCH..........8N-48
EXPORT - DESCRIPTION, QUARTER
GLASS INTEGRAL ANTENNA.............8A-9
EXPORT - DIAGNOSIS AND TESTING,
ANTENNA MODULE....................8A-7
EXPORT - DIAGNOSIS AND TESTING,
DOOR CYLINDER LOCK SWITCH.........8N-3
EXPORT - DIAGNOSIS AND TESTING,
QUARTER GLASS INTEGRAL ANTENNA....8A-9
EXPORT - INSTALLATION...............2-11
EXPORT - INSTALLATION, ANTENNA
MODULE............................8A-7
EXPORT - INSTALLATION, DOOR
CYLINDER LOCK SWITCH...............8N-4
EXPORT - INSTALLATION, HEADLAMP
UNIT..............................8L-17
EXPORT - INSTALLATION, HOOD AJAR
SWITCH............................8Q-3
EXPORT - INSTALLATION, POWER
FOLDAWAY MIRROR SWITCH..........8N-49
EXPORT - OPERATION, ANTENNA
MODULE............................8A-6
EXPORT - OPERATION, DOOR CYLINDER
LOCK SWITCH........................8N-3
EXPORT - OPERATION, POWER
FOLDAWAY MIRROR SWITCH..........8N-48
EXPORT - OPERATION, QUARTER GLASS
INTEGRAL ANTENNA...................8A-9
EXPORT - REMOVAL...................2-11
EXPORT - REMOVAL, ANTENNA MODULE . . 8A-7
EXPORT - REMOVAL, DOOR CYLINDER
LOCK SWITCH........................8N-3
EXPORT - REMOVAL, HEADLAMP UNIT . . . 8L-17
EXPORT - REMOVAL, HOOD AJAR
SWITCH............................8Q-3
EXPORT - REMOVAL, POWER
FOLDAWAY MIRROR SWITCH
..........8N-48
EXPORT - STANDARD PROCEDURE,
FRONT FOG LAMP UNIT ALIGNMENT
......8L-9
EXPORT - STANDARD PROCEDURE,
HEADLAMP UNIT ALIGNMENT
..........8L-14
EXTENSION - INSTALLATION, REAR A/C
EVAPORATOR LINE
...................24-99
EXTENSION - REMOVAL, A/C
EVAPORATOR LINE
...................24-98EXTENSION TRIM - INSTALLATION,
A-PILLAR LOWER....................23-74
EXTENSION TRIM - REMOVAL, A-PILLAR
LOWER............................23-74
EXTERIOR - DESCRIPTION, LAMPS/
LIGHTING...........................8L-2
EXTERIOR - OPERATION, LAMPS/
LIGHTING...........................8L-2
EXTERIOR - WARNING, LAMPS/
LIGHTING...........................8L-3
EXTERIOR HANDLE - INSTALLATION.....23-22,
23-40
EXTERIOR HANDLE - REMOVAL....23-21,23-40
EXTERIOR HANDLE SWITCH -
DESCRIPTION.......................8N-11
EXTERIOR HANDLE SWITCH -
INSTALLATION......................8N-12
EXTERIOR HANDLE SWITCH -
OPERATION.........................8N-11
EXTERIOR HANDLE SWITCH - REMOVAL . . 8N-11
EXTERIOR LAMPS, SPECIFICATIONS......8L-3
EXTERIOR NAME PLATES - ADHESIVE
ATTACHED - INSTALLATION............23-51
EXTERIOR NAME PLATES - ADHESIVE
ATTACHED - REMOVAL................23-51
EXTERIOR NAME PLATES - TAPE
ATTACHED - INSTALLATION............23-51
EXTERIOR NAME PLATES - TAPE
ATTACHED - REMOVAL................23-51
FACTOR SETTING - STANDARD
PROCEDURE, PINION............8E-15,8E-23
FAILED PARK SWITCH - DIAGNOSIS AND
TESTING..............................8R-2
FAN - DESCRIPTION, RADIATOR..........7-28
FAN - INSTALLATION, RADIATOR.........7-30
FAN - OPERATION, RADIATOR...........7-29
FAN - REMOVAL, RADIATOR.............7-30
FAN MOTOR - DIAGNOSIS AND
TESTING, RADIATOR...................7-29
FAN RELAY - DESCRIPTION, RADIATOR....7-30
FAN RELAY - INSTALLATION, RADIATOR . . . 7-30
FAN RELAY - OPERATION, RADIATOR......7-30
FAN RELAY - REMOVAL, RADIATOR.......7-30
FASCIA - INSTALLATION, FRONT.........13-1
FASCIA - INSTALLATION, REAR..........13-2
FASCIA - REMOVAL, FRONT.............13-1
FASCIA - REMOVAL, REAR..............13-2
FASCIA - SCUFF PAD - INSTALLATION,
REAR...............................13-4
FASCIA - SCUFF PAD - REMOVAL, REAR . . . 13-3
FASTENER IDENTIFICATION -
DESCRIPTION......................Intro.-2
FASTENER TORQUE, SPECIFICATIONS -
ABS ................................5-79
FASTENER TORQUE, SPECIFICATIONS -
BRAKE...........................5-9,5s-8
FASTENER TORQUE, SPECIFICATIONS -
FRONT SUSPENSION...................2-3
FASTENER TORQUE, SPECIFICATIONS -
POWER STEERING....................19-9
FASTENER TORQUE, SPECIFICATIONS -
REAR SUSPENSION...................2-28
FASTENER USAGE - DESCRIPTION......Intro.-5
FEED CIRCUIT RESISTANCE TEST -
DIAGNOSIS AND TESTING.........8F-32,8F-34
FEED CIRCUIT TEST - DIAGNOSIS AND
TESTING
......................8F-33,8F-35
FENDER - INSTALLATION, FRONT
........23-52
FENDER - REMOVAL, FRONT
...........23-52
FILL - DIAGNOSIS AND TESTING,
VEHICLE DOES NOT
..................25-16
FILL - STANDARD PROCEDURE, FLUID
DRAIN
.............................21-71
FILL DOOR - INSTALLATION, FUEL
.......23-52
FILL DOOR - REMOVAL, FUEL
..........23-52
FILL DOOR BLOCKER LATCH -
INSTALLATION, FUEL
.................23-53
FILL DOOR BLOCKER LATCH -
REMOVAL, FUEL
.....................23-53
FILL DOOR BLOCKER LATCH STRIKER -
INSTALLATION, FUEL
.................23-53
FILL DOOR BLOCKER LATCH STRIKER -
REMOVAL, FUEL
.....................23-53
FILL DOOR BLOCKER LOCKOUT LINK -
INSTALLATION, FUEL
.................23-54
FILL DOOR BLOCKER LOCKOUT LINK -
REMOVAL, FUEL
.....................23-53
RSINDEX13
Description Group-Page Description Group-Page Description Group-Page
Page 2557 of 2585

FILL/CHECK LOCATIONS - DESCRIPTION,
FLUID...............................0-7
FILLER CAP - DESCRIPTION, FUEL.......25-12
FILLER CAP - OPERATION, FUEL........25-12
FILLER NECK SEAL - DIAGNOSIS AND
TESTING, RADIATOR CAP TO............7-27
FILLER TUBE - INSTALLATION, FUEL
TANK ..............................14-13
FILLER TUBE - REMOVAL, FUEL TANK....14-12
FILLING - STANDARD PROCEDURE,
COOLING SYSTEM.....................7-5
FILLING - STANDARD PROCEDURE,
REAR HEATER CORE.................24-101
FILTER - DESCRIPTION, AIR............24-43
FILTER - DESCRIPTION, OIL.............9-53
FILTER - INSTALLATION, AIR...........24-44
FILTER - INSTALLATION, INLET..........14-13
FILTER - INSTALLATION, OIL.......9-139,9-53
FILTER - REMOVAL, AIR...............24-43
FILTER - REMOVAL, INLET.............14-13
FILTER - REMOVAL, OIL...........9-139,9-53
FILTER ADAPTER - INSTALLATION, OIL . . . 9-139
FILTER ADAPTER - REMOVAL, OIL.......9-139
FILTER CHANGE - STANDARD
PROCEDURE, ENGINE OIL..........9-137,9-53
FILTER SERVICE - STANDARD
PROCEDURE, FLUID..........21-203,21s-104
FINAL DRIVE - ASSEMBLY......21-195,21s-99
FINAL DRIVE - DESCRIPTION............21s-95
FINAL DRIVE - DISASSEMBLY....21-190,21s-96
FINAL DRIVE - OPERATION............21s-96
FINESSE SANDING/BUFFING &
POLISHING - DESCRIPTION............23-85
FINISH - DESCRIPTION, BASE
COAT/CLEARCOAT....................23-85
FIRING ORDER, SPECIFICATIONS.........8I-3
FIRST ROW - BENCH - INSTALLATION,
SEAT BELT BUCKLE..................8O-13
FIRST ROW - BENCH - REMOVAL, SEAT
BELT BUCKLE.......................8O-13
FIRST ROW - OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR........................8O-14
FIRST ROW - OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR.............8O-14
FIRST ROW INBOARD - QUAD BUCKET -
INSTALLATION, SEAT BELT BUCKLE......8O-12
FIRST ROW INBOARD - QUAD BUCKET -
REMOVAL, SEAT BELT BUCKLE.........8O-12
FITTING - CONNECTING ROD............9-45
FITTING - PISTON RING................9-45
FITTING - STANDARD PROCEDURE,
MAIN BEARING......................9-123
FITTING - STANDARD PROCEDURE,
PISTON RING.......................9-121
FITTING - STANDARD PROCEDURE,
PISTON TO CYLINDER BORE............9-42
FITTING CONNECTING RODS -
STANDARD PROCEDURE...............9-116
FITTING PISTONS - STANDARD
PROCEDURE........................9-117
FITTINGS - STANDARD PROCEDURE,
HANDLING TUBING...................24-70
FITTINGS - STANDARD PROCEDURE,
QUICK-CONNECT.....................14-14
FLANGE SEAL - INSTALLATION, INPUT....3-45
FLANGE SEAL - INSTALLATION, OUTPUT . . . 3-46
FLANGE SEAL - REMOVAL, INPUT
........3-44
FLANGE SEAL - REMOVAL, OUTPUT
.......3-45
FLANGE SHIM SELECTION,
ADJUSTMENTS - OUTPUT
...............21-7
FLAP AND SPRING ASSEMBLY -
INSTALLATION, QUAD BUCKET SEAT
SIDE SHIELD/CUPHOLDER
............23-107
FLAP AND SPRING ASSEMBLY -
REMOVAL, QUAD BUCKET SEAT SIDE
SHIELD/CUPHOLDER
.................23-107
FLEX DRIVE - DESCRIPTION
...........8N-36
FLEX DRIVE - INSTALLATION
...........8N-37
FLEX DRIVE - OPERATION
.............8N-36
FLEX DRIVE - REMOVAL
...............8N-37
FLEX PLATE - INSTALLATION
...........9-131
FLEX PLATE - REMOVAL
...............9-131
FLEXIBLE FUEL ENGINE OIL -
DESCRIPTION
.........................0-3
FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - INSTALLATION
............23-83FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - REMOVAL................23-83
FLOOR CONSOLE TRAY - INSTALLATION . . 23-83
FLOOR CONSOLE TRAY - REMOVAL......23-83
FLOOR DISTRIBUTION DUCTS -
INSTALLATION.......................24-50
FLOOR DISTRIBUTION DUCTS -
REMOVAL..........................24-50
FLOOR HEAT DUCT - INSTALLATION,
REAR..............................24-63
FLOOR HEAT DUCT - REMOVAL, REAR . . . 24-62
FLOOR MATS - INSTALLATION, CARPETS . 23-76
FLOOR MATS - REMOVAL, CARPETS.....23-75
FLOW AND PRESSURE TEST -
DIAGNOSIS AND TESTING, POWER
STEERING SYSTEM....................19-1
FLOW CHECK - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-3
FLUID - DESCRIPTION, AUTOMATIC/
MANUAL TRANSAXLE...................0-4
FLUID - DESCRIPTION, AWD POWER
TRANSFER UNIT.......................0-6
FLUID AND FILTER SERVICE -
STANDARD PROCEDURE.......21-203,21s-104
FLUID CAPACITIES - SPECIFICATIONS......0-6
FLUID CHANGE - STANDARD
PROCEDURE, DIFFERENTIAL
ASSEMBLY..........................3-40
FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH
HOUSING............................3-41
FLUID CHANGE - STANDARD
PROCEDURE, PTU......................21-5
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING, BRAKE.............5-32,5s-31
FLUID COOLER - DESCRIPTION.........19-44
FLUID COOLER - INSTALLATION.........19-45
FLUID COOLER - OPERATION...........19-44
FLUID COOLER - REMOVAL............19-44
FLUID DRAIN AND FILL - STANDARD
PROCEDURE........................21-71
FLUID FILL/CHECK LOCATIONS -
DESCRIPTION.........................0-7
FLUID LEAK DIAGNOSIS, DIAGNOSIS
AND TESTING........................21-3
FLUID LEAKAGE - DIAGNOSIS AND
TESTING, TORQUE CONVERTER
HOUSING....................21-123,21s-31
FLUID LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE.......21-201,21s-102
FLUID LEVEL CHECK - STANDARD
PROCEDURE........................21-71
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE..............5-32,5s-31
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING........19-44
FLUID LEVEL INSPECTION - STANDARD
PROCEDURE.........................21-4
FLUID LEVEL SWITCH - DESCRIPTION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - INSTALLATION,
BRAKE.........................5-11,5s-10
FLUID LEVEL SWITCH - INSTALLATION,
WASHER...........................8R-12
FLUID LEVEL SWITCH - OPERATION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - REMOVAL,
BRAKE
.........................5-11,5s-10
FLUID LEVEL SWITCH - REMOVAL,
WASHER
...........................8R-12
FLUID, SPECIFICATIONS - BRAKE
....5-33,5s-32
FLUIDS - DESCRIPTION, AWD REAR
DRIVELINE MODULE
....................0-6
FLUSH MEASUREMENTS -
SPECIFICATIONS, GAP
................23-124
FLYWHEEL - INSTALLATION
.............6-12
FLYWHEEL - REMOVAL
.................6-12
FOG LAMP - DIAGNOSIS AND TESTING,
FRONT
..............................8L-7
FOG LAMP - INSTALLATION, FRONT
.......8L-8
FOG LAMP - REMOVAL, FRONT
..........8L-8
FOG LAMP UNIT ALIGNMENT - EXPORT
- STANDARD PROCEDURE, FRONT
........8L-9
FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE, FRONT
.........8L-9
FOLDAWAY MIRROR SWITCH - EXPORT
- DESCRIPTION, POWER
..............8N-48FOLDAWAY MIRROR SWITCH - EXPORT
- INSTALLATION, POWER..............8N-49
FOLDAWAY MIRROR SWITCH - EXPORT
- OPERATION, POWER................8N-48
FOLDAWAY MIRROR SWITCH - EXPORT
- REMOVAL, POWER..................8N-48
FORK AND SHAFT - DESCRIPTION,
SHIFT.............................21-113
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE . . 9-11,9-84
FRAME DIMENSIONS, SPECIFICATIONS....13-4
FRONT - DESCRIPTION, HALF SHAFT.......3-1
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL.......................9-127,9-40
FRONT - INSTALLATION, HALF SHAFT......3-4
FRONT - INSTALLATION, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - INSTALLATION, SPRING
MOUNTS............................2-44
FRONT - INSTALLATION, WHEEL
MOUNTING STUDS...................22-21
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL..........................9-127,9-40
FRONT - REMOVAL, HALF SHAFT..........3-2
FRONT - REMOVAL, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - REMOVAL, SPRING MOUNTS.....2-43
FRONT - REMOVAL, WHEEL MOUNTING
STUDS.............................22-20
FRONT - SPECIFICATIONS, HALF SHAFT . . . 3-15,
3-6
FRONT BRAKE ROTOR - INSTALLATION.....5-54,
5s-57
FRONT BRAKE ROTOR - REMOVAL . . . 5-54,5s-57
FRONT BUMPER REINFORCEMENT -
INSTALLATION........................13-2
FRONT BUMPER REINFORCEMENT -
REMOVAL...........................13-2
FRONT BUSHING - INSTALLATION, LEAF
SPRING.............................2-30
FRONT BUSHING - REMOVAL, LEAF
SPRING.............................2-29
FRONT CABLE - INSTALLATION.....5-64,5s-67
FRONT CABLE - INSTALLATION,
PARKING BRAKE LEVER...........5-66,5s-69
FRONT CABLE - REMOVAL.........5-64,5s-67
FRONT CABLE - REMOVAL, PARKING
BRAKE LEVER...................5-65,5s-68
FRONT CONTROL MODULE -
DESCRIPTION........................8E-7
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING........................8E-7
FRONT CONTROL MODULE -
INSTALLATION........................8E-8
FRONT CONTROL MODULE - OPERATION . . 8E-7
FRONT CONTROL MODULE - REMOVAL....8E-8
FRONT CRADLE CROSSMEMBER -
DESCRIPTION........................13-9
FRONT CRADLE CROSSMEMBER
THREAD REPAIR - DESCRIPTION
.........13-9
FRONT CROSSMEMBER MOUNT
BUSHINGS - INSTALLATION
............13-12
FRONT CROSSMEMBER MOUNT
BUSHINGS - REMOVAL
................13-12
FRONT DISC BRAKE CALIPER ADAPTER
- INSTALLATION
.................5-31,5s-30
FRONT DISC BRAKE CALIPER ADAPTER
- REMOVAL
.....................5-31,5s-30
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
INSTALLATION
.......................5s-26
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
REMOVAL
..........................5s-23
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - INSTALLATION
.....5-27
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - REMOVAL
.........5-24
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-27
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) - REMOVAL
.......5-24
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - INSTALLATION
..............5s-26
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - REMOVAL
.................5s-23
14 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2558 of 2585

FRONT DISC BRAKE SHOES
(CONTINENTAL TEVES BRAKES) -
INSTALLATION.......................5s-15
FRONT DISC BRAKE SHOES
(CONTINENTAL TEVES BRAKES) -
REMOVAL..........................5s-14
FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - INSTALLATION...............5-16
FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - REMOVAL..................5-14
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - INSTALLATION.........5-17
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - REMOVAL............5-15
FRONT DISC BRAKE SHOES (TRW
BRAKES) - INSTALLATION..............5s-16
FRONT DISC BRAKE SHOES (TRW
BRAKES) - REMOVAL.................5s-14
FRONT DOOR GLASS RUN
WEATHERSTRIP - INSTALLATION.......23-113
FRONT DOOR GLASS RUN
WEATHERSTRIP - REMOVAL...........23-113
FRONT DOOR INNER BELT MOLDING -
INSTALLATION......................23-115
FRONT DOOR INNER BELT MOLDING -
REMOVAL.........................23-115
FRONT DOOR OUTER BELT MOLDING -
INSTALLATION......................23-113
FRONT DOOR OUTER BELT MOLDING -
REMOVAL.........................23-113
FRONT DOOR WEATHERSTRIP -
INSTALLATION......................23-114
FRONT DOOR WEATHERSTRIP -
REMOVAL.........................23-114
FRONT FASCIA - INSTALLATION..........13-1
FRONT FASCIA - REMOVAL..............13-1
FRONT FENDER - INSTALLATION........23-52
FRONT FENDER - REMOVAL............23-52
FRONT FOG LAMP - DIAGNOSIS AND
TESTING............................8L-7
FRONT FOG LAMP - INSTALLATION.......8L-8
FRONT FOG LAMP - REMOVAL...........8L-8
FRONT FOG LAMP UNIT ALIGNMENT -
EXPORT - STANDARD PROCEDURE.......8L-9
FRONT FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE................8L-9
FRONT INBOARD - INSTALLATION, SEAT
BELT BUCKLE.......................8O-12
FRONT INBOARD - REMOVAL, SEAT
BELT BUCKLE.......................8O-12
FRONT MOUNT - INSTALLATION....9-131,9-49
FRONT MOUNT - REMOVAL........9-131,9-49
FRONT SEAT - INSTALLATION...........23-91
FRONT SEAT - REMOVAL..............23-91
FRONT SEAT BACK - INSTALLATION......23-92
FRONT SEAT BACK - REMOVAL.........23-92
FRONT SEAT CUSHION SIDE COVER -
INSTALLATION.......................23-94
FRONT SEAT CUSHION SIDE COVER -
REMOVAL..........................23-94
FRONT SEAT RISER - MANUAL TRACK -
INSTALLATION.......................23-95
FRONT SEAT RISER - MANUAL TRACK -
REMOVAL..........................23-94
FRONT SEAT TRACK - REAR COVER -
INSTALLATION.......................23-96
FRONT SEAT TRACK - REAR COVER -
REMOVAL..........................23-96
FRONT SEAT TRACK MANUAL
ADJUSTER - INSTALLATION............23-95
FRONT SEAT TRACK MANUAL
ADJUSTER - REMOVAL................23-95
FRONT SEAT TRACK POWER ADJUSTER
- INSTALLATION.....................23-95
FRONT SEAT TRACK POWER ADJUSTER
- REMOVAL.........................23-95
FRONT SEATBACK ASSIST STRAP -
INSTALLATION.......................23-92
FRONT SEATBACK ASSIST STRAP -
REMOVAL..........................23-92
FRONT SEATBACK COVER -
INSTALLATION.......................23-93
FRONT SEATBACK COVER - REMOVAL
....23-93
FRONT SEATBACK PANEL -
INSTALLATION
.......................23-93
FRONT SEATBACK PANEL - REMOVAL
....23-92
FRONT SUSPENSION - DESCRIPTION
......2-2
FRONT SUSPENSION - OPERATION
........2-2FRONT SUSPENSION FASTENER
TORQUE, SPECIFICATIONS...............2-3
FRONT SUSPENSION, SPECIAL TOOLS.....2-3
FRONT WASHER PUMP MOTOR -
INSTALLATION.......................8R-8
FRONT WASHER PUMP MOTOR -
REMOVAL...........................8R-8
FRONT WHEEL SPEED SENSOR -
INSTALLATION........................5-80
FRONT WHEEL SPEED SENSOR -
REMOVAL...........................5-79
FRONT WHEELHOUSE SPLASH SHIELD -
INSTALLATION.......................23-55
FRONT WHEELHOUSE SPLASH SHIELD -
REMOVAL..........................23-55
FRONT WIPER ARM ALIGNMENT -
STANDARD PROCEDURE...............8R-8
FRONT WIPER ARMS - INSTALLATION....8R-9
FRONT WIPER ARMS - REMOVAL........8R-9
FRONT WIPER MOTOR - INSTALLATION . . . 8R-9
FRONT WIPER MOTOR - REMOVAL.......8R-9
FRONT WIPER SYSTEM - DIAGNOSIS
AND TESTING........................8R-2
FRONT WIPER/WASHER SWITCH -
DIAGNOSIS AND TESTING..............8R-2
FRONT/QUAD SEAT CUSHION -
INSTALLATION.......................23-93
FRONT/QUAD SEAT CUSHION -
REMOVAL..........................23-93
FRONT-WHEEL-DRIVE - INSTALLATION....2-36
FRONT-WHEEL-DRIVE - REMOVAL........2-36
FUEL CORRECTION OR ADAPTIVE
MEMORIES, OPERATION...............14-20
FUEL DELIVERY - DESCRIPTION..........14-2
FUEL DELIVERY - OPERATION...........14-2
FUEL DELIVERY SYSTEM - DIAGNOSIS
AND TESTING........................14-2
FUEL DOSING PUMP - DESCRIPTION....24-115
FUEL DOSING PUMP - INSTALLATION . . . 24-116
FUEL DOSING PUMP - OPERATION.....24-115
FUEL DOSING PUMP - REMOVAL.......24-115
FUEL ENGINE OIL - DESCRIPTION,
FLEXIBLE.............................0-3
FUEL FILL DOOR - INSTALLATION.......23-52
FUEL FILL DOOR - REMOVAL...........23-52
FUEL FILL DOOR BLOCKER LATCH -
INSTALLATION.......................23-53
FUEL FILL DOOR BLOCKER LATCH -
REMOVAL..........................23-53
FUEL FILL DOOR BLOCKER LATCH
STRIKER - INSTALLATION..............23-53
FUEL FILL DOOR BLOCKER LATCH
STRIKER - REMOVAL.................23-53
FUEL FILL DOOR BLOCKER LOCKOUT
LINK - INSTALLATION.................23-54
FUEL FILL DOOR BLOCKER LOCKOUT
LINK - REMOVAL.....................23-53
FUEL FILLER CAP - DESCRIPTION.......25-12
FUEL FILLER CAP - OPERATION.........25-12
FUEL INJECTOR - DESCRIPTION.........14-26
FUEL INJECTOR - OPERATION..........14-26
FUEL LEVEL SENDING UNIT / SENSOR -
DESCRIPTION........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
INSTALLATION........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
OPERATION..........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
REMOVAL...........................14-5
FUEL LINE - INSTALLATION...........24-118
FUEL LINE - REMOVAL...............24-117
FUEL LINES/HOSES AND CLAMPS -
DESCRIPTION........................14-6
FUEL PRESSURE REGULATOR -
INSTALLATION........................14-7
FUEL PRESSURE REGULATOR -
OPERATION..........................14-7
FUEL PRESSURE REGULATOR -
REMOVAL...........................14-7
FUEL PUMP - DESCRIPTION.............14-8
FUEL PUMP - OPERATION..............14-8
FUEL PUMP MODULE - DESCRIPTION.....14-8
FUEL PUMP MODULE - INSTALLATION....14-9
FUEL PUMP MODULE - OPERATION
.......14-8
FUEL PUMP MODULE - REMOVAL
........14-8
FUEL PUMP RELAY - DESCRIPTION
......14-28
FUEL PUMP RELAY - OPERATION
........14-28
FUEL REQUIREMENTS - DESCRIPTION
......0-4FUEL REQUIREMENTS - DIESEL ENGINE
- DESCRIPTION........................0-6
FUEL, SPECIAL TOOLS............14-23,14-4
FUEL SYSTEM PRESSURE RELEASE
PROCEDURE - STANDARD
PROCEDURE.........................14-2
FUEL SYSTEM PRESSURE,
SPECIFICATIONS......................14-3
FUEL TANK - DESCRIPTION............14-10
FUEL TANK - INSTALLATION............14-12
FUEL TANK - OPERATION..............14-11
FUEL TANK - REMOVAL...............14-11
FUEL TANK - STANDARD PROCEDURE,
DRAINING...........................14-2
FUEL TANK FILLER TUBE -
INSTALLATION.......................14-13
FUEL TANK FILLER TUBE - REMOVAL....14-12
FULL OPEN SWITCH - DESCRIPTION....8N-12,
8N-31
FULL OPEN SWITCH - INSTALLATION....8N-13
FULL OPEN SWITCH - OPERATION . 8N-12,8N-31
FULL OPEN SWITCH - REMOVAL........8N-13
FUNCTIONS - DESCRIPTION, CIRCUIT . . 8W-01-6
FUSE - DESCRIPTION, IOD...........8W-97-3
FUSE - OPERATION, IOD.............8W-97-3
FUSES POWERING SEVERAL LOADS -
STANDARD PROCEDURE, TESTING
FOR A SHORT TO GROUND ON......8W-01-10
FWD - INSTALLATION..................2-45
FWD - INSTALLATION, REAR WHEEL
SPEED SENSOR.......................5-81
FWD - INSTALLATION, SPRING...........2-42
FWD - REMOVAL......................2-45
FWD - REMOVAL, REAR WHEEL SPEED
SENSOR............................5-81
FWD - REMOVAL, SPRING..............2-41
GALLERY PLUGS - STANDARD
PROCEDURE, ENGINE CORE AND OIL . 9-10,9-86
GAP AND FLUSH MEASUREMENTS -
SPECIFICATIONS....................23-124
GAP, SPECIFICATIONS - WHEEL SPEED
SENSOR AIR.........................5-79
GAS - INSTALLATION, MODULAR
CLUTCH ASSY - 2.4L..................6-11
GAS - REMOVAL, MODULAR CLUTCH
ASSY - 2.4L..........................6-11
GASKET - DIAGNOSIS AND TESTING,
CYLINDER HEAD.............9-24,9-99,9s-16
GASKET SURFACE PREPARATION -
STANDARD PROCEDURE, ENGINE....9-11,9-85
GASKETS AND SEALERS - STANDARD
PROCEDURE, FORM-IN-PLACE.......9-11,9-84
GASOLINE ENGINES - DIAGNOSIS AND
TESTING, SYSTEM CHARGE LEVEL
TEST..............................24-67
GEAR - DESCRIPTION.................19-26
GEAR - INSTALLATION, LHD............19-32
GEAR - INSTALLATION, RHD............19-33
GEAR & LINK ROD - DESCRIPTION, LIFT . 8N-16
GEAR & LINK ROD - INSTALLATION,
LIFT...............................8N-16
GEAR & LINK ROD - OPERATION, LIFT . . . 8N-16
GEAR & LINK ROD - REMOVAL, LIFT.....8N-16
GEAR - OPERATION...................19-27
GEAR - REMOVAL, LHD...............19-27
GEAR - REMOVAL, RHD...............19-31
GEAR END PLAY - ADJUSTMENT,
DIFFERENTIAL SIDE..................21-70
GEAR SHIFT CABLE - INSTALLATION....21-205
GEAR SHIFT CABLE - REMOVAL . 21-204,21s-105
GEAR SHIFT LEVER - INSTALLATION.....19-21
GEAR SHIFT LEVER - REMOVAL.........19-21
GEAR, SPECIAL TOOLS - POWER
STEERING..........................19-34
GEARSHIFT BOOT - INSTALLATION......21-73
GEARSHIFT BOOT - REMOVAL..........21-72
GEARSHIFT CABLE - CROSSOVER -
INSTALLATION.......................21-76
GEARSHIFT CABLE - CROSSOVER -
REMOVAL..........................21-73
GEARSHIFT CABLE - SELECTOR -
INSTALLATION
.......................21-84
GEARSHIFT CABLE - SELECTOR -
REMOVAL
..........................21-81
GEARSHIFT CABLE ADJUSTMENT,
ADJUSTMENTS
.....................21-206
GEARSHIFT KNOB - INSTALLATION
......21-87
GEARSHIFT KNOB - REMOVAL
..........21-87
RSINDEX15
Description Group-Page Description Group-Page Description Group-Page
Page 2560 of 2585

HEATED SEAT SWITCH - INSTALLATION,
DRIVER............................8G-10
HEATED SEAT SWITCH - INSTALLATION,
PASSENGER........................8G-14
HEATED SEAT SWITCH - OPERATION,
DRIVER.............................8G-8
HEATED SEAT SWITCH - OPERATION,
PASSENGER........................8G-12
HEATED SEAT SWITCH - REMOVAL,
DRIVER............................8G-10
HEATED SEAT SWITCH - REMOVAL,
PASSENGER........................8G-14
HEATED SEAT SYSTEM - DESCRIPTION....8G-7
HEATED SEAT SYSTEM - DIAGNOSIS
AND TESTING........................8G-8
HEATED SEAT SYSTEM - OPERATION.....8G-8
HEATER - DESCRIPTION, CABIN........24-112
HEATER - DESCRIPTION, ENGINE BLOCK . . . 7-20
HEATER - DIAGNOSIS AND TESTING,
DIESEL SUPPLEMENTAL CABIN........24-113
HEATER - INSTALLATION, ENGINE
BLOCK..............................7-20
HEATER - OPERATION, ENGINE BLOCK....7-20
HEATER - REMOVAL, ENGINE BLOCK......7-20
HEATER AND AIR CONDITIONER -
DESCRIPTION........................24-1
HEATER AND AIR CONDITIONER -
OPERATION..........................24-4
HEATER CONTROL - DESCRIPTION, A/C . . . 24-20
HEATER CONTROL - INSTALLATION, A/C . . 24-21
HEATER CONTROL - REMOVAL, A/C.......24-21
HEATER CORE - DESCRIPTION....24-101,24-83
HEATER CORE - INSTALLATION . . . 24-103,24-85
HEATER CORE - OPERATION......24-101,24-83
HEATER CORE - REMOVAL.......24-102,24-84
HEATER CORE FILLING - STANDARD
PROCEDURE, REAR..................24-101
HEATER CORE TUBES - INSTALLATION . . . 24-85
HEATER CORE TUBES - REMOVAL.......24-83
HEATER HOSES - INSTALLATION.......24-104
HEATER HOSES - REMOVAL...........24-103
HEATER INLET HOSE - INSTALLATION....24-86
HEATER INLET HOSE - REMOVAL........24-85
HEATER LINES - INSTALLATION, REAR . . 24-111
HEATER PERFORMANCE TEST -
DIAGNOSIS AND TESTING.............24-10
HEATER RETURN HOSE - INSTALLATION . . 24-87
HEATER RETURN HOSE - REMOVAL......24-86
HEATER TESTING - DIAGNOSIS AND
TESTING, ENGINE BLOCK...............7-20
HEATER TUBES - REMOVAL,
UNDERBODY.......................24-109
HEATER UNIT - INSTALLATION.........24-119
HEATER UNIT - REMOVAL.............24-118
HEATER WIRING - INSTALLATION,
SUPPLEMENTAL DIESEL..............24-119
HEATER WIRING - REMOVAL,
SUPPLEMENTAL DIESEL..............24-119
HEAVY DUTY, CARGO - INSTALLATION,
AWD ...............................2-36
HEAVY DUTY, CARGO - REMOVAL, AWD . . . 2-36
HEIGHT ADJUSTER-BORC-PILLAR -
INSTALLATION, SEAT BELT.............8O-13
HEIGHT ADJUSTER-BORC-PILLAR -
REMOVAL, SEAT BELT................8O-13
HEIGHT ADJUSTER KNOB -
INSTALLATION, SEAT BELT.............8O-14
HEIGHT ADJUSTER KNOB - REMOVAL,
SEAT BELT .........................8O-14
HEIGHT MEASUREMENT - STANDARD
PROCEDURE, CURB...................2-55
HIGH AND LOW LIMITS - DESCRIPTION . . . 25-8
HIGH MOUNTED STOP LAMP -
INSTALLATION, CENTER................8L-6
HIGH MOUNTED STOP LAMP -
REMOVAL, CENTER....................8L-6
HIGH MOUNTED STOP LAMP UNIT -
INSTALLATION, CENTER................8L-6
HIGH MOUNTED STOP LAMP UNIT -
REMOVAL, CENTER....................8L-6
HIGH PRESSURE RELIEF VALVE -
DESCRIPTION
.......................24-73
HIGH PRESSURE RELIEF VALVE -
OPERATION
.........................24-73
HIGH SPEED OPERATION - STANDARD
PROCEDURE, TIRE PRESSURE
.....22-17,22s-9
HINGE - INSTALLATION
......23-18,23-40,23-60
HINGE - INSTALLATION, CENTER
........23-24HINGE - INSTALLATION, LOWER........23-28
HINGE - INSTALLATION, UPPER.........23-36
HINGE - REMOVAL.........23-17,23-40,23-60
HINGE - REMOVAL, BENCH SEAT BACK . . 23-102
HINGE - REMOVAL, CENTER............23-24
HINGE - REMOVAL, LOWER............23-28
HINGE - REMOVAL, UPPER.............23-36
HINGE COVERS - QUAD BUCKET, 50/50
SPLIT, BENCH - INSTALLATION, SEAT
BACK.............................23-101
HINGE COVERS - QUAD BUCKET, 50/50
SPLIT, BENCH - REMOVAL, SEAT BACK . . 23-101
HOISTING - STANDARD PROCEDURE......0-27
HOLD OPEN LATCH - INSTALLATION.....23-25
HOLD OPEN LATCH - REMOVAL.........23-25
HOLD OPEN LATCH CABLE -
INSTALLATION.......................23-38
HOLD OPEN LATCH CABLE - REMOVAL . . . 23-38
HOLD OPEN LATCH STRIKER -
INSTALLATION.......................23-26
HOLD OPEN LATCH STRIKER -
REMOVAL..........................23-26
HOLDDOWN - DESCRIPTION, BATTERY . . . 8F-15
HOLDDOWN - INSTALLATION, BATTERY . . . 8F-16
HOLDDOWN - OPERATION, BATTERY.....8F-15
HOLDDOWN - REMOVAL, BATTERY . 8F-15,8F-16
HOLDER - INSTALLATION, CUP.........23-64
HOLDER - REMOVAL, CUP.............23-64
HOLDING CLUTCHES - DESCRIPTION . . . 21-207,
21s-106
HOLDING CLUTCHES - OPERATION.....21-207,
21s-106
HOLE REPAIR - DESCRIPTION,
THREADED........................Intro.-5
HONING - STANDARD PROCEDURE,
CYLINDER BORE.................9-112,9-35
HOOD - INSTALLATION................23-61
HOOD - REMOVAL....................23-60
HOOD AJAR SWITCH - EXPORT -
INSTALLATION.......................8Q-3
HOOD AJAR SWITCH - EXPORT -
REMOVAL...........................8Q-3
HORN - DIAGNOSIS AND TESTING.......8H-3
HORN - INSTALLATION.................8H-5
HORN - REMOVAL....................8H-4
HORN CHIRP PREFERENCE - STANDARD
PROCEDURE....................8N-42,8N-5
HORN SWITCH - DESCRIPTION..........8H-5
HORN SYSTEM - DESCRIPTION..........8H-1
HORN SYSTEM - DIAGNOSIS AND
TESTING............................8H-1
HORN SYSTEM - OPERATION............8H-1
HOSE - INSTALLATION, HEATER INLET....24-86
HOSE - INSTALLATION, HEATER RETURN . 24-87
HOSE - REMOVAL, HEATER INLET.......24-85
HOSE - REMOVAL, HEATER RETURN.....24-86
HOSE CLAMPS - DESCRIPTION...........7-1
HOSE CLAMPS - OPERATION.............7-2
HOSES - DESCRIPTION, BRAKE TUBES....5-14,
5s-13
HOSES - INSPECTION, BRAKE TUBES.....5-14,
5s-13
HOSES - INSTALLATION, HEATER.......24-104
HOSES - INSTALLATION, WASHER.......8R-13
HOSES - OPERATION, BRAKE TUBES . 5-14,5s-13
HOSES - REMOVAL, HEATER..........24-103
HOSES - REMOVAL, WASHER..........8R-13
HOSES AND CLAMP - STANDARD
PROCEDURE.........................14-7
HOUSING - INSTALLATION, AIR
CLEANER........................9-24,9-99
HOUSING - INSTALLATION, HVAC........24-61
HOUSING - INSTALLATION, LOCK
CYLINDER..........................19-19
HOUSING - REMOVAL, AIR CLEANER . . 9-24,9-99
HOUSING - REMOVAL, HVAC...........24-60
HOUSING - REMOVAL, LOCK CYLINDER . . 19-17
HOUSING FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH.....3-41
HOUSING FLUID LEAKAGE - DIAGNOSIS
AND TESTING, TORQUE CONVERTER . . . 21-123,
21s-31
HOW TO USE WIRING DIAGRAMS -
DESCRIPTION
.....................8W-01-1
HUB / BEARING - DESCRIPTION
.......2-30,2-4
HUB / BEARING - INSTALLATION
......2-33,2-6
HUB / BEARING - OPERATION
........2-30,2-4
HUB / BEARING - REMOVAL
..........2-31,2-5HUB AND BEARING - DIAGNOSIS AND
TESTING.........................2-31,2-5
HVAC - LWB - INSTALLATION, SEAT
BELT & RETRACTOR - SECOND ROW -
RIGHT OUTBOARD WITH REAR.........8O-16
HVAC - LWB - REMOVAL, SEAT BELT &
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR...............8O-16
HVAC HOUSING - INSTALLATION........24-61
HVAC HOUSING - REMOVAL............24-60
HVAC LOUVER - INSTALLATION, REAR . . . 23-81
HVAC LOUVER - REMOVAL, REAR.......23-81
HYDRAULIC CIRCUITS AND VALVES -
OPERATION..........................5-83
HYDRAULIC LASH ADJUSTER NOISE
DIAGNOSIS - DIAGNOSIS AND
TESTING............................9-34
HYDRAULIC LASH ADJUSTERS -
INSTALLATION........................9-34
HYDRAULIC LASH ADJUSTERS -
REMOVAL...........................9-34
HYDRAULIC LIFTERS - DIAGNOSIS AND
TESTING...........................9-113
HYDRAULIC LIFTERS (CAM IN BLOCK) -
DESCRIPTION.......................9-113
HYDRAULIC LIFTERS (CAM IN BLOCK) -
INSTALLATION.......................9-114
HYDRAULIC LIFTERS (CAM IN BLOCK) -
REMOVAL..........................9-114
HYDRAULIC PRESSURE TESTS -
DIAGNOSIS AND TESTING.......21-120,21s-28
HYDRAULIC SCHEMATICS, SCHEMATICS
AND DIAGRAMS - 41TE TRANSAXLE....21-169
HYDRAULIC SCHEMATICS, SCHEMATICS
AND DIAGRAMS - 4XTE TRANSAXLE....21s-75
HYDROSTATIC LOCKED ENGINE -
STANDARD PROCEDURE............9-10,9-85
ICU - ASSEMBLY......................5-94
ICU - DISASSEMBLY...................5-93
ICU (INTEGRATED CONTROL UNIT) -
DESCRIPTION........................5-89
ICU (INTEGRATED CONTROL UNIT) -
OPERATION..........................5-90
IDENTIFICATION - DESCRIPTION,
FASTENER.........................Intro.-2
IDENTIFICATION - DESCRIPTION,
VEHICLE............................23-1
IDENTIFICATION AND INFORMATION -
DESCRIPTION, SECTION.............8W-01-6
IDENTIFICATION, DIAGNOSIS AND
TESTING - SEAL......................21-3
IDENTIFICATION NUMBER -
DESCRIPTION, VEHICLE..............Intro.-9
IDLE AIR CONTROL MOTOR -
DESCRIPTION.......................14-28
IDLE AIR CONTROL MOTOR -
INSTALLATION.......................14-29
IDLE AIR CONTROL MOTOR -
OPERATION.........................14-28
IDLE AIR CONTROL MOTOR - REMOVAL . . 14-29
IGNITION COIL - DESCRIPTION...........8I-6
IGNITION COIL - OPERATION.............8I-7
IGNITION INTERLOCK - DESCRIPTION....19-17
IGNITION SENSE - PCM INPUT -
OPERATION.........................8E-15
IGNITION SWITCH - INSTALLATION......19-16
IGNITION SWITCH - REMOVAL..........19-14
IGNITION SYSTEM - DESCRIPTION........8I-1
IGNITION SYSTEM - OPERATION..........8I-1
IGNITION-OFF DRAW TEST - STANDARD
PROCEDURE........................8F-13
IIITSTATE DISPLAY TEST MODE,
OPERATION - DRB....................25-9
ILLUMINATION LAMPS - INSTALLATION,
CLUSTER...........................8L-21
ILLUMINATION LAMPS - REMOVAL,
CLUSTER...........................8L-21
IMMOBILIZER MODULE - DESCRIPTION,
SENTRY KEY
........................8E-18
IMMOBILIZER MODULE - INSTALLATION,
SENTRY KEY
........................8E-19
IMMOBILIZER MODULE - OPERATION,
SENTRY KEY
........................8E-18
IMMOBILIZER MODULE - REMOVAL,
SENTRY KEY
........................8E-18
INBOARD - 50/50 BENCH -
INSTALLATION, SEAT BELT BUCKLE -
SECOND ROW
.......................8O-13
RSINDEX17
Description Group-Page Description Group-Page Description Group-Page
Page 2562 of 2585

KEY REMOTE ENTRY MODULE -
INSTALLATION, SENTRY................8Q-6
KEY REMOTE ENTRY MODULE -
OPERATION, SENTRY..................8Q-4
KEY REMOTE ENTRY MODULE -
REMOVAL, SENTRY...................8Q-5
KEY REMOTE ENTRY SYSTEM -
DIAGNOSIS AND TESTING, SENTRY.......8Q-3
KEYLESS ENTRY MODULE -
DESCRIPTION, REMOTE...............8N-43
KEYLESS ENTRY MODULE - DIAGNOSIS
AND TESTING, REMOTE...............8N-43
KEYLESS ENTRY MODULE -
INSTALLATION, REMOTE..............8N-44
KEYLESS ENTRY MODULE - OPERATION,
REMOTE...........................8N-43
KEYLESS ENTRY MODULE - REMOVAL,
REMOTE...........................8N-44
KEYLESS ENTRY TRANSMITTER -
DIAGNOSIS AND TESTING.........8N-42,8N-5
KEYLESS ENTRY TRANSMITTER
PROGRAMMING - STANDARD
PROCEDURE, REMOTE.................8N-5
KEY/LOCK CYLINDER - DESCRIPTION....19-20
KEY/LOCK CYLINDER - INSTALLATION....19-20
KEY/LOCK CYLINDER - OPERATION......19-20
KEY/LOCK CYLINDER - REMOVAL.......19-20
KNOB - INSTALLATION, GEARSHIFT......21-87
KNOB - INSTALLATION, SEAT BELT
HEIGHT ADJUSTER...................8O-14
KNOB - REMOVAL, GEARSHIFT..........21-87
KNOB - REMOVAL, SEAT BELT HEIGHT
ADJUSTER.........................8O-14
KNOCK SENSOR - DESCRIPTION..........8I-8
KNOCK SENSOR - OPERATION...........8I-8
KNUCKLE - DESCRIPTION................2-6
KNUCKLE - INSPECTION, STEERING........2-9
KNUCKLE - INSTALLATION, STEERING......2-9
KNUCKLE - OPERATION.................2-7
KNUCKLE - REMOVAL, STEERING.........2-7
LABEL - DESCRIPTION, E-MARK......Intro.-11
LABEL - DESCRIPTION, VECI.........Intro.-11
LABEL - DESCRIPTION, VEHICLE
CERTIFICATION....................Intro.-11
LABEL - DESCRIPTION, VEHICLE
EMISSION CONTROL INFORMATION.......25-1
LAMP - DESCRIPTION, VTSS/SKIS
INDICATOR..........................8Q-7
LAMP - DIAGNOSIS AND TESTING,
FRONT FOG..........................8L-7
LAMP - INSTALLATION, CENTER
CONSOLE...........................8L-21
LAMP - INSTALLATION, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - INSTALLATION, COURTESY......8L-21
LAMP - INSTALLATION, DOME/CARGO....8L-22
LAMP - INSTALLATION, FRONT FOG.......8L-8
LAMP - INSTALLATION, LICENSE........8L-17
LAMP - INSTALLATION, LIFTGATE.......8L-22
LAMP - INSTALLATION, PARK/TURN
SIGNAL............................8L-18
LAMP - INSTALLATION, READING........8L-23
LAMP - INSTALLATION, TAIL...........8L-19
LAMP - INSTALLATION, VANITY.........8L-24
LAMP - OPERATION, VTSS/SKIS
INDICATOR..........................8Q-8
LAMP - REMOVAL, CENTER CONSOLE....8L-21
LAMP - REMOVAL, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - REMOVAL, COURTESY..........8L-21
LAMP - REMOVAL, DOME/CARGO.......8L-22
LAMP - REMOVAL, FRONT FOG..........8L-8
LAMP - REMOVAL, LICENSE............8L-17
LAMP - REMOVAL, LIFTGATE...........8L-22
LAMP - REMOVAL, PARK/TURN SIGNAL . . 8L-18
LAMP - REMOVAL, READING...........8L-23
LAMP - REMOVAL, TAIL...............8L-18
LAMP - REMOVAL, VANITY.............8L-24
LAMP REPLACEMENT - STANDARD
PROCEDURE, MODULE................8M-3
LAMP REPLACEMENT - STANDARD
PROCEDURE, READING/COURTESY
.......8M-3
LAMP SWITCH - DESCRIPTION, BRAKE
....8L-4
LAMP SWITCH - DIAGNOSIS AND
TESTING, BRAKE
......................8L-4
LAMP SWITCH - INSTALLATION,
BACK-UP
...........................21-62
LAMP SWITCH - INSTALLATION, BRAKE
. . . 8L-5LAMP SWITCH - INSTALLATION, CENTER
CONSOLE...........................8L-21
LAMP SWITCH - INSTALLATION, GLOVE
BOX ...............................8L-22
LAMP SWITCH - OPERATION, BRAKE......8L-4
LAMP SWITCH - REMOVAL, BACK-UP....21-62
LAMP SWITCH - REMOVAL, BRAKE.......8L-5
LAMP SWITCH - REMOVAL, CENTER
CONSOLE...........................8L-21
LAMP SWITCH - REMOVAL, GLOVE BOX . . 8L-22
LAMP UNIT - INSTALLATION, CENTER
HIGH MOUNTED STOP.................8L-6
LAMP UNIT - INSTALLATION, TAIL.......8L-19
LAMP UNIT - REMOVAL, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP UNIT - REMOVAL, TAIL...........8L-19
LAMP UNIT ALIGNMENT - EXPORT -
STANDARD PROCEDURE, FRONT FOG.....8L-9
LAMP UNIT ALIGNMENT - STANDARD
PROCEDURE, FRONT FOG...............8L-9
LAMPS - INSTALLATION, CLUSTER
ILLUMINATION......................8L-21
LAMPS - REMOVAL, CLUSTER
ILLUMINATION......................8L-21
LAMPS, SPECIFICATIONS - EXTERIOR.....8L-3
LAMPS, SPECIFICATIONS - INTERIOR....8L-20
LAMPS/LIGHTING - EXTERIOR -
DESCRIPTION........................8L-2
LAMPS/LIGHTING - EXTERIOR -
OPERATION..........................8L-2
LAMPS/LIGHTING - EXTERIOR -
WARNING...........................8L-3
LASH ADJUSTER NOISE DIAGNOSIS -
DIAGNOSIS AND TESTING, HYDRAULIC....9-34
LASH ADJUSTERS - INSTALLATION,
HYDRAULIC..........................9-34
LASH ADJUSTERS - REMOVAL,
HYDRAULIC..........................9-34
LATCH - DESCRIPTION...........8N-13,8N-29
LATCH - INSTALLATION.....23-18,23-41,23-61
LATCH - INSTALLATION..........8N-14,8N-29
LATCH - INSTALLATION, FUEL FILL
DOOR BLOCKER.....................23-53
LATCH - INSTALLATION, GLOVE BOX.....23-64
LATCH - INSTALLATION, HOLD OPEN.....23-25
LATCH / LOCK ASSEMBLY -
INSTALLATION.......................23-27
LATCH / LOCK ASSEMBLY - REMOVAL....23-26
LATCH - OPERATION............8N-13,8N-29
LATCH - REMOVAL.........23-18,23-41,23-61
LATCH - REMOVAL..............8N-13,8N-29
LATCH - REMOVAL, FUEL FILL DOOR
BLOCKER...........................23-53
LATCH - REMOVAL, GLOVE BOX.........23-64
LATCH - REMOVAL, HOLD OPEN........23-25
LATCH ACTUATOR - DESCRIPTION......8N-14
LATCH ACTUATOR - INSTALLATION......8N-14
LATCH ACTUATOR - OPERATION........8N-14
LATCH ACTUATOR - REMOVAL..........8N-14
LATCH CABLE - INSTALLATION, HOLD
OPEN..............................23-38
LATCH CABLE - REMOVAL, HOLD OPEN . . . 23-38
LATCH HANDLE - INSTALLATION, INSIDE . . 23-34
LATCH HANDLE - REMOVAL, INSIDE.....23-34
LATCH LOCKING LINK - INSTALLATION,
SEAT RISER........................23-106
LATCH LOCKING LINK - REMOVAL, SEAT
RISER
............................23-106
LATCH RELEASE CABLE - INSTALLATION
. . 23-62
LATCH RELEASE CABLE - REMOVAL
.....23-61
LATCH STRIKER - INSTALLATION
. . 23-19,23-41,
23-62
LATCH STRIKER - INSTALLATION, FUEL
FILL DOOR BLOCKER
.................23-53
LATCH STRIKER - INSTALLATION, GLOVE
BOX
...............................23-64
LATCH STRIKER - INSTALLATION, HOLD
OPEN
..............................23-26
LATCH STRIKER - INSTALLATION, REAR
. . 23-29
LATCH STRIKER - REMOVAL
. 23-19,23-41,23-62
LATCH STRIKER - REMOVAL, FUEL FILL
DOOR BLOCKER
.....................23-53
LATCH STRIKER - REMOVAL, GLOVE
BOX
...............................23-64
LATCH STRIKER - REMOVAL, HOLD
OPEN
..............................23-26
LATCH STRIKER - REMOVAL, REAR
......23-29LEAD - DIAGNOSIS AND TESTING,
TIRE/VEHICLE..................22-14,22s-6
LEAF SPRING FRONT BUSHING -
INSTALLATION........................2-30
LEAF SPRING FRONT BUSHING -
REMOVAL...........................2-29
LEAK DETECTION ASSY - INSTALLATION,
NATURAL VAC.......................25-13
LEAK DETECTION ASSY - REMOVAL,
NATURAL VAC.......................25-13
LEAK DETECTION PUMP - INSTALLATION . 25-13
LEAK DETECTION PUMP - REMOVAL.....25-13
LEAK DIAGNOSIS, DIAGNOSIS AND
TESTING - FLUID......................21-3
LEAK INSPECTION - DIAGNOSIS AND
TESTING, ENGINE OIL...............9-8,9-82
LEAK REPAIRING - STANDARD
PROCEDURE, TIRE..............22-17,22s-9
LEAK TEST - DIAGNOSIS AND TESTING,
COOLING SYSTEM.....................7-2
LEAKAGE - DIAGNOSIS AND TESTING,
TORQUE CONVERTER HOUSING FLUID . . 21-123,
21s-31
LEAKAGE TEST - DIAGNOSIS AND
TESTING, CYLINDER COMBUSTION
PRESSURE.......................9-83,9-9
LEAKS - DIAGNOSIS AND TESTING,
INTAKE MANIFOLD...............9-145,9-58
LEAKS - DIAGNOSIS AND TESTING,
REFRIGERANT SYSTEM...............24-66
LEAKS - DIAGNOSIS AND TESTING,
WATER .............................23-1
LEARN CYCLE - STANDARD
PROCEDURE, POWER DOOR.............8N-28
LEARN CYCLE - STANDARD
PROCEDURE, POWER LIFTGATE..........8N-9
LEARN PROCEDURE - STANDARD
PROCEDURE, QUICK.............8E-16,8E-23
LEFT - CLEANING, EXHAUST MANIFOLD . . 9-152
LEFT - INSPECTION, EXHAUST
MANIFOLD..........................9-152
LEFT - INSTALLATION, CYLINDER HEAD
COVER.............................9-103
LEFT - INSTALLATION, EXHAUST
MANIFOLD..........................9-152
LEFT - REMOVAL, CYLINDER HEAD
COVER.............................9-103
LEFT - REMOVAL, EXHAUST MANIFOLD . . . 9-152
LEFT B-PILLAR SWITCH - DESCRIPTION . . 8N-32
LEFT B-PILLAR SWITCH - INSTALLATION . 8N-32
LEFT B-PILLAR SWITCH - OPERATION....8N-32
LEFT B-PILLAR SWITCH - REMOVAL.....8N-32
LEFT D-PILLAR TRIM PANEL -
INSTALLATION.......................23-78
LEFT D-PILLAR TRIM PANEL - REMOVAL . 23-78
LEFT MOUNT - INSTALLATION......9-133,9-50
LEFT MOUNT - REMOVAL..........9-133,9-49
LEFT OUTBOARD - INSTALLATION, SEAT
BELT & RETRACTOR - SECOND ROW....8O-17
LEFT OUTBOARD - REMOVAL, SEAT
BELT & RETRACTOR - SECOND ROW....8O-17
LEFT QUARTER TRIM PANEL -
INSTALLATION.......................23-80
LEFT QUARTER TRIM PANEL - REMOVAL
. 23-80
LENS - INSTALLATION, CLUSTER
........8J-10
LENS - REMOVAL, CLUSTER
............8J-10
LEVEL - STANDARD PROCEDURE,
CHECKING BATTERY ELECTROLYTE
......8F-14
LEVEL - STANDARD PROCEDURE,
REFRIGERANT OIL
...................24-93
LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE - FLUID
......21-201,
21s-102
LEVEL CHECK - STANDARD
PROCEDURE, COOLANT
.................7-5
LEVEL CHECK - STANDARD
PROCEDURE, ENGINE OIL
..............9-137
LEVEL CHECK - STANDARD
PROCEDURE, FLUID
..................21-71
LEVEL CHECK, STANDARD PROCEDURE
- ENGINE OIL
........................9-53
LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE FLUID
........5-32,5s-31
LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING FLUID
. . . 19-44
LEVEL INSPECTION - STANDARD
PROCEDURE, FLUID
...................21-4
RSINDEX19
Description Group-Page Description Group-Page Description Group-Page
Page 2563 of 2585

LEVEL SENDING UNIT / SENSOR -
DESCRIPTION, FUEL...................14-5
LEVEL SENDING UNIT / SENSOR -
INSTALLATION, FUEL..................14-5
LEVEL SENDING UNIT / SENSOR -
OPERATION, FUEL.....................14-5
LEVEL SENDING UNIT / SENSOR -
REMOVAL, FUEL......................14-5
LEVEL SWITCH - DESCRIPTION, BRAKE
FLUID..........................5-10,5s-9
LEVEL SWITCH - INSTALLATION, BRAKE
FLUID..........................5-11,5s-10
LEVEL SWITCH - INSTALLATION,
WASHER FLUID.....................8R-12
LEVEL SWITCH - OPERATION, BRAKE
FLUID..........................5-10,5s-9
LEVEL SWITCH - REMOVAL, BRAKE
FLUID..........................5-11,5s-10
LEVEL SWITCH - REMOVAL, WASHER
FLUID.............................8R-12
LEVEL TEST - 2.5L DIESEL - DIAGNOSIS
AND TESTING, SYSTEM CHARGE........24-68
LEVEL TEST - GASOLINE ENGINES -
DIAGNOSIS AND TESTING, SYSTEM
CHARGE............................24-67
LEVER - INSTALLATION, GEAR SHIFT.....19-21
LEVER - PARKING BRAKE -
INSTALLATION...................5-65,5s-67
LEVER - PARKING BRAKE - REMOVAL....5-64,
5s-67
LEVER - REMOVAL, GEAR SHIFT........19-21
LEVER AND BEARING - INSTALLATION,
CLUTCH RELEASE......................6-7
LEVER AND BEARING - REMOVAL,
CLUTCH RELEASE......................6-6
LEVER AND FRONT CABLE -
INSTALLATION, PARKING BRAKE....5-66,5s-69
LEVER AND FRONT CABLE - REMOVAL,
PARKING BRAKE.................5-65,5s-68
LHD - INSTALLATION.....5-38,5-46,5-94,5s-37,
5s-49
LHD - INSTALLATION, MASTER
CYLINDER...........................6-10
LHD - REMOVAL....5-36,5-42,5-90,5s-35,5s-45
LHD - REMOVAL, MASTER CYLINDER......6-9
LHD GEAR - INSTALLATION............19-32
LHD GEAR - REMOVAL................19-27
LICENSE LAMP - INSTALLATION.........8L-17
LICENSE LAMP - REMOVAL............8L-17
LIFT GEAR & LINK ROD - DESCRIPTION . . 8N-16
LIFT GEAR & LINK ROD - INSTALLATION . 8N-16
LIFT GEAR & LINK ROD - OPERATION....8N-16
LIFT GEAR & LINK ROD - REMOVAL.....8N-16
LIFTERS - DIAGNOSIS AND TESTING,
HYDRAULIC.........................9-113
LIFTERS (CAM IN BLOCK) -
DESCRIPTION, HYDRAULIC.............9-113
LIFTERS (CAM IN BLOCK) -
INSTALLATION, HYDRAULIC............9-114
LIFTERS (CAM IN BLOCK) - REMOVAL,
HYDRAULIC.........................9-114
LIFTGATE - INSTALLATION.............23-42
LIFTGATE - REMOVAL.................23-42
LIFTGATE ADJUSTMENT - STANDARD
PROCEDURE.........................8N-9
LIFTGATE CONTROL MODULE -
DESCRIPTION, POWER................8E-10
LIFTGATE CONTROL MODULE -
INSTALLATION, POWER...............8E-11
LIFTGATE CONTROL MODULE -
OPERATION, POWER..................8E-11
LIFTGATE CONTROL MODULE -
REMOVAL, POWER...................8E-11
LIFTGATE LAMP - INSTALLATION
........8L-22
LIFTGATE LAMP - REMOVAL
............8L-22
LIFTGATE LEARN CYCLE - STANDARD
PROCEDURE, POWER
..................8N-9
LIFTGATE MOTOR - DESCRIPTION
.......8N-15
LIFTGATE MOTOR - INSTALLATION
......8N-15
LIFTGATE MOTOR - OPERATION
.........8N-15
LIFTGATE MOTOR - REMOVAL
..........8N-15
LIFTGATE SIDE - INSTALLATION
.........23-44
LIFTGATE SIDE - REMOVAL
............23-44
LIFTGATE SILL PLATE - INSTALLATION
. . . 23-79
LIFTGATE SILL PLATE - REMOVAL
.......23-79
LIFTGATE SPOILER - INSTALLATION
......23-42
LIFTGATE SPOILER - REMOVAL
.........23-42LIFTGATE SYSTEM - DESCRIPTION,
POWER.............................8N-2
LIFTGATE SYSTEM - DIAGNOSIS AND
TESTING, POWER.....................8N-4
LIFTGATE SYSTEM - OPERATION,
POWER.............................8N-3
LIMITS - DESCRIPTION, HIGH AND LOW . . . 25-8
LINE - DESCRIPTION, REFRIGERANT.....24-65
LINE - INSTALLATION, A/C DISCHARGE . . . 24-80
LINE - INSTALLATION, FUEL...........24-118
LINE - INSTALLATION, LIQUID....24-105,24-90
LINE - INSTALLATION, SUCTION . . . 24-107,24-95
LINE - REMOVAL, A/C DISCHARGE.......24-79
LINE - REMOVAL, FUEL...............24-117
LINE - REMOVAL, LIQUID........24-104,24-88
LINE - REMOVAL, SUCTION......24-106,24-94
LINE AND TERMINAL REPAIR -
STANDARD PROCEDURE, GRID..........8G-4
LINE EXTENSION - INSTALLATION, REAR
A/C EVAPORATOR....................24-99
LINE EXTENSION - REMOVAL, A/C
EVAPORATOR.......................24-98
LINES - DESCRIPTION, OIL COOLER.....9-138
LINES - DESCRIPTION, UNDERBODY....24-107
LINES - INSTALLATION, OIL COOLER.....9-138
LINES - INSTALLATION, REAR HEATER . . 24-111
LINES - INSTALLATION, TRANSMISSION
OIL COOLER.........................7-38
LINES - INSTALLATION, UNDERBODY
REFRIGERANT......................24-111
LINES - OPERATION, OIL COOLER.......9-138
LINES - OPERATION, REFRIGERANT......24-65
LINES - OPERATION, UNDERBODY......24-107
LINES - REMOVAL, OIL COOLER........9-138
LINES - REMOVAL, TRANSMISSION OIL
COOLER.............................7-38
LINES - REMOVAL, UNDERBODY
REFRIGERANT......................24-110
LINES/HOSES AND CLAMPS -
DESCRIPTION, FUEL...................14-6
LINING - INSPECTION, REAR DRUM
BRAKE SHOE....................5-22,5s-21
LINK - DESCRIPTION, TRD............21-249
LINK - INSTALLATION, FUEL FILL DOOR
BLOCKER LOCKOUT..................23-54
LINK - INSTALLATION, SEAT RISER
LATCH LOCKING....................23-106
LINK - OPERATION, TRD..............21-249
LINK - REMOVAL, FUEL FILL DOOR
BLOCKER LOCKOUT..................23-53
LINK - REMOVAL, SEAT RISER LATCH
LOCKING..........................23-106
LINK CONNECTOR - DESCRIPTION, DATA . . 8E-6
LINK CONNECTOR - OPERATION, DATA....8E-7
LINK ROD - DESCRIPTION, LIFT GEAR . . . 8N-16
LINK ROD - INSTALLATION, LIFT GEAR . . . 8N-16
LINK ROD - OPERATION, LIFT GEAR.....8N-16
LINK ROD - REMOVAL, LIFT GEAR.......8N-16
LINKAGE - INSTALLATION, WIPER.......8R-14
LINKAGE - REMOVAL, WIPER...........8R-14
LIQUID LINE - INSTALLATION.....24-105,24-90
LIQUID LINE - REMOVAL........24-104,24-88
LOADS - STANDARD PROCEDURE,
TESTING FOR A SHORT TO GROUND
ON FUSES POWERING SEVERAL.....8W-01-10
LOCATION - DESCRIPTION, CONNECTOR/
GROUND/SPLICE...................8W-91-1
LOCATIONS - DESCRIPTION, FLUID
FILL/CHECK...........................0-7
LOCATIONS - SPECIFICATIONS, BODY
SEALING..........................23-130
LOCATIONS - SPECIFICATIONS,
STRUCTURAL ADHESIVE..............23-156
LOCATIONS - SPECIFICATIONS, WELD . . . 23-166
LOCK ASSEMBLY - INSTALLATION,
LATCH .............................23-27
LOCK ASSEMBLY - REMOVAL, LATCH....23-26
LOCK CYLINDER - INSTALLATION . . 23-19,23-42
LOCK CYLINDER - REMOVAL......23-19,23-42
LOCK CYLINDER HOUSING -
INSTALLATION
.......................19-19
LOCK CYLINDER HOUSING - REMOVAL
. . . 19-17
LOCK MOTOR - DIAGNOSIS AND
TESTING, DOOR
.................8N-4,8N-41
LOCK MOTOR - INSTALLATION, SLIDING
DOOR
.........................8N-44,8N-6
LOCK MOTOR - REMOVAL, SLIDING
DOOR
.........................8N-44,8N-6LOCK SWITCH - DESCRIPTION, DOOR
CYLINDER..........................8N-40
LOCK SWITCH - DIAGNOSIS AND
TESTING, DOOR.................8N-4,8N-41
LOCK SWITCH - DIAGNOSIS AND
TESTING, DOOR CYLINDER............8N-40
LOCK SWITCH - EXPORT -
DESCRIPTION, DOOR CYLINDER.........8N-3
LOCK SWITCH - EXPORT - DIAGNOSIS
AND TESTING, DOOR CYLINDER.........8N-3
LOCK SWITCH - EXPORT -
INSTALLATION, DOOR CYLINDER.........8N-4
LOCK SWITCH - EXPORT - OPERATION,
DOOR CYLINDER.....................8N-3
LOCK SWITCH - EXPORT - REMOVAL,
DOOR CYLINDER.....................8N-3
LOCK SWITCH - INSTALLATION, DOOR....8N-4,
8N-42
LOCK SWITCH - INSTALLATION, DOOR
CYLINDER..........................8N-41
LOCK SWITCH - OPERATION, DOOR
CYLINDER..........................8N-40
LOCK SWITCH - REMOVAL, DOOR . . 8N-4,8N-42
LOCK SWITCH - REMOVAL, DOOR
CYLINDER..........................8N-41
LOCKED ENGINE - STANDARD
PROCEDURE, HYDROSTATIC.........9-10,9-85
LOCKING LINK - INSTALLATION, SEAT
RISER LATCH......................23-106
LOCKING LINK - REMOVAL, SEAT RISER
LATCH ............................23-106
LOCK/LATCH - INSTALLATION, UNDER
SEAT STORAGE BIN.................23-105
LOCK/LATCH - REMOVAL, UNDER SEAT
STORAGE BIN......................23-105
LOCKOUT LINK - INSTALLATION, FUEL
FILL DOOR BLOCKER.................23-54
LOCKOUT LINK - REMOVAL, FUEL FILL
DOOR BLOCKER.....................23-53
LOCKS - DESCRIPTION, POWER....8N-1,8N-38
LOCKS - OPERATION, POWER......8N-2,8N-39
LOUVER - INSTALLATION, REAR HVAC . . . 23-81
LOUVER - REMOVAL, REAR HVAC.......23-81
LOW LIMITS - DESCRIPTION, HIGH.......25-8
LOWER - CLEANING, INTAKE MANIFOLD . . 9-148
LOWER - INSPECTION, INTAKE
MANIFOLD......................9-148,9-60
LOWER - INSTALLATION, INTAKE
MANIFOLD...........................9-60
LOWER - INSTALLATION, SHROUD.......19-22
LOWER - REMOVAL, INTAKE MANIFOLD . . . 9-60
LOWER - REMOVAL, SHROUD..........19-21
LOWER BALL JOINT - DESCRIPTION......2-10
LOWER BALL JOINT - DIAGNOSIS AND
TESTING............................2-10
LOWER BALL JOINT - OPERATION........2-10
LOWER CONSOLE - INSTALLATION......23-69
LOWER CONSOLE - REMOVAL..........23-69
LOWER CONTROL ARM - DESCRIPTION . . . 2-12
LOWER CONTROL ARM - INSPECTION.....2-14
LOWER CONTROL ARM - INSTALLATION . . . 2-16
LOWER CONTROL ARM - OPERATION.....2-12
LOWER CONTROL ARM - REMOVAL......2-12
LOWER CONTROL ARM (REAR BUSHING
- HYDRO) - ASSEMBLY.................2-14
LOWER CONTROL ARM (REAR BUSHING
- HYDRO) - DISASSEMBLY..............2-14
LOWER CONTROL ARM (REAR BUSHING
- STANDARD) - ASSEMBLY..............2-14
LOWER CONTROL ARM (REAR BUSHING
- STANDARD) - DISASSEMBLY...........2-13
LOWER DRIVE UNIT - DESCRIPTION.....8N-32
LOWER DRIVE UNIT - INSTALLATION....8N-33
LOWER DRIVE UNIT - OPERATION.......8N-32
LOWER DRIVE UNIT - REMOVAL........8N-33
LOWER DRIVE UNIT TRACK & RACK -
DESCRIPTION.......................8N-34
LOWER DRIVE UNIT TRACK & RACK -
INSTALLATION......................8N-34
LOWER DRIVE UNIT TRACK & RACK -
OPERATION
.........................8N-34
LOWER DRIVE UNIT TRACK & RACK -
REMOVAL
..........................8N-34
LOWER EXTENSION TRIM -
INSTALLATION, A-PILLAR
..............23-74
LOWER EXTENSION TRIM - REMOVAL,
A-PILLAR
...........................23-74
LOWER HINGE - INSTALLATION
.........23-28
20 INDEXRS
Description Group-Page Description Group-Page Description Group-Page