brake piston CHRYSLER VOYAGER 2004 Repair Manual
[x] Cancel search | Manufacturer: CHRYSLER, Model Year: 2004, Model line: VOYAGER, Model: CHRYSLER VOYAGER 2004Pages: 2585, PDF Size: 62.54 MB
Page 292 of 2585

INSTALLATION
INSTALLATION - LHD
(1) Position power brake booster on dash panel
using the reverse procedure of its removal (Fig. 70).
It may be necessary to push in on booster input rod
as it is guided through the dash panel. (2) Install the four nuts mounting the booster to
the dash panel (Fig. 69). Tighten the mounting nuts
to a torque of 29 N´m (250 in. lbs.). (3) Using lubriplate, or equivalent, coat the sur-
face of the brake pedal pin where it contacts the
booster input rod.
CAUTION: When installing the brake pedal pin on
the power brake booster input rod, do not re-use
the old retaining clip.
(4) Install booster input rod on brake pedal pin
and install a NEW retaining clip (Fig. 76).
CAUTION: Do not reuse the original brake lamp
switch. The switch can only be adjusted once. That
is during initial installation of the switch. If the
switch is not adjusted properly or has been
removed for some service, a new switch must be
installed and adjusted.
(5) Remove and replace the brake lamp switch
with a NEW switch. (Refer t o 8 - ELECTRICAL/
LAMPS/LIGHTING - EXTERIOR/BRAKE LAMP
SWITCH - REMOVAL), (Refer t o 8 - ELECTRICAL/
LAMPS/LIGHTING - EXTERIOR/BRAKE LAMP
SWITCH - INSTALLATION) (6) Install the silencer panel below the steering
column. (7) Connect vacuum hose to check valve on power
brake booster.
CAUTION: The master cylinder (and its rear seal) is
used to create the seal for holding vacuum in the
vacuum booster. The vacuum seal on the master
cylinder MUST be replaced with a NEW seal when-
ever the master cylinder is removed from the vac-
uum booster.
CAUTION: When removing the vacuum seal from
the master cylinder do not use a sharp tool.
(8) Using a soft tool such as a trim stick, remove
the vacuum seal from the master cylinder mounting
flange. (9) Install a NEW vacuum seal on rear mounting
flange of the master cylinder (Fig. 77).
(10) Position master cylinder on studs of booster,
aligning push rod on booster with master cylinder
piston. (11) Install the two nuts mounting the master cyl-
inder to the booster (Fig. 67). Tighten both mounting
nuts to a torque of 25 N´m (225 in. lbs.). (12) Connect wiring harness connector to brake
fluid level switch in the master cylinder fluid reser-
voir (Fig. 66). (13) Connect primary and secondary brake tubes
to ABS ICU or non-ABS junction block (Fig. 67).
Tighten the tube nuts to 17 N´m (145 in lbs.). (14) Install wiper module (unit). (Refer to 8 -
ELECTRICAL/WIPERS/WASHERS/WIPER MOD-
ULE - INSTALLATION) (15) If equipped with speed control, install speed
control servo and connect wiring connector. Tighten
Fig. 76 Retaining Pin Installed On Brake Pedal Pin
1 - BRAKE PEDAL
2 - RETAINING CLIP
3 - BOOSTER INPUT ROD
Fig. 77 Vacuum Seal (Typical)
1 - MASTER CYLINDER ASSEMBLY
2 - VACUUM SEAL
RS BRAKES5s-49
POWER BRAKE BOOSTER (Continued)
Page 293 of 2585

the mounting nuts to a torque of 14 N´m (124 in.
lbs.).(16) Install the battery tray. Install the two nuts
and one bolt attaching the battery tray to the vehicle.
Tighten the bolt and nuts to a torque of 14 N´m (124
in. lbs.). (17) If vehicle is equipped with speed control, con-
nect the servo vacuum hose to the vacuum tank on
the battery tray. (18) Install the air inlet resonator and hoses as an
assembly on the throttle body and air cleaner hous-
ing. Securely tighten hose clamp at air cleaner hous-
ing and throttle body. (19) Secure the engine coolant filler neck to the
battery tray with its mounting screw. (20) Install the battery, clamp and mounting nut.
(21) Install the positive battery cable on the bat-
tery. (22) Install the negative battery cable on the bat-
tery. (23) Install the battery thermal guard shield.
(24) Bleed the base brakes as necessary. (Refer to
5 - BRAKES - STANDARD PROCEDURE) (25) Road test vehicle to ensure operation of the
brakes.
INSTALLATION - RHD
(1) Position power brake booster on dash panel
using the reverse procedure of its removal (Fig. 75). (2) Below instrument panel, first install the two
upper nuts mounting the booster to the dash panel,
drawing it into place, then install the two lower
mounting nuts. Tighten the mounting nuts to a
torque of 29 N´m (250 in. lbs.). (3) Using lubriplate, or equivalent, coat the sur-
face of the brake pedal torque shaft pin where it con-
tacts the booster input rod.
CAUTION: When installing the brake pedal torque
shaft pin on the power brake booster input rod, do
not re-use the old retaining clip.
(4) Install booster input rod on brake pedal torque
shaft pin and install a NEW retaining clip (Fig. 78). (5) Install booster input rod trim cover.
(6) Connect vacuum hose to check valve on power
brake booster.
CAUTION: The master cylinder (and its rear seal) is
used to create the seal for holding vacuum in the
vacuum booster. The vacuum seal on the master
cylinder MUST be replaced with a NEW seal when-
ever the master cylinder is removed from the vac-
uum booster. CAUTION: When removing the vacuum seal from
the master cylinder, do not use a sharp tool.
(7) Using a soft tool such as a trim stick, remove
the vacuum seal from the master cylinder mounting
flange. (8) Install a NEW vacuum seal on rear mounting
flange of the master cylinder (Fig. 79).
(9) Position master cylinder on studs of booster,
aligning push rod on booster with master cylinder
piston. (10) Install the two nuts mounting the master cyl-
inder to the booster (Fig. 72). Tighten both mounting
nuts to a torque of 25 N´m (225 in. lbs.).
Fig. 78 Retaining Pin Installed On Brake Pedal Pin (Typical)
1 - BRAKE PEDAL
2 - RETAINING CLIP
3 - BOOSTER INPUT ROD
Fig. 79 Vacuum Seal (Typical)
1 - MASTER CYLINDER ASSEMBLY
2 - VACUUM SEAL
5s - 50 BRAKESRS
POWER BRAKE BOOSTER (Continued)
Page 297 of 2585

(6) Road test the vehicle to verify proper operation
of the brake system.
ROTOR
DIAGNOSIS AND TESTING - BRAKE ROTOR
Any servicing of the rotor requires extreme care to
maintain the rotor within service tolerances to
ensure proper brake action. Excessive runout or wobble in a rotor can increase
pedal travel due to piston knock-back. This increases
guide pin sleeve wear due to the tendency of the cal-
iper to follow the rotor wobble. When diagnosing a brake noise or pulsation, the
machined disc braking surface should be checked and
inspected.
BRAKING SURFACE INSPECTION
Light braking surface scoring and wear is accept-
able. If heavy scoring or warping is evident, the rotor
must be refaced or replaced. (Refer t o 5 - BRAKES/
HYDRAULIC/MECHANICAL/ROTORS - STAN-
DARD PROCEDURE). Excessive wear and scoring of the rotor can cause
improper lining contact on the rotor's braking sur-
face. If the ridges on the rotor are not removed before
new brake shoes are installed, improper wear of the
shoes will result. If a vehicle has not been driven for a period of
time, the rotor's braking surface will rust in the
areas not covered by the brake shoes at that time.
Once the vehicle is driven, noise and chatter from
the disc brakes can result when the brakes are
applied. Some discoloration or wear of the rotor surface is
normal and does not require resurfacing when lin-
ings are replaced. If cracks or burned spots are evi-
dent, the rotor must be replaced.
ROTOR MINIMUM THICKNESS
Measure rotor thickness at the center of the brake
shoe contact surface. Replace the rotor if it is worn
below minimum thickness or if machining the rotor
will cause its thickness to fall below specifications.
CAUTION: Do not machine the rotor if it will cause
the rotor to fall below minimum thickness.
Minimum thickness specifications are cast on the
rotor's unmachined surface (Fig. 82). Limits can also
be found in this section's specification table. (Refer to
5 - BRAKES/HYDRAULIC/MECHANICAL/ROTOR -
SPECIFICATIONS)
ROTOR THICKNESS VARIATION
Thickness variation in a rotor's braking surface
can result in pedal pulsation, chatter and surge. This
can also be caused by excessive runout in the rotor or
the hub. Rotor thickness variation measurements should be
made in conjunction with measuring runout. Mea-
sure thickness of the brake rotor at 12 equal points
around the rotor braking surface with a micrometer
at a radius approximately 25 mm (1 inch) from edge
of rotor (Fig. 83). If thickness measurements vary
beyond the specification listed in the specifaction
table (Refer t o 5 - BRAKES/HYDRAULIC/MECHAN-
ICAL/ROTOR - SPECIFICATIONS), the rotor should
be refaced or replaced. (Refer t o 5 - BRAKES/HY-
DRAULIC/MECHANICAL/ROTORS - STANDARD
PROCEDURE).
ROTOR RUNOUT
On-vehicle rotor runout is the combination of the
individual runout of the hub face and the runout of
the rotor. (The hub and rotor runouts are separable).
To measure rotor runout on the vehicle, first remove
the tire and wheel assembly. Reinstall the wheel
mounting nuts on the studs, tightening the rotor to
the hub. Mount the Dial Indicator, Special Tool
C-3339, with Mounting Adaptor, Special Tool SP-
1910 on steering arm. The dial indicator plunger
should contact braking surface of rotor approximately
ten millimeters from edge of rotor (Fig. 84). Check
lateral runout on both sides of the rotor, marking the
low and high spots on both. Runout limits can be
found in the specification table in this section. (Refer
to 5 - BRAKES/HYDRAULIC/MECHANICAL/RO-
TOR - SPECIFICATIONS)
Fig. 82 Minimum Brake Rotor Thickness Markings (Typical)
1 - ROTOR MINIMUM THICKNESS MARKING
2 - ROTOR
5s - 54 BRAKESRS
PROPORTIONING VALVE (Continued)
Page 1804 of 2585

ADJUSTMENT
(1) Park the vehicle on level ground and set the
parking brake.
(2) Place the gearshift lever in gated park (P) and
remove ignition key.
(3) Loosen the cable adjustment screw at the
transaxle manual valve lever (Fig. 223).
(4) Pull the gearshift lever fully forward to the
park detent position.
(5) Release the park brake, then rock the vehicle
to assure it is in park. Reset the park brake.
(6) Tighten the cable adjustment screw to 8 N´m
(70 in. lbs.). Gearshift cable should now be properly
adjusted.
(7) Verify adjustment by using the verification pro-
cedure.
HOLDING CLUTCHES
DESCRIPTION
Two hydraulically applied multi-disc clutches are
used to hold planetary geartrain components station-
ary while the input clutches drive others. The 2/4
and Low/Reverse clutches are considered holding
clutches and are contained at the rear of the trans-
axle case. (Fig. 224).
OPERATION
NOTE: Refer to the ªElements In Useº chart in Diag-
nosis and Testing for a collective view of which
clutch elements are applied at each position of the
selector lever.
2/4 CLUTCH
The 2/4 clutch is hydraulically applied in second
and fourth gears by pressurized fluid against the 2/4
clutch piston. When the 2/4 clutch is applied, the
front sun gear assembly is held or grounded to the
transaxle case.
LOW/REVERSE CLUTCH
The Low/Reverse clutch is hydraulically applied in
park, reverse, neutral, and first gears by pressurized
fluid against the Low/Reverse clutch piston. When
the Low/Reverse clutch is applied, the front planet
carrier/rear annulus assembly is held or grounded to
the transaxle case.
Fig. 223 Gearshift Cable Adjustment
1 - GEARSHIFT CABLE ADJUSTMENT SCREW
2 - GEARSHIFT CABLE
Fig. 224 2/4 and Low/Reverse Clutches
1 - FRONT PLANET CARRIER/REAR ANNULUS
2 - 2/4 CLUTCH
3 - L/R CLUTCH
4 - REAR PLANET CARRIER/FRONT ANNULUS
5 - REAR SUN GEAR
6 - FRONT SUN GEAR ASSEMBLY
RS41TE AUTOMATIC TRANSAXLE21 - 207
GEAR SHIFT CABLE (Continued)
Page 2547 of 2585

BLEEDING - STANDARD PROCEDURE,
BASE BRAKE......................5-7,5s-7
BLEEDING - STANDARD PROCEDURE,
MASTER CYLINDER...............5-35,5s-34
BLEND DOOR ACTUATOR -
DESCRIPTION..................24-23,24-35
BLEND DOOR ACTUATOR -
INSTALLATION..................24-23,24-36
BLEND DOOR ACTUATOR - OPERATION . . 24-23,
24-35
BLEND DOOR ACTUATOR - REMOVAL....24-23,
24-36
BLOCK - CLEANING, ENGINE.......9-112,9-36
BLOCK - DESCRIPTION, BLOWER
MOTOR RESISTOR...................24-26
BLOCK - DESCRIPTION, ENGINE.....9-112,9-35
BLOCK - DESCRIPTION, NON-ABS
JUNCTION......................5-33,5s-32
BLOCK - DIAGNOSIS AND TESTING,
BLOWER MOTOR RESISTOR............24-26
BLOCK - DIAGNOSIS AND TESTING,
REAR BLOWER MOTOR RESISTOR......24-38
BLOCK - INSPECTION, ENGINE......9-112,9-36
BLOCK - INSTALLATION, BLOWER
MOTOR RESISTOR...................24-27
BLOCK - INSTALLATION, NON-ABS
JUNCTION......................5-33,5s-32
BLOCK - OPERATION, BLOWER MOTOR
RESISTOR..........................24-26
BLOCK - OPERATION, NON-ABS
JUNCTION......................5-33,5s-32
BLOCK - REMOVAL, BLOWER MOTOR
RESISTOR...........................24-26
BLOCK - REMOVAL, NON-ABS JUNCTION . . 5-33,
5s-32
BLOCK HEATER - DESCRIPTION, ENGINE . . . 7-20
BLOCK HEATER - INSTALLATION,
ENGINE.............................7-20
BLOCK HEATER - OPERATION, ENGINE....7-20
BLOCK HEATER - REMOVAL, ENGINE......7-20
BLOCK HEATER TESTING - DIAGNOSIS
AND TESTING, ENGINE.................7-20
BLOCKER LATCH - INSTALLATION, FUEL
FILL DOOR.........................23-53
BLOCKER LATCH - REMOVAL, FUEL FILL
DOOR.............................23-53
BLOCKER LATCH STRIKER -
INSTALLATION, FUEL FILL DOOR........23-53
BLOCKER LATCH STRIKER - REMOVAL,
FUEL FILL DOOR.....................23-53
BLOCKER LOCKOUT LINK -
INSTALLATION, FUEL FILL DOOR........23-54
BLOCKER LOCKOUT LINK - REMOVAL,
FUEL FILL DOOR.....................23-53
BLOWER MOTOR - DESCRIPTION . . 24-46,24-57
BLOWER MOTOR - DESCRIPTION,
POWER MODULE....................24-31
BLOWER MOTOR - DESCRIPTION,
POWER MODULE - REAR..............24-41
BLOWER MOTOR - DIAGNOSIS AND
TESTING...........................24-47
BLOWER MOTOR - DIAGNOSIS AND
TESTING, REAR......................24-58
BLOWER MOTOR - INSTALLATION . . 24-49,24-58
BLOWER MOTOR - INSTALLATION,
POWER MODULE....................24-32
BLOWER MOTOR - INSTALLATION,
POWER MODULE - REAR..............24-42
BLOWER MOTOR - OPERATION....24-46,24-57
BLOWER MOTOR - OPERATION, POWER
MODULE...........................24-31
BLOWER MOTOR - OPERATION, POWER
MODULE - REAR.....................24-41
BLOWER MOTOR - REMOVAL......24-47,24-58
BLOWER MOTOR - REMOVAL, POWER
MODULE...........................24-31
BLOWER MOTOR - REMOVAL, POWER
MODULE - REAR.....................24-41
BLOWER MOTOR RELAY - DESCRIPTION
. 24-24,
24-37
BLOWER MOTOR RELAY -
INSTALLATION
..................24-25,24-38
BLOWER MOTOR RELAY - OPERATION
. . . 24-24,
24-37
BLOWER MOTOR RELAY - REMOVAL
....24-25,
24-38
BLOWER MOTOR RESISTOR -
DESCRIPTION
.......................24-38BLOWER MOTOR RESISTOR -
INSTALLATION.......................24-39
BLOWER MOTOR RESISTOR -
OPERATION.........................24-38
BLOWER MOTOR RESISTOR - REMOVAL . . 24-39
BLOWER MOTOR RESISTOR BLOCK -
DESCRIPTION.......................24-26
BLOWER MOTOR RESISTOR BLOCK -
DIAGNOSIS AND TESTING.............24-26
BLOWER MOTOR RESISTOR BLOCK -
DIAGNOSIS AND TESTING, REAR........24-38
BLOWER MOTOR RESISTOR BLOCK -
INSTALLATION.......................24-27
BLOWER MOTOR RESISTOR BLOCK -
OPERATION.........................24-26
BLOWER MOTOR RESISTOR BLOCK -
REMOVAL..........................24-26
BODY - ASSEMBLY, VALVE.....21-257,21s-159,
21s-212
BODY - DESCRIPTION, THROTTLE.......14-35
BODY - DESCRIPTION, VALVE . . . 21-250,21s-152
BODY - DISASSEMBLY, VALVE . . 21-252,21s-155,
21s-208
BODY - INSTALLATION, THROTTLE.......14-35
BODY - INSTALLATION, VALVE . . 21-262,21s-164,
21s-217
BODY - OPERATION, THROTTLE.........14-35
BODY - OPERATION, VALVE....21-250,21s-152
BODY - REMOVAL, THROTTLE..........14-35
BODY - REMOVAL, VALVE.....21-251,21s-153,
21s-206
BODY AND CABLE - DESCRIPTION,
ANTENNA...........................8A-4
BODY AND CABLE - DIAGNOSIS AND
TESTING, ANTENNA...................8A-4
BODY AND CABLE - INSTALLATION,
ANTENNA...........................8A-6
BODY AND CABLE - OPERATION,
ANTENNA...........................8A-4
BODY AND CABLE - REMOVAL,
ANTENNA...........................8A-5
BODY CODE PLATE - DESCRIPTION.....Intro.-1
BODY CONTROL MODULE -
DESCRIPTION........................8s-1
BODY CONTROL MODULE -
DESCRIPTION........................8E-3
BODY CONTROL MODULE -
INSTALLATION........................8s-3
BODY CONTROL MODULE -
INSTALLATION........................8E-5
BODY CONTROL MODULE - OPERATION . . . 8s-1
BODY CONTROL MODULE - OPERATION . . . 8E-3
BODY CONTROL MODULE - REMOVAL.....8s-3
BODY CONTROL MODULE - REMOVAL.....8E-4
BODY LUBRICATION, SPECIFICATIONS....23-12
BODY OPENING DIMENSIONS -
SPECIFICATIONS....................23-127
BODY PANEL REPAIR - STANDARD
PROCEDURE, PLASTIC.................23-3
BODY SEALING LOCATIONS -
SPECIFICATIONS....................23-130
BODY SIDE MOLDINGS - INSTALLATION . . 23-46
BODY SIDE MOLDINGS - REMOVAL......23-45
BODY, SPECIAL TOOLS................23-13
BOLSTER - INSTALLATION, QUARTER
TRIM..............................23-79
BOLSTER - REMOVAL, QUARTER TRIM . . . 23-79
BOOSTER - DESCRIPTION, POWER
BRAKE.........................5-40,5s-43
BOOSTER - DIAGNOSIS AND TESTING,
POWER BRAKE..................5-41,5s-44
BOOSTER - OPERATION, POWER BRAKE . . 5-41,
5s-44
BOOT - INNER - INSTALLATION, CV........3-6
BOOT - INNER - REMOVAL, CV...........3-6
BOOT - INNER/OUTER - INSTALLATION,
CV .................................3-17
BOOT - INNER/OUTER - REMOVAL, CV....3-15
BOOT - INSTALLATION, GEARSHIFT......21-73
BOOT - OUTER - INSTALLATION, CV......3-10
BOOT - OUTER - REMOVAL, CV..........3-10
BOOT - REMOVAL, GEARSHIFT
..........21-72
BORE FITTING - STANDARD
PROCEDURE, PISTON TO CYLINDER
......9-42
BORE HONING - STANDARD
PROCEDURE, CYLINDER
...........9-112,9-35
BOX - INSTALLATION, GLOVE
...........23-64
BOX - REMOVAL, GLOVE
..............23-64BOX LAMP SWITCH - INSTALLATION,
GLOVE.............................8L-22
BOX LAMP SWITCH - REMOVAL, GLOVE . . 8L-22
BOX LATCH - INSTALLATION, GLOVE.....23-64
BOX LATCH - REMOVAL, GLOVE.........23-64
BOX LATCH STRIKER - INSTALLATION,
GLOVE.............................23-64
BOX LATCH STRIKER - REMOVAL,
GLOVE.............................23-64
B-PILLAR - INSTALLATION, A-PILLAR-
HEADER, OR........................23-17
B-PILLAR - REMOVAL, A-PILLAR-
HEADER, OR........................23-17
B-PILLAR LOWER TRIM - INSTALLATION . . 23-75
B-PILLAR LOWER TRIM - REMOVAL.....23-74
B-PILLAR SWITCH - DESCRIPTION, LEFT . 8N-32
B-PILLAR SWITCH - DESCRIPTION,
RIGHT.............................8N-32
B-PILLAR SWITCH - INSTALLATION,
LEFT..............................8N-32
B-PILLAR SWITCH - INSTALLATION,
RIGHT.............................8N-32
B-PILLAR SWITCH - OPERATION, LEFT . . . 8N-32
B-PILLAR SWITCH - OPERATION, RIGHT . . 8N-32
B-PILLAR SWITCH - REMOVAL, LEFT....8N-32
B-PILLAR SWITCH - REMOVAL, RIGHT . . . 8N-32
B-PILLAR UPPER TRIM - INSTALLATION . . 23-75
B-PILLAR UPPER TRIM - REMOVAL......23-75
BRACKET - 2.4L ENGINE -
INSTALLATION, A/C COMPRESSOR
MOUNTING.........................24-76
BRACKET - 2.4L ENGINE - REMOVAL,
A/C COMPRESSOR MOUNTING..........24-75
BRACKET - DESCRIPTION, TRANSVERSE . . 8N-18
BRACKET - INSTALLATION, TRANSVERSE . 8N-18
BRACKET - OPERATION, TRANSVERSE . . . 8N-18
BRACKET - REMOVAL, TRANSVERSE.....8N-18
BRACKET ASSEMBLY - INSTALLATION,
FLOOR CONSOLE TRAY................23-83
BRACKET ASSEMBLY - REMOVAL,
FLOOR CONSOLE TRAY................23-83
BRAKE - DESCRIPTION, CONTROLLER
ANTILOCK...........................8E-5
BRAKE - INSTALLATION, CONTROLLER
ANTILOCK...........................8E-6
BRAKE - INSTALLATION, LEVER -
PARKING.......................5-65,5s-67
BRAKE - INSTALLATION, SHOES -
PARKING.......................5-72,5s-75
BRAKE - INSTALLATION, SUPPORT
PLATE - DRUM..................5-56,5s-58
BRAKE - OPERATION, CONTROLLER
ANTILOCK...........................8E-5
BRAKE - REMOVAL, CONTROLLER
ANTILOCK...........................8E-6
BRAKE - REMOVAL, LEVER - PARKING....5-64,
5s-67
BRAKE - REMOVAL, SHOES - PARKING . . . 5-67,
5s-69
BRAKE - REMOVAL, SUPPORT PLATE -
DRUM
.........................5-56,5s-58
BRAKE AUTOMATIC ADJUSTER -
DIAGNOSIS AND TESTING, DRUM
. . . 5-13,5s-13
BRAKE AUTOMATIC ADJUSTER TENSION
RELEASE - STANDARD PROCEDURE,
PARKING
.......................5-58,5s-61
BRAKE AUTOMATIC ADJUSTER TENSION
RESET - STANDARD PROCEDURE,
PARKING
.......................5-59,5s-61
BRAKE BLEEDING - STANDARD
PROCEDURE, BASE
.................5-7,5s-7
BRAKE BOOSTER - DESCRIPTION,
POWER
........................5-40,5s-43
BRAKE BOOSTER - DIAGNOSIS AND
TESTING, POWER
................5-41,5s-44
BRAKE BOOSTER - OPERATION, POWER
. . 5-41,
5s-44
BRAKE CABLE (FRONT) - INSTALLATION,
PARKING
.......................5-63,5s-65
BRAKE CABLE (FRONT) - REMOVAL,
PARKING
.......................5-59,5s-62
BRAKE CABLE (INTERMEDIATE) -
INSTALLATION, PARKING
..........5-63,5s-66
BRAKE CABLE (INTERMEDIATE) -
REMOVAL, PARKING
..............5-60,5s-62
BRAKE CABLE (LEFT REAR) -
INSTALLATION, PARKING
..........5-64,5s-66
4 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2549 of 2585

CABLE - DIAGNOSIS AND TESTING,
ANTENNA BODY......................8A-4
CABLE - DIAGNOSIS AND TESTING,
BATTERY...........................8F-16
CABLE - INSTALLATION................8P-4
CABLE - INSTALLATION, ANTENNA BODY . . 8A-6
CABLE - INSTALLATION, FRONT.....5-64,5s-67
CABLE - INSTALLATION, GEAR SHIFT....21-205
CABLE - INSTALLATION, HOLD OPEN
LATCH .............................23-38
CABLE - INSTALLATION, INSIDE HANDLE . . 23-38
CABLE - INSTALLATION, INSTRUMENT
PANEL ANTENNA......................8A-9
CABLE - INSTALLATION, LATCH RELEASE . 23-62
CABLE - INSTALLATION, OUTSIDE
HANDLE............................23-37
CABLE - INSTALLATION, PARKING
BRAKE LEVER AND FRONT.........5-66,5s-69
CABLE - INSTALLATION, THROTTLE
CONTROL..........................14-36
CABLE - OPERATION...................8P-4
CABLE - OPERATION, ANTENNA BODY.....8A-4
CABLE - REMOVAL....................8P-4
CABLE - REMOVAL, ANTENNA BODY......8A-5
CABLE - REMOVAL, FRONT.........5-64,5s-67
CABLE - REMOVAL, GEAR SHIFT.......21-204,
21s-105
CABLE - REMOVAL, HOLD OPEN LATCH . . . 23-38
CABLE - REMOVAL, INSIDE HANDLE.....23-37
CABLE - REMOVAL, INSTRUMENT PANEL
ANTENNA...........................8A-8
CABLE - REMOVAL, LATCH RELEASE.....23-61
CABLE - REMOVAL, OUTSIDE HANDLE....23-37
CABLE - REMOVAL, PARKING BRAKE
LEVER AND FRONT...............5-65,5s-68
CABLE - REMOVAL, THROTTLE
CONTROL..........................14-35
CABLE - SELECTOR - INSTALLATION,
GEARSHIFT.........................21-84
CABLE - SELECTOR - REMOVAL,
GEARSHIFT.........................21-81
CABLE ADJUSTMENT, ADJUSTMENTS -
GEARSHIFT........................21-206
CABLE ADJUSTMENT, INSTALLATION -
SYNCHRONIZING...............23-102,23-88
CABLE (FRONT) - INSTALLATION,
PARKING BRAKE.................5-63,5s-65
CABLE (FRONT) - REMOVAL, PARKING
BRAKE.........................5-59,5s-62
CABLE (INTERMEDIATE) -
INSTALLATION, PARKING BRAKE
....5-63,5s-66
CABLE (INTERMEDIATE) - REMOVAL,
PARKING BRAKE
.................5-60,5s-62
CABLE (LEFT REAR) - INSTALLATION,
PARKING BRAKE
.................5-64,5s-66
CABLE (LEFT REAR) - REMOVAL,
PARKING BRAKE
.................5-62,5s-64
CABLE RESISTANCE, SPECIFICATIONS -
SPARK PLUG
.........................8I-2
CABLE (RIGHT REAR) - INSTALLATION,
PARKING BRAKE
.................5-63,5s-66
CABLE (RIGHT REAR) - REMOVAL,
PARKING BRAKE
.................5-60,5s-63
CABLES - ADJUSTMENT, PARKING
BRAKE
.........................5-64,5s-66
CABLES - DESCRIPTION, BATTERY
.......8F-16
CABLES - INSTALLATION, BATTERY
......8F-18
CABLES - OPERATION, BATTERY
........8F-16
CABLES - REMOVAL, BATTERY
..........8F-18
CALIBRATION - STANDARD PROCEDURE,
A/C-HEATER CONTROL
................24-20
CALIBRATION - STANDARD PROCEDURE,
COMPASS
...........................8M-3
CALIPER - CLEANING
....5-25,5-29,5s-24,5s-28
CALIPER - INSPECTION
. . . 5-25,5-29,5s-24,5s-28
CALIPER - INSTALLATION, REAR DISC
BRAKE
.........................5-30,5s-29
CALIPER - REMOVAL, REAR DISC
BRAKE
.........................5-27,5s-26
CALIPER ADAPTER - INSTALLATION,
FRONT DISC BRAKE
..............5-31,5s-30
CALIPER ADAPTER - REMOVAL, FRONT
DISC BRAKE
....................5-31,5s-30
CALIPER (CONTINENTAL TEVES
BRAKES) - INSTALLATION, FRONT
DISC BRAKE
........................5s-26CALIPER (CONTINENTAL TEVES
BRAKES) - REMOVAL, FRONT DISC
BRAKE.............................5s-23
CALIPER (DISC/DISC BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5-27
CALIPER (DISC/DISC BRAKES) -
REMOVAL, FRONT DISC BRAKE..........5-24
CALIPER (DISC/DRUM BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5-27
CALIPER (DISC/DRUM BRAKES) -
REMOVAL, FRONT DISC BRAKE..........5-24
CALIPER GUIDE PIN BUSHINGS
(CONTINENTAL TEVES BRAKES) -
ASSEMBLY..........................5s-24
CALIPER GUIDE PIN BUSHINGS
(CONTINENTAL TEVES BRAKES) -
DISASSEMBLY.......................5s-23
CALIPER GUIDE PIN BUSHINGS
(DISC/DISC BRAKES) - ASSEMBLY........5-25
CALIPER GUIDE PIN BUSHINGS
(DISC/DISC BRAKES) - DISASSEMBLY.....5-24
CALIPER GUIDE PINS (DISC/DRUM
BRAKES) - INSTALLATION, DISC
BRAKE..............................5-31
CALIPER GUIDE PINS (DISC/DRUM
BRAKES) - REMOVAL, DISC BRAKE.......5-31
CALIPER GUIDE PINS (TRW BRAKES) -
INSTALLATION, DISC BRAKE............5s-30
CALIPER GUIDE PINS (TRW BRAKES) -
REMOVAL, DISC BRAKE...............5s-30
CALIPER PISTON AND SEAL -
ASSEMBLY.............5-26,5-29,5s-25,5s-28
CALIPER PISTON AND SEAL -
DISASSEMBLY..........5-24,5-28,5s-23,5s-27
CALIPER (TRW BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5s-26
CALIPER (TRW BRAKES) - REMOVAL,
FRONT DISC BRAKE..................5s-23
CAMSHAFT & BEARINGS (IN BLOCK) -
DESCRIPTION.......................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
INSPECTION........................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
INSTALLATION.......................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
OPERATION.........................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
REMOVAL..........................9-115
CAMSHAFT END PLAY - STANDARD
PROCEDURE, MEASURING..............9-29
CAMSHAFT OIL SEAL(S) - INSTALLATION . . 9-28
CAMSHAFT OIL SEAL(S) - REMOVAL......9-27
CAMSHAFT POSITION SENSOR -
DESCRIPTION.........................8I-4
CAMSHAFT POSITION SENSOR -
OPERATION..........................8I-4
CAMSHAFT SPROCKET - INSTALLATION,
TIMING CHAIN.......................9-157
CAMSHAFT SPROCKET - REMOVAL,
TIMING CHAIN.......................9-156
CAMSHAFT SPROCKETS - INSTALLATION . . 9-65
CAMSHAFT SPROCKETS - REMOVAL......9-64
CAMSHAFT(S) - CLEANING..............9-29
CAMSHAFT(S) - DESCRIPTION...........9-28
CAMSHAFT(S) - INSPECTION............9-30
CAMSHAFT(S) - INSTALLATION..........9-30
CAMSHAFT(S) - OPERATION.............9-28
CAMSHAFT(S) - REMOVAL..............9-29
CANISTER - DESCRIPTION, VAPOR......25-18
CANISTER - INSTALLATION, REAR EVAP . . 25-20
CANISTER - OPERATION, VAPOR........25-18
CANISTER - REMOVAL, REAR EVAP......25-19
CAP - DESCRIPTION, FUEL FILLER.......25-12
CAP - DESCRIPTION, RADIATOR
PRESSURE..........................7-26
CAP - INSTALLATION, INSTRUMENT
PANEL END.........................23-68
CAP - OPERATION, FUEL FILLER........25-12
CAP - OPERATION, RADIATOR
PRESSURE
..........................7-27
CAP - REMOVAL, INSTRUMENT PANEL
END
...............................23-68
CAP TESTING - DIAGNOSIS AND
TESTING, COOLING SYSTEM
PRESSURE
..........................7-27
CAP TO FILLER NECK SEAL -
DIAGNOSIS AND TESTING, RADIATOR
.....7-27
CAPACITIES - SPECIFICATIONS, FLUID
......0-6CARE - CLEANING, ALUMINUM WHEEL . . . 22-18
CARGO - INSTALLATION, AWD, HEAVY
DUTY...............................2-36
CARGO - INSTALLATION, SPRING........2-40
CARGO - REMOVAL, AWD, HEAVY DUTY . . . 2-36
CARGO - REMOVAL, SPRING............2-40
CARPETS AND FLOOR MATS -
INSTALLATION.......................23-76
CARPETS AND FLOOR MATS - REMOVAL . 23-75
CARRIER ASSEMBLY - DESCRIPTION,
BALANCE SHAFTS.....................9-69
CARRIER ASSEMBLY - INSTALLATION,
BALANCE SHAFTS.....................9-72
CARRIER ASSEMBLY - OPERATION,
BALANCE SHAFTS.....................9-69
CARRIER ASSEMBLY - REMOVAL,
BALANCE SHAFTS.....................9-69
CARRIER SEAL - INSTALLATION,
DIFFERENTIAL........................21-9
CARRIER SEAL - REMOVAL,
DIFFERENTIAL........................21-9
CATALYTIC CONVERTER - DESCRIPTION . . . 11-4
CATALYTIC CONVERTER - INSPECTION....11-5
CATALYTIC CONVERTER - INSTALLATION . . . 11-6
CATALYTIC CONVERTER - OPERATION.....11-4
CATALYTIC CONVERTER - REMOVAL......11-5
CAUSES - DIAGNOSIS AND TESTING,
COMMON PROBLEM..................21-30
CAUTION - A/C SYSTEM...............24-66
CAUTION - CAUTIONS...................5-78
CAUTION, DESCRIPTION.............5-4,5s-4
CAUTION, DESCRIPTION...............19-37
CAUTION, SENSOR - TPM.........22-10,22s-2
CAUTIONS, CAUTION..................5-78
CAUTIONS, WARNING - WARNINGS . 19-10,19-27
CD CHANGER - DESCRIPTION...........8A-7
CD CHANGER - INSTALLATION...........8A-8
CD CHANGER - OPERATION.............8A-7
CD CHANGER - REMOVAL..............8A-8
CENTER - DESCRIPTION, ELECTRONIC
VEHICLE INFO.......................8M-6
CENTER - DIAGNOSIS AND TESTING,
ELECTRONIC VEHICLE INFORMATION.....8M-7
CENTER - INSTALLATION, ELECTRONIC
VEHICLE INFO.......................8M-9
CENTER - OPERATION, ELECTRONIC
VEHICLE INFO.......................8M-7
CENTER - REMOVAL, ELECTRONIC
VEHICLE INFO.......................8M-9
CENTER BEZEL - INSTALLATION,
INSTRUMENT PANEL..................23-68
CENTER BEZEL - REMOVAL,
INSTRUMENT PANEL..................23-68
CENTER BEZEL OUTLETS -
INSTALLATION.......................24-45
CENTER BEZEL OUTLETS - REMOVAL....24-44
CENTER CONSOLE LAMP -
INSTALLATION.......................8L-21
CENTER CONSOLE LAMP - REMOVAL....8L-21
CENTER CONSOLE LAMP SWITCH -
INSTALLATION.......................8L-21
CENTER CONSOLE LAMP SWITCH -
REMOVAL..........................8L-21
CENTER HIGH MOUNTED STOP LAMP -
INSTALLATION........................8L-6
CENTER HIGH MOUNTED STOP LAMP -
REMOVAL...........................8L-6
CENTER HIGH MOUNTED STOP LAMP
UNIT - INSTALLATION..................8L-6
CENTER HIGH MOUNTED STOP LAMP
UNIT - REMOVAL.....................8L-6
CENTER HINGE - INSTALLATION.........23-24
CENTER HINGE - REMOVAL............23-24
CENTER PROGRAMMING - STANDARD
PROCEDURE, ELECTRONIC VEHICLE
INFORMATION.......................8M-7
CENTER STRIKER - INSTALLATION.......23-28
CENTER STRIKER - REMOVAL..........23-28
CENTERING - STANDARD PROCEDURE,
CLOCK SPRING.......................8O-5
CERTIFICATION LABEL - DESCRIPTION,
VEHICLE
.........................Intro.-11
CHAIN AND CAMSHAFT SPROCKET -
INSTALLATION, TIMING
................9-157
CHAIN AND CAMSHAFT SPROCKET -
REMOVAL, TIMING
...................9-156
CHAIN COVER - INSTALLATION, TIMING
. . 9-155
CHAIN COVER - REMOVAL, TIMING
......9-153
6 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2551 of 2585

COMPRESSOR CLUTCH COIL -
DIAGNOSIS AND TESTING, A/C..........24-15
COMPRESSOR CLUTCH RELAY -
DESCRIPTION, A/C...................24-19
COMPRESSOR CLUTCH RELAY -
INSTALLATION, A/C...................24-20
COMPRESSOR CLUTCH RELAY -
OPERATION, A/C.....................24-19
COMPRESSOR CLUTCH RELAY -
REMOVAL, A/C......................24-20
COMPRESSOR CLUTCH/COIL -
DESCRIPTION, A/C...................24-15
COMPRESSOR CLUTCH/COIL -
INSPECTION, A/C.....................24-17
COMPRESSOR CLUTCH/COIL -
INSTALLATION, A/C...................24-17
COMPRESSOR CLUTCH/COIL -
OPERATION, A/C.....................24-15
COMPRESSOR CLUTCH/COIL -
REMOVAL, A/C......................24-16
COMPRESSOR MOUNTING BRACKET -
2.4L ENGINE - INSTALLATION, A/C.......24-76
COMPRESSOR MOUNTING BRACKET -
2.4L ENGINE - REMOVAL, A/C..........24-75
COMPRESSOR NOISE DIAGNOSIS -
DIAGNOSIS AND TESTING.............24-74
COMPUTER - DESCRIPTION, COMPASS/
MINI-TRIP..........................8M-9
COMPUTER - DIAGNOSIS AND TESTING,
COMPASS MINI-TRIP.................8M-10
COMPUTER - INSTALLATION, COMPASS/
MINI-TRIP.........................8M-10
COMPUTER - OPERATION, COMPASS/
MINI-TRIP............................8M-9
COMPUTER - REMOVAL, COMPASS/
MINI-TRIP.........................8M-10
CONCENTRATION TESTING - DIAGNOSIS
AND TESTING, COOLANT...............7-19
CONDENSER - DESCRIPTION, A/C.......24-76
CONDENSER - INSTALLATION, A/C.......24-78
CONDENSER - OPERATION, A/C.........24-76
CONDENSER - REMOVAL, A/C..........24-77
CONDITION CHECK, STANDARD
PROCEDURE - FLUID LEVEL....21-201,21s-102
CONDITIONER - DESCRIPTION, HEATER
AND AIR ............................24-1
CONDITIONER - OPERATION, HEATER
AND AIR ............................24-4
CONNECTING ROD - DESCRIPTION,
PISTON........................9-116,9-42
CONNECTING ROD - INSTALLATION,
PISTON.............................9-44
CONNECTING ROD - REMOVAL, PISTON . . . 9-43
CONNECTING ROD BEARING
CLEARANCE - STANDARD
PROCEDURE, MEASURING.............9-120
CONNECTING ROD, FITTING.............9-45
CONNECTING RODS - STANDARD
PROCEDURE, FITTING.................9-116
CONNECTOR - DESCRIPTION, DATA LINK . . 8E-6
CONNECTOR - INSTALLATION.......8W-01-11
CONNECTOR - OPERATION, DATA LINK....8E-7
CONNECTOR - REMOVAL...........8W-01-11
CONNECTOR, GROUND AND SPLICE
INFORMATION - DESCRIPTION........8W-01-7
CONNECTOR/GROUND/SPLICE LOCATION
- DESCRIPTION....................8W-91-1
CONSOLE - DESCRIPTION, OVERHEAD....8M-1
CONSOLE - DIAGNOSIS AND TESTING,
OVERHEAD..........................8M-2
CONSOLE - INSTALLATION, LOWER......23-69
CONSOLE - OPERATION, OVERHEAD......8M-2
CONSOLE - REMOVAL, LOWER..........23-69
CONSOLE - REMOVAL, OVERHEAD.......8M-6
CONSOLE LAMP - INSTALLATION,
CENTER............................8L-21
CONSOLE LAMP - REMOVAL, CENTER....8L-21
CONSOLE LAMP SWITCH -
INSTALLATION, CENTER...............8L-21
CONSOLE LAMP SWITCH - REMOVAL,
CENTER............................8L-21
CONSOLE, SPECIAL TOOLS - OVERHEAD
. . 8M-6
CONSOLE TRAY - BRACKET ASSEMBLY -
INSTALLATION, FLOOR
................23-83
CONSOLE TRAY - BRACKET ASSEMBLY -
REMOVAL, FLOOR
....................23-83
CONSOLE TRAY - INSTALLATION, FLOOR
. . 23-83
CONSOLE TRAY - REMOVAL, FLOOR
.....23-83CONTAINER - DESCRIPTION, COOLANT
RECOVERY..........................7-19
CONTAINER - INSTALLATION, COOLANT
RECOVERY..........................7-20
CONTAINER - OPERATION, COOLANT
RECOVERY..........................7-19
CONTAINER - REMOVAL, COOLANT
RECOVERY..........................7-20
CONTAMINATION - DIAGNOSIS AND
TESTING, BRAKE FLUID...........5-32,5s-31
CONTINUITY - STANDARD PROCEDURE,
TESTING.........................8W-01-9
CONTROL (4 SPEED EATX ONLY) -
OPERATION, INTERACTIVE SPEED........8P-2
CONTROL ARM - DESCRIPTION, LOWER . . . 2-12
CONTROL ARM - INSPECTION, LOWER....2-14
CONTROL ARM - INSTALLATION, LOWER . . 2-16
CONTROL ARM - OPERATION, LOWER.....2-12
CONTROL ARM - REMOVAL, LOWER......2-12
CONTROL ARM (REAR BUSHING -
HYDRO) - ASSEMBLY, LOWER...........2-14
CONTROL ARM (REAR BUSHING -
HYDRO) - DISASSEMBLY, LOWER........2-14
CONTROL ARM (REAR BUSHING -
STANDARD) - ASSEMBLY, LOWER........2-14
CONTROL ARM (REAR BUSHING -
STANDARD) - DISASSEMBLY, LOWER.....2-13
CONTROL (ATC) - INSTALLATION,
AUTOMATIC TEMPERATURE............24-29
CONTROL (ATC) - REMOVAL,
AUTOMATIC TEMPERATURE............24-28
CONTROL CABLE - INSTALLATION,
THROTTLE..........................14-36
CONTROL CABLE - REMOVAL,
THROTTLE..........................14-35
CONTROL CALIBRATION - STANDARD
PROCEDURE, A/C-HEATER.............24-20
CONTROL CIRCUIT TEST - DIAGNOSIS
AND TESTING..................8F-30,8F-32
CONTROL INFORMATION LABEL -
DESCRIPTION, VEHICLE EMISSION.......25-1
CONTROL MODULE - DESCRIPTION,
BODY...............................8s-1
CONTROL MODULE - DESCRIPTION,
BODY...............................8E-3
CONTROL MODULE - DESCRIPTION,
FRONT..............................8E-7
CONTROL MODULE - DESCRIPTION,
POWER LIFTGATE....................8E-10
CONTROL MODULE - DESCRIPTION,
SLIDING DOOR......................8E-19
CONTROL MODULE - DESCRIPTION,
TRANSMISSION......................8E-20
CONTROL MODULE - DIAGNOSIS AND
TESTING, FRONT......................8E-7
CONTROL MODULE - INSTALLATION,
BODY...............................8s-3
CONTROL MODULE - INSTALLATION,
BODY...............................8E-5
CONTROL MODULE - INSTALLATION,
FRONT..............................8E-8
CONTROL MODULE - INSTALLATION,
POWER LIFTGATE....................8E-11
CONTROL MODULE - INSTALLATION,
SLIDING DOOR......................8E-20
CONTROL MODULE - OPERATION, BODY . . . 8s-1
CONTROL MODULE - OPERATION, BODY . . . 8E-3
CONTROL MODULE - OPERATION,
FRONT..............................8E-7
CONTROL MODULE - OPERATION,
POWER LIFTGATE....................8E-11
CONTROL MODULE - OPERATION,
SLIDING DOOR......................8E-19
CONTROL MODULE - OPERATION,
TRANSMISSION......................8E-20
CONTROL MODULE - REMOVAL, BODY....8s-3
CONTROL MODULE - REMOVAL, BODY....8E-4
CONTROL MODULE - REMOVAL, FRONT . . . 8E-8
CONTROL MODULE - REMOVAL, POWER
LIFTGATE
...........................8E-11
CONTROL MODULE - REMOVAL,
SLIDING DOOR
......................8E-19
CONTROL MOTOR - DESCRIPTION, IDLE
AIR
...............................14-28
CONTROL MOTOR - INSTALLATION, IDLE
AIR
...............................14-29
CONTROL MOTOR - OPERATION, IDLE
AIR
...............................14-28CONTROL MOTOR - REMOVAL, IDLE AIR . . 14-29
CONTROL (MTC) - INSTALLATION,
MANUAL TEMPERATURE...............24-29
CONTROL (MTC) - REMOVAL, MANUAL
TEMPERATURE......................24-29
CONTROL RELAY - DESCRIPTION,
TRANSMISSION..............21-247,21s-150
CONTROL RELAY - OPERATION,
TRANSMISSION..............21-248,21s-150
CONTROL SWITCH - DIAGNOSIS AND
TESTING, TRACTION...................5-82
CONTROL SYSTEM - DESCRIPTION,
TRACTION...........................5-76
CONTROL SYSTEM - OPERATION,
AUTOMATIC TEMPERATURE...........24-112
CONTROL SYSTEM - OPERATION,
EVAPORATION.......................25-10
CONTROL SYSTEM - OPERATION,
MANUAL TEMPERATURE..............24-112
CONTROL SYSTEM - OPERATION,
TRACTION...........................5-77
CONTROLLER - DESCRIPTION,
OCCUPANT RESTRAINT................8O-8
CONTROLLER - INSTALLATION,
OCCUPANT RESTRAINT................8O-8
CONTROLLER - INSTALLATION, SBEC....8E-17
CONTROLLER - OPERATION, 8-VOLT
SUPPLY - PCM OUTPUT - SBEC.........8E-15
CONTROLLER - OPERATION, OCCUPANT
RESTRAINT..........................8O-8
CONTROLLER - REMOVAL, NGC.........8E-17
CONTROLLER - REMOVAL, OCCUPANT
RESTRAINT...........................8O-8
CONTROLLER - REMOVAL, SBEC........8E-16
CONTROLLER ANTILOCK BRAKE -
DESCRIPTION........................8E-5
CONTROLLER ANTILOCK BRAKE -
INSTALLATION........................8E-6
CONTROLLER ANTILOCK BRAKE -
OPERATION..........................8E-5
CONTROLLER ANTILOCK BRAKE -
REMOVAL...........................8E-6
CONVENTIONAL BATTERY CHARGING -
STANDARD PROCEDURE...............8F-11
CONVERTER - DESCRIPTION, CATALYTIC . . . 11-4
CONVERTER - DESCRIPTION, TORQUE . . 21-242,
21s-144
CONVERTER - INSPECTION, CATALYTIC....11-5
CONVERTER - INSTALLATION, CATALYTIC . . 11-6
CONVERTER - INSTALLATION, TORQUE . . 21-247,
21s-149
CONVERTER - OPERATION, CATALYTIC....11-4
CONVERTER - OPERATION, TORQUE....21-245,
21s-148
CONVERTER - REMOVAL, CATALYTIC......11-5
CONVERTER - REMOVAL, TORQUE.....21-247,
21s-149
CONVERTER HOUSING FLUID LEAKAGE -
DIAGNOSIS AND TESTING, TORQUE....21-123,
21s-31
COOL DOWN TEST - DIAGNOSIS AND
TESTING, A/C........................24-6
COOLANT - DESCRIPTION, ENGINE.......7-19
COOLANT - DESCRIPTION, ENGINE........0-3
COOLANT - STANDARD PROCEDURE,
ADDING ADDITIONAL...................7-5
COOLANT CONCENTRATION TESTING -
DIAGNOSIS AND TESTING..............7-19
COOLANT LEVEL CHECK - STANDARD
PROCEDURE..........................7-5
COOLANT RECOVERY CONTAINER -
DESCRIPTION........................7-19
COOLANT RECOVERY CONTAINER -
INSTALLATION........................7-20
COOLANT RECOVERY CONTAINER -
OPERATION..........................7-19
COOLANT RECOVERY CONTAINER -
REMOVAL...........................7-20
COOLANT RECOVERY SYSTEM -
DIAGNOSIS AND TESTING
..............7-20
COOLANT SERVICE - STANDARD
PROCEDURE
.........................7-19
COOLANT TEMPERATURE SENSOR -
2.4L - DESCRIPTION, ENGINE
............7-21
COOLANT TEMPERATURE SENSOR -
2.4L - INSTALLATION, ENGINE
...........7-21
COOLANT TEMPERATURE SENSOR -
2.4L - REMOVAL, ENGINE
...............7-21
8 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2553 of 2585

CV BOOT - INNER/OUTER -
INSTALLATION........................3-17
CV BOOT - INNER/OUTER - REMOVAL.....3-15
CV BOOT - OUTER - INSTALLATION.......3-10
CV BOOT - OUTER - REMOVAL...........3-10
CYCLE - STANDARD PROCEDURE,
POWER DOOR LEARN................8N-28
CYCLE - STANDARD PROCEDURE,
POWER LIFTGATE LEARN...............8N-9
CYLINDER - DESCRIPTION, KEY/LOCK....19-20
CYLINDER - DESCRIPTION, STANDARD 4 . . . 8I-9
CYLINDER - INSTALLATION, KEY/LOCK . . . 19-20
CYLINDER - INSTALLATION, LOCK . . 23-19,23-42
CYLINDER - INSTALLATION, SLAVE.......6-11
CYLINDER - INSTALLATION, SUPPORT....23-43
CYLINDER - LHD - INSTALLATION,
MASTER............................6-10
CYLINDER - LHD - REMOVAL, MASTER.....6-9
CYLINDER - OPERATION, KEY/LOCK......19-20
CYLINDER - REMOVAL, KEY/LOCK.......19-20
CYLINDER - REMOVAL, LOCK......23-19,23-42
CYLINDER - REMOVAL, SLAVE...........6-11
CYLINDER - REMOVAL, SUPPORT.......23-43
CYLINDER - RHD - INSTALLATION,
MASTER.............................6-9
CYLINDER - RHD - REMOVAL, MASTER.....6-8
CYLINDER BLEEDING - STANDARD
PROCEDURE, MASTER............5-35,5s-34
CYLINDER BORE FITTING - STANDARD
PROCEDURE, PISTON TO...............9-42
CYLINDER BORE HONING - STANDARD
PROCEDURE....................9-112,9-35
CYLINDER COMBUSTION PRESSURE
LEAKAGE TEST - DIAGNOSIS AND
TESTING.........................9-83,9-9
CYLINDER COMPRESSION PRESSURE
TEST - DIAGNOSIS AND TESTING.....9-83,9-9
CYLINDER (FLUID RESERVOIR) -
ASSEMBLY, MASTER..............5-38,5s-37
CYLINDER (FLUID RESERVOIR) -
DISASSEMBLY, MASTER...........5-37,5s-36
CYLINDER HEAD - CLEANING . . 9-100,9-26,9s-17
CYLINDER HEAD - DESCRIPTION....9-24,9-99,
9s-16
CYLINDER HEAD - INSPECTION.....9-101,9-26,
9s-17
CYLINDER HEAD - INSTALLATION . . . 9-101,9-26,
9s-18
CYLINDER HEAD - REMOVAL . . 9-100,9-25,9s-17
CYLINDER HEAD COVER - CLEANING......9-31
CYLINDER HEAD COVER - INSPECTION....9-31
CYLINDER HEAD COVER -
INSTALLATION........................9-31
CYLINDER HEAD COVER - LEFT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - LEFT -
REMOVAL..........................9-103
CYLINDER HEAD COVER - REMOVAL......9-31
CYLINDER HEAD COVER - RIGHT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - RIGHT -
REMOVAL..........................9-102
CYLINDER HEAD COVER-LEFT -
INSTALLATION
.......................9s-20
CYLINDER HEAD COVER-LEFT -
REMOVAL
..........................9s-20
CYLINDER HEAD COVER-RIGHT -
INSTALLATION
.......................9s-19
CYLINDER HEAD COVER-RIGHT -
REMOVAL
..........................9s-19
CYLINDER HEAD COVER(S) -
DESCRIPTION
..................9-102,9s-19
CYLINDER HEAD GASKET - DIAGNOSIS
AND TESTING
...............9-24,9-99,9s-16
CYLINDER HEAD OFF - INSTALLATION
. . . 9-108,
9-33,9s-26
CYLINDER HEAD OFF - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HEAD ON - INSTALLATION
....9-108,
9-33,9s-26
CYLINDER HEAD ON - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HOUSING - INSTALLATION,
LOCK
..............................19-19
CYLINDER HOUSING - REMOVAL, LOCK
. . 19-17
CYLINDER LOCK SWITCH -
DESCRIPTION, DOOR
.................8N-40CYLINDER LOCK SWITCH - DIAGNOSIS
AND TESTING, DOOR.................8N-40
CYLINDER LOCK SWITCH - EXPORT -
DESCRIPTION, DOOR..................8N-3
CYLINDER LOCK SWITCH - EXPORT -
DIAGNOSIS AND TESTING, DOOR........8N-3
CYLINDER LOCK SWITCH - EXPORT -
INSTALLATION, DOOR.................8N-4
CYLINDER LOCK SWITCH - EXPORT -
OPERATION, DOOR....................8N-3
CYLINDER LOCK SWITCH - EXPORT -
REMOVAL, DOOR.....................8N-3
CYLINDER LOCK SWITCH -
INSTALLATION, DOOR.................8N-41
CYLINDER LOCK SWITCH - OPERATION,
DOOR.............................8N-40
CYLINDER LOCK SWITCH - REMOVAL,
DOOR.............................8N-41
CYLINDERS - INSPECTION, WHEEL . . 5-57,5s-59
CYLINDERS - INSTALLATION, WHEEL . 5-57,5s-60
CYLINDERS - REMOVAL, WHEEL....5-57,5s-59
DAMAGED OR WORN THREADS -
STANDARD PROCEDURE, REPAIR OF . . 9-10,9-86
DAMPER - INSTALLATION, VIBRATION . . . 9-130,
9-47
DAMPER - REMOVAL, VIBRATION . . . 9-130,9-47
DATA BUS COMMUNICATION RECEIVE -
PCM INPUT - OPERATION..............8E-15
DATA LINK CONNECTOR - DESCRIPTION . . . 8E-6
DATA LINK CONNECTOR - OPERATION.....8E-7
DAY / NIGHT MIRROR - DESCRIPTION,
AUTOMATIC..........................8N-47
DAY / NIGHT MIRROR - DIAGNOSIS AND
TESTING, AUTOMATIC................8N-47
DAY / NIGHT MIRROR - OPERATION,
AUTOMATIC........................8N-47
DEAERATION - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-4
DECOUPLER PULLEY - DESCRIPTION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - DIAGNOSIS AND
TESTING, GENERATOR...........8F-25,8F-27
DECOUPLER PULLEY - INSTALLATION,
GENERATOR....................8F-26,8F-28
DECOUPLER PULLEY - OPERATION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - REMOVAL,
GENERATOR....................8F-26,8F-28
DEFINITION - DESCRIPTION, TRIP........25-1
DEFLECTOR - INSTALLATION, WIND.....23-121
DEFLECTOR - REMOVAL, WIND........23-121
DEFOGGER RELAY - DESCRIPTION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - INSTALLATION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - OPERATION, REAR
WINDOW............................8G-3
DEFOGGER RELAY - REMOVAL, REAR
WINDOW............................8G-3
DEFOGGER SWITCH - DESCRIPTION,
REAR WINDOW.......................8G-4
DEFOGGER SWITCH - OPERATION, REAR
WINDOW............................8G-4
DEFOGGER SYSTEM - DIAGNOSIS AND
TESTING, REAR WINDOW..............8G-2
DEFROSTER DUCT - INSTALLATION......24-50
DEFROSTER DUCT - REMOVAL..........24-50
DEMAGNETIZING - STANDARD
PROCEDURE, COMPASS...............8M-4
DEMISTER DUCTS - INSTALLATION,
INSTRUMENT PANEL..................24-55
DEMISTER DUCTS - REMOVAL,
INSTRUMENT PANEL..................24-55
DEMISTER OUTLET - INSTALLATION.....24-46
DEMISTER OUTLET - REMOVAL.........24-45
DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER AN
AIRBAG.............................8O-3
DETECTION ASSY - INSTALLATION,
NATURAL VAC LEAK
..................25-13
DETECTION ASSY - REMOVAL, NATURAL
VAC LEAK
..........................25-13
DETECTION PUMP - INSTALLATION,
LEAK
..............................25-13
DETECTION PUMP - REMOVAL, LEAK
....25-13
DEVICES - STANDARD PROCEDURE,
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE
........................8W-01-8DIAGNOSTIC SYSTEM - DIAGNOSIS AND
TESTING, ON-BOARD.................8F-21
DIAGNOSTIC TROUBLE CODES -
STANDARD PROCEDURE, OBTAINING.....8E-15
DIAGRAMS - 41TE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21-169
DIAGRAMS - 4XTE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21s-75
DIAGRAMS - DESCRIPTION, HOW TO
USE WIRING......................8W-01-1
DIAGRAMS - SPECIAL TOOLS,
SCHEMATICS.......................21s-89
DIESEL - DESCRIPTION, 2.5L...........19-51
DIESEL - DIAGNOSIS AND TESTING,
SYSTEM CHARGE LEVEL TEST - 2.5L....24-68
DIESEL - INSTALLATION, 2.5L..........19-52
DIESEL - REMOVAL, 2.5L..............19-51
DIESEL ENGINE - DESCRIPTION, FUEL
REQUIREMENTS.......................0-6
DIESEL ENGINES - DESCRIPTION,
ENGINE OIL...........................0-6
DIESEL ENGINES - EXPORT -
DESCRIPTION........................0-24
DIESEL HEATER WIRING -
INSTALLATION, SUPPLEMENTAL........24-119
DIESEL HEATER WIRING - REMOVAL,
SUPPLEMENTAL....................24-119
DIESEL SUPPLEMENTAL CABIN HEATER
- DIAGNOSIS AND TESTING...........24-113
DIFFERENTIAL - ASSEMBLY............21-66
DIFFERENTIAL - DESCRIPTION...........21-62
DIFFERENTIAL - DISASSEMBLY.........21-62
DIFFERENTIAL - OPERATION............21-62
DIFFERENTIAL ASSEMBLY -
DESCRIPTION........................3-39
DIFFERENTIAL ASSEMBLY - OPERATION . . . 3-39
DIFFERENTIAL ASSEMBLY FLUID
CHANGE - STANDARD PROCEDURE.......3-40
DIFFERENTIAL BEARING PRELOAD -
ADJUSTMENT......................21-199
DIFFERENTIAL BEARING PRELOAD
MEASUREMENT AND ADJUSTMENT,
ADJUSTMENTS....................21s-100
DIFFERENTIAL CARRIER SEAL -
INSTALLATION........................21-9
DIFFERENTIAL CARRIER SEAL -
REMOVAL...........................21-9
DIFFERENTIAL SIDE GEAR END PLAY -
ADJUSTMENT.......................21-70
DIFFERENTIAL TURNING TORQUE -
ADJUSTMENT.......................21-69
DIMENSIONS - SPECIFICATIONS, BODY
OPENING..........................23-127
DIMENSIONS, SPECIFICATIONS - FRAME . . . 13-4
DIODE - INSTALLATION............8W-01-14
DIODE - REMOVAL................8W-01-14
DISC AND PRESSURE PLATE - 2.5L TD -
INSTALLATION, CLUTCH................6-12
DISC AND PRESSURE PLATE - 2.5L TD -
REMOVAL, CLUTCH....................6-11
DISC BRAKE CALIPER - INSTALLATION,
REAR..........................5-30,5s-29
DISC BRAKE CALIPER - REMOVAL,
REAR..........................5-27,5s-26
DISC BRAKE CALIPER ADAPTER -
INSTALLATION, FRONT............5-31,5s-30
DISC BRAKE CALIPER ADAPTER -
REMOVAL, FRONT................5-31,5s-30
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - INSTALLATION,
FRONT.............................5s-26
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - REMOVAL, FRONT.....5s-23
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - INSTALLATION, FRONT........5-27
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - INSTALLATION, FRONT
........5-27
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-31
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) - REMOVAL
.......5-31
10 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2557 of 2585

FILL/CHECK LOCATIONS - DESCRIPTION,
FLUID...............................0-7
FILLER CAP - DESCRIPTION, FUEL.......25-12
FILLER CAP - OPERATION, FUEL........25-12
FILLER NECK SEAL - DIAGNOSIS AND
TESTING, RADIATOR CAP TO............7-27
FILLER TUBE - INSTALLATION, FUEL
TANK ..............................14-13
FILLER TUBE - REMOVAL, FUEL TANK....14-12
FILLING - STANDARD PROCEDURE,
COOLING SYSTEM.....................7-5
FILLING - STANDARD PROCEDURE,
REAR HEATER CORE.................24-101
FILTER - DESCRIPTION, AIR............24-43
FILTER - DESCRIPTION, OIL.............9-53
FILTER - INSTALLATION, AIR...........24-44
FILTER - INSTALLATION, INLET..........14-13
FILTER - INSTALLATION, OIL.......9-139,9-53
FILTER - REMOVAL, AIR...............24-43
FILTER - REMOVAL, INLET.............14-13
FILTER - REMOVAL, OIL...........9-139,9-53
FILTER ADAPTER - INSTALLATION, OIL . . . 9-139
FILTER ADAPTER - REMOVAL, OIL.......9-139
FILTER CHANGE - STANDARD
PROCEDURE, ENGINE OIL..........9-137,9-53
FILTER SERVICE - STANDARD
PROCEDURE, FLUID..........21-203,21s-104
FINAL DRIVE - ASSEMBLY......21-195,21s-99
FINAL DRIVE - DESCRIPTION............21s-95
FINAL DRIVE - DISASSEMBLY....21-190,21s-96
FINAL DRIVE - OPERATION............21s-96
FINESSE SANDING/BUFFING &
POLISHING - DESCRIPTION............23-85
FINISH - DESCRIPTION, BASE
COAT/CLEARCOAT....................23-85
FIRING ORDER, SPECIFICATIONS.........8I-3
FIRST ROW - BENCH - INSTALLATION,
SEAT BELT BUCKLE..................8O-13
FIRST ROW - BENCH - REMOVAL, SEAT
BELT BUCKLE.......................8O-13
FIRST ROW - OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR........................8O-14
FIRST ROW - OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR.............8O-14
FIRST ROW INBOARD - QUAD BUCKET -
INSTALLATION, SEAT BELT BUCKLE......8O-12
FIRST ROW INBOARD - QUAD BUCKET -
REMOVAL, SEAT BELT BUCKLE.........8O-12
FITTING - CONNECTING ROD............9-45
FITTING - PISTON RING................9-45
FITTING - STANDARD PROCEDURE,
MAIN BEARING......................9-123
FITTING - STANDARD PROCEDURE,
PISTON RING.......................9-121
FITTING - STANDARD PROCEDURE,
PISTON TO CYLINDER BORE............9-42
FITTING CONNECTING RODS -
STANDARD PROCEDURE...............9-116
FITTING PISTONS - STANDARD
PROCEDURE........................9-117
FITTINGS - STANDARD PROCEDURE,
HANDLING TUBING...................24-70
FITTINGS - STANDARD PROCEDURE,
QUICK-CONNECT.....................14-14
FLANGE SEAL - INSTALLATION, INPUT....3-45
FLANGE SEAL - INSTALLATION, OUTPUT . . . 3-46
FLANGE SEAL - REMOVAL, INPUT
........3-44
FLANGE SEAL - REMOVAL, OUTPUT
.......3-45
FLANGE SHIM SELECTION,
ADJUSTMENTS - OUTPUT
...............21-7
FLAP AND SPRING ASSEMBLY -
INSTALLATION, QUAD BUCKET SEAT
SIDE SHIELD/CUPHOLDER
............23-107
FLAP AND SPRING ASSEMBLY -
REMOVAL, QUAD BUCKET SEAT SIDE
SHIELD/CUPHOLDER
.................23-107
FLEX DRIVE - DESCRIPTION
...........8N-36
FLEX DRIVE - INSTALLATION
...........8N-37
FLEX DRIVE - OPERATION
.............8N-36
FLEX DRIVE - REMOVAL
...............8N-37
FLEX PLATE - INSTALLATION
...........9-131
FLEX PLATE - REMOVAL
...............9-131
FLEXIBLE FUEL ENGINE OIL -
DESCRIPTION
.........................0-3
FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - INSTALLATION
............23-83FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - REMOVAL................23-83
FLOOR CONSOLE TRAY - INSTALLATION . . 23-83
FLOOR CONSOLE TRAY - REMOVAL......23-83
FLOOR DISTRIBUTION DUCTS -
INSTALLATION.......................24-50
FLOOR DISTRIBUTION DUCTS -
REMOVAL..........................24-50
FLOOR HEAT DUCT - INSTALLATION,
REAR..............................24-63
FLOOR HEAT DUCT - REMOVAL, REAR . . . 24-62
FLOOR MATS - INSTALLATION, CARPETS . 23-76
FLOOR MATS - REMOVAL, CARPETS.....23-75
FLOW AND PRESSURE TEST -
DIAGNOSIS AND TESTING, POWER
STEERING SYSTEM....................19-1
FLOW CHECK - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-3
FLUID - DESCRIPTION, AUTOMATIC/
MANUAL TRANSAXLE...................0-4
FLUID - DESCRIPTION, AWD POWER
TRANSFER UNIT.......................0-6
FLUID AND FILTER SERVICE -
STANDARD PROCEDURE.......21-203,21s-104
FLUID CAPACITIES - SPECIFICATIONS......0-6
FLUID CHANGE - STANDARD
PROCEDURE, DIFFERENTIAL
ASSEMBLY..........................3-40
FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH
HOUSING............................3-41
FLUID CHANGE - STANDARD
PROCEDURE, PTU......................21-5
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING, BRAKE.............5-32,5s-31
FLUID COOLER - DESCRIPTION.........19-44
FLUID COOLER - INSTALLATION.........19-45
FLUID COOLER - OPERATION...........19-44
FLUID COOLER - REMOVAL............19-44
FLUID DRAIN AND FILL - STANDARD
PROCEDURE........................21-71
FLUID FILL/CHECK LOCATIONS -
DESCRIPTION.........................0-7
FLUID LEAK DIAGNOSIS, DIAGNOSIS
AND TESTING........................21-3
FLUID LEAKAGE - DIAGNOSIS AND
TESTING, TORQUE CONVERTER
HOUSING....................21-123,21s-31
FLUID LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE.......21-201,21s-102
FLUID LEVEL CHECK - STANDARD
PROCEDURE........................21-71
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE..............5-32,5s-31
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING........19-44
FLUID LEVEL INSPECTION - STANDARD
PROCEDURE.........................21-4
FLUID LEVEL SWITCH - DESCRIPTION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - INSTALLATION,
BRAKE.........................5-11,5s-10
FLUID LEVEL SWITCH - INSTALLATION,
WASHER...........................8R-12
FLUID LEVEL SWITCH - OPERATION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - REMOVAL,
BRAKE
.........................5-11,5s-10
FLUID LEVEL SWITCH - REMOVAL,
WASHER
...........................8R-12
FLUID, SPECIFICATIONS - BRAKE
....5-33,5s-32
FLUIDS - DESCRIPTION, AWD REAR
DRIVELINE MODULE
....................0-6
FLUSH MEASUREMENTS -
SPECIFICATIONS, GAP
................23-124
FLYWHEEL - INSTALLATION
.............6-12
FLYWHEEL - REMOVAL
.................6-12
FOG LAMP - DIAGNOSIS AND TESTING,
FRONT
..............................8L-7
FOG LAMP - INSTALLATION, FRONT
.......8L-8
FOG LAMP - REMOVAL, FRONT
..........8L-8
FOG LAMP UNIT ALIGNMENT - EXPORT
- STANDARD PROCEDURE, FRONT
........8L-9
FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE, FRONT
.........8L-9
FOLDAWAY MIRROR SWITCH - EXPORT
- DESCRIPTION, POWER
..............8N-48FOLDAWAY MIRROR SWITCH - EXPORT
- INSTALLATION, POWER..............8N-49
FOLDAWAY MIRROR SWITCH - EXPORT
- OPERATION, POWER................8N-48
FOLDAWAY MIRROR SWITCH - EXPORT
- REMOVAL, POWER..................8N-48
FORK AND SHAFT - DESCRIPTION,
SHIFT.............................21-113
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE . . 9-11,9-84
FRAME DIMENSIONS, SPECIFICATIONS....13-4
FRONT - DESCRIPTION, HALF SHAFT.......3-1
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL.......................9-127,9-40
FRONT - INSTALLATION, HALF SHAFT......3-4
FRONT - INSTALLATION, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - INSTALLATION, SPRING
MOUNTS............................2-44
FRONT - INSTALLATION, WHEEL
MOUNTING STUDS...................22-21
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL..........................9-127,9-40
FRONT - REMOVAL, HALF SHAFT..........3-2
FRONT - REMOVAL, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - REMOVAL, SPRING MOUNTS.....2-43
FRONT - REMOVAL, WHEEL MOUNTING
STUDS.............................22-20
FRONT - SPECIFICATIONS, HALF SHAFT . . . 3-15,
3-6
FRONT BRAKE ROTOR - INSTALLATION.....5-54,
5s-57
FRONT BRAKE ROTOR - REMOVAL . . . 5-54,5s-57
FRONT BUMPER REINFORCEMENT -
INSTALLATION........................13-2
FRONT BUMPER REINFORCEMENT -
REMOVAL...........................13-2
FRONT BUSHING - INSTALLATION, LEAF
SPRING.............................2-30
FRONT BUSHING - REMOVAL, LEAF
SPRING.............................2-29
FRONT CABLE - INSTALLATION.....5-64,5s-67
FRONT CABLE - INSTALLATION,
PARKING BRAKE LEVER...........5-66,5s-69
FRONT CABLE - REMOVAL.........5-64,5s-67
FRONT CABLE - REMOVAL, PARKING
BRAKE LEVER...................5-65,5s-68
FRONT CONTROL MODULE -
DESCRIPTION........................8E-7
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING........................8E-7
FRONT CONTROL MODULE -
INSTALLATION........................8E-8
FRONT CONTROL MODULE - OPERATION . . 8E-7
FRONT CONTROL MODULE - REMOVAL....8E-8
FRONT CRADLE CROSSMEMBER -
DESCRIPTION........................13-9
FRONT CRADLE CROSSMEMBER
THREAD REPAIR - DESCRIPTION
.........13-9
FRONT CROSSMEMBER MOUNT
BUSHINGS - INSTALLATION
............13-12
FRONT CROSSMEMBER MOUNT
BUSHINGS - REMOVAL
................13-12
FRONT DISC BRAKE CALIPER ADAPTER
- INSTALLATION
.................5-31,5s-30
FRONT DISC BRAKE CALIPER ADAPTER
- REMOVAL
.....................5-31,5s-30
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
INSTALLATION
.......................5s-26
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
REMOVAL
..........................5s-23
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - INSTALLATION
.....5-27
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - REMOVAL
.........5-24
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-27
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) - REMOVAL
.......5-24
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - INSTALLATION
..............5s-26
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - REMOVAL
.................5s-23
14 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2568 of 2585

PINS (DISC/DRUM BRAKES) -
INSTALLATION, DISC BRAKE CALIPER
GUIDE..............................5-31
PINS (DISC/DRUM BRAKES) - REMOVAL,
DISC BRAKE CALIPER GUIDE............5-31
PINS (TRW BRAKES) - INSTALLATION,
DISC BRAKE CALIPER GUIDE...........5s-30
PINS (TRW BRAKES) - REMOVAL, DISC
BRAKE CALIPER GUIDE................5s-30
PIPE - 3.3/3.8L - INSTALLATION,
CROSS-OVER........................11-6
PIPE - 3.3/3.8L - REMOVAL, CROSS-
OVER...............................11-6
PIPE - INSTALLATION, AIR INTAKE......24-114
PIPE - REMOVAL, AIR INTAKE.........24-113
PISTON & CONNECTING ROD -
DESCRIPTION...................9-116,9-42
PISTON & CONNECTING ROD -
INSTALLATION........................9-44
PISTON & CONNECTING ROD -
REMOVAL...........................9-43
PISTON AND SEAL - ASSEMBLY,
CALIPER..............5-26,5-29,5s-25,5s-28
PISTON AND SEAL - DISASSEMBLY,
CALIPER..............5-24,5-28,5s-23,5s-27
PISTON RING, FITTING.................9-45
PISTON RING FITTING - STANDARD
PROCEDURE........................9-121
PISTON RINGS - INSTALLATION.........9-121
PISTON RINGS - REMOVAL............9-121
PISTON TO CYLINDER BORE FITTING -
STANDARD PROCEDURE................9-42
PISTONS - STANDARD PROCEDURE,
FITTING............................9-117
PLANETARY GEARTRAIN -
DESCRIPTION...............21-232,21s-132
PLANETARY GEARTRAIN - OPERATION . . 21-232,
21s-132
PLASTIC BODY PANEL REPAIR -
STANDARD PROCEDURE................23-3
PLASTIC GROCERY BAG RETAINER -
INSTALLATION......................23-105
PLASTIC GROCERY BAG RETAINER -
REMOVAL.........................23-104
PLASTIGAGE - STANDARD PROCEDURE,
MEASURING BEARING CLEARANCE
USING..........................9-12,9-84
PLATE - 2.5L TD - INSTALLATION,
CLUTCH DISC AND PRESSURE...........6-12
PLATE - 2.5L TD - REMOVAL, CLUTCH
DISC AND PRESSURE..................6-11
PLATE - DESCRIPTION, BODY CODE....Intro.-1
PLATE - DESCRIPTION, MANUFACTURER . Intro.-11
PLATE - DRUM BRAKE - INSTALLATION,
SUPPORT.......................5-56,5s-58
PLATE - DRUM BRAKE - REMOVAL,
SUPPORT.......................5-56,5s-58
PLATE - INSTALLATION, DOOR SILL
TRIM..............................23-77
PLATE - INSTALLATION, FLEX...........9-131
PLATE - INSTALLATION, LIFTGATE SILL . . . 23-79
PLATE - INSTALLATION, SLIDING DOOR
SILL...............................23-82
PLATE - INSTALLATION, STEERING
COLUMN COVER BACKING.............23-70
PLATE - REMOVAL, DOOR SILL TRIM....23-77
PLATE - REMOVAL, FLEX..............9-131
PLATE - REMOVAL, LIFTGATE SILL.......23-79
PLATE - REMOVAL, SLIDING DOOR SILL . . 23-82
PLATE - REMOVAL, STEERING COLUMN
COVER BACKING.....................23-70
PLATE BATTERY CHARGING -
STANDARD PROCEDURE, SPIRAL........8F-10
PLATE MISALIGNMENT - DIAGNOSIS
AND TESTING, DRIVE...................6-6
PLATES - ADHESIVE ATTACHED -
INSTALLATION, EXTERIOR NAME........23-51
PLATES - ADHESIVE ATTACHED -
REMOVAL, EXTERIOR NAME............23-51
PLATES - TAPE ATTACHED -
INSTALLATION, EXTERIOR NAME
........23-51
PLATES - TAPE ATTACHED - REMOVAL,
EXTERIOR NAME
.....................23-51
PLATINUM PLUGS - DESCRIPTION
........8I-9
PLAY - ADJUSTMENT, DIFFERENTIAL
SIDE GEAR END
.....................21-70
PLAY - STANDARD PROCEDURE,
CRANKSHAFT END
................9-36,9s-6PLAY - STANDARD PROCEDURE,
MEASURING CAMSHAFT END............9-29
PLAY - STANDARD PROCEDURE,
MEASURING CRANKSHAFT END.........9-125
PLAYER - DESCRIPTION, DVD...........8A-8
PLAYER - INSTALLATION, DVD...........8A-8
PLAYER - OPERATION, DVD.............8A-8
PLAYER - REMOVAL, DVD..............8A-8
PLUG CABLE - DESCRIPTION, SPARK.....8I-10
PLUG CABLE RESISTANCE,
SPECIFICATIONS - SPARK...............8I-2
PLUG, SPECIFICATIONS - SPARK.........8I-2
PLUGS - DESCRIPTION, PLATINUM........8I-9
PLUGS - STANDARD PROCEDURE,
ENGINE CORE AND OIL GALLERY....9-10,9-86
POINTS - DESCRIPTION, LUBRICATION.....0-7
POLISHING - DESCRIPTION, FINESSE
SANDING/BUFFING...................23-85
PORT REPAIR - STANDARD
PROCEDURE, INTAKE MANIFOLD
VACUUM...........................9-145
PORT VALVE CORE - DESCRIPTION,
SERVICE...........................24-94
PORT VALVE CORE - INSTALLATION,
SERVICE...........................24-94
PORT VALVE CORE - REMOVAL,
SERVICE...........................24-94
POSITION SENSOR - DESCRIPTION,
CAMSHAFT...........................8I-4
POSITION SENSOR - DESCRIPTION,
CRANKSHAFT.......................14-25
POSITION SENSOR - DESCRIPTION,
THROTTLE..........................14-36
POSITION SENSOR - OPERATION,
CAMSHAFT...........................8I-4
POSITION SENSOR - OPERATION,
CRANKSHAFT.......................14-25
POSITION SENSOR - OPERATION,
THROTTLE..........................14-36
POSITION SENSOR - REMOVAL,
CRANKSHAFT.......................14-25
POTENTIAL - STANDARD PROCEDURE,
TESTING OF VOLTAGE..............8W-01-9
POWER - INSTALLATION, WINDOW
REGULATOR........................23-22
POWER - REMOVAL, WINDOW
REGULATOR........................23-22
POWER ADJUSTER - INSTALLATION,
FRONT SEAT TRACK..................23-95
POWER ADJUSTER - REMOVAL, FRONT
SEAT TRACK........................23-95
POWER BRAKE BOOSTER -
DESCRIPTION...................5-40,5s-43
POWER BRAKE BOOSTER - DIAGNOSIS
AND TESTING...................5-41,5s-44
POWER BRAKE BOOSTER - OPERATION . . . 5-41,
5s-44
POWER DISTRIBUTION SYSTEM -
DESCRIPTION.....................8W-97-1
POWER DISTRIBUTION SYSTEM -
OPERATION.......................8W-97-1
POWER DISTRIBUTION SYSTEMS,
SPECIAL TOOLS...................8W-97-1
POWER DOOR LEARN CYCLE -
STANDARD PROCEDURE..............8N-28
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - DESCRIPTION...............8N-48
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - INSTALLATION..............8N-49
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - OPERATION................8N-48
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - REMOVAL..................8N-48
POWER LIFTGATE CONTROL MODULE -
DESCRIPTION.......................8E-10
POWER LIFTGATE CONTROL MODULE -
INSTALLATION.......................8E-11
POWER LIFTGATE CONTROL MODULE -
OPERATION.........................8E-11
POWER LIFTGATE CONTROL MODULE -
REMOVAL
..........................8E-11
POWER LIFTGATE LEARN CYCLE -
STANDARD PROCEDURE
...............8N-9
POWER LIFTGATE SYSTEM -
DESCRIPTION
........................8N-2
POWER LIFTGATE SYSTEM - DIAGNOSIS
AND TESTING
........................8N-4
POWER LIFTGATE SYSTEM - OPERATION
. . 8N-3POWER LOCKS - DESCRIPTION.....8N-1,8N-38
POWER LOCKS - OPERATION......8N-2,8N-39
POWER MIRRORS - DESCRIPTION......8N-45
POWER MIRRORS - DIAGNOSIS AND
TESTING...........................8N-46
POWER MIRRORS - OPERATION........8N-45
POWER MODULE - BLOWER MOTOR -
DESCRIPTION.......................24-31
POWER MODULE - BLOWER MOTOR -
INSTALLATION.......................24-32
POWER MODULE - BLOWER MOTOR -
OPERATION.........................24-31
POWER MODULE - BLOWER MOTOR -
REMOVAL..........................24-31
POWER MODULE - DESCRIPTION,
INTEGRATED......................8W-97-2
POWER MODULE - INSTALLATION,
INTEGRATED......................8W-97-3
POWER MODULE - OPERATION,
INTEGRATED......................8W-97-2
POWER MODULE - REAR BLOWER
MOTOR - DESCRIPTION...............24-41
POWER MODULE - REAR BLOWER
MOTOR - INSTALLATION...............24-42
POWER MODULE - REAR BLOWER
MOTOR - OPERATION.................24-41
POWER MODULE - REAR BLOWER
MOTOR - REMOVAL..................24-41
POWER MODULE - REMOVAL,
INTEGRATED......................8W-97-2
POWER OUTLET - DESCRIPTION......8W-97-4
POWER OUTLET - DIAGNOSIS &
TESTING.........................8W-97-4
POWER OUTLET - OPERATION........8W-97-4
POWER SEAT SYSTEM - DIAGNOSIS
AND TESTING...................8N-52,8N-9
POWER SEAT SYSTEM - OPERATION....8N-52,
8N-9
POWER SEAT TRACK - DESCRIPTION,
DRIVER.......................8N-15,8N-58
POWER SEAT TRACK - DESCRIPTION,
PASSENGER...................8N-16,8N-59
POWER SEAT TRACK - DIAGNOSIS AND
TESTING......................8N-17,8N-60
POWER SEAT TRACK - DIAGNOSIS AND
TESTING, DRIVER...............8N-15,8N-58
POWER SEAT TRACK - INSTALLATION,
DRIVER.......................8N-16,8N-59
POWER SEAT TRACK - INSTALLATION,
PASSENGER...................8N-18,8N-61
POWER SEAT TRACK - OPERATION,
DRIVER.......................8N-15,8N-58
POWER SEAT TRACK - OPERATION,
PASSENGER...................8N-17,8N-60
POWER SEAT TRACK - REMOVAL,
DRIVER.......................8N-16,8N-59
POWER SEAT TRACK - REMOVAL,
PASSENGER...................8N-18,8N-61
POWER SLIDING DOOR SYSTEM -
DESCRIPTION.......................8N-19
POWER SLIDING DOOR SYSTEM -
DIAGNOSIS AND TESTING.............8N-22
POWER SLIDING DOOR SYSTEM -
OPERATION.........................8N-21
POWER STEERING BELT TENSION -
STANDARD PROCEDURE, CHECKING.......7-8
POWER STEERING FASTENER TORQUE,
SPECIFICATIONS......................19-9
POWER STEERING FLUID LEVEL
CHECKING - STANDARD PROCEDURE....19-44
POWER STEERING GEAR, SPECIAL
TOOLS.............................19-34
POWER STEERING PUMP INITIAL
OPERATION - STANDARD PROCEDURE . . . 19-37
POWER STEERING PUMP, SPECIAL
TOOLS.............................19-43
POWER STEERING, SPECIAL TOOLS......19-9
POWER STEERING SYSTEM -
DESCRIPTION........................19-1
POWER STEERING SYSTEM -
OPERATION
..........................19-1
POWER STEERING SYSTEM FLOW AND
PRESSURE TEST - DIAGNOSIS AND
TESTING
............................19-1
POWER TRANSFER UNIT - DESCRIPTION
. . 21-1
POWER TRANSFER UNIT - OPERATION
....21-3
POWER TRANSFER UNIT FLUID -
DESCRIPTION, AWD
....................0-6
RSINDEX25
Description Group-Page Description Group-Page Description Group-Page