check engine Citroen BERLINGO 2005 1.G Workshop Manual
[x] Cancel search | Manufacturer: CITROEN, Model Year: 2005, Model line: BERLINGO, Model: Citroen BERLINGO 2005 1.GPages: 462, PDF Size: 10.48 MB
Page 274 of 462

Downloaded from www.Manualslib.com manuals search engine 268
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
- Fuel high pressure pump pulley (21).
- Guide roller (15).
- Crankshaft pinion (19).
- Coolant pump pinion (16).
- Tensioner roller (18).
Position tool [1]on the belt at «a».
Remove tools [4]and [9].
Turn the tensioner roller (18)anti-clockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEMunits.
Tighten screw (17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool [6].
Tighten the accessories drive pulley screw (8)to 7 ± 0,7 m.da N.
Remove tools [1], [3], [5]and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
- The crankshaft, using tool [3].
- The camshaft drive pulley, using tool [5].
B1EP1ABD
B1EP1ACC
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 268
Page 275 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 269
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Lock the engine flywheel, using tool [6].
Slacken the accessories drive pul Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 269
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Lock the engine flywheel, using tool [6].
Slacken the accessories drive pul](/img/9/4138/w960_4138-274.png)
Downloaded from www.Manualslib.com manuals search engine 269
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Lock the engine flywheel, using tool [6].
Slacken the accessories drive pulley (8).
The screw (17)of the tensioner roller (18).
Fit the tool [1].
Turn the tensioner roller, using tool [2], to attain a tension of: 54 ± 2 SEEMunits.
Tighten screw (17)of the tensioner roller (18)to 2,5 ± 0,2 m.daN.
Remove tool [1].
Fit tool [1].
The tension value should be: 54 ± 3 SEEMunits.
ESSENTIAL: If the value is incorrect, recommence the operation.
Remove tools [1], [3], [5]and [6].
Rotate the crankshaft two times in the normal direction of rotation.
Peg:
- The crankshaft, using tool [3].
- The camshaft drive pulley.
IMPERATIVE: If the pegging is not possible, recommence the operation.
B1EP1ACC
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 269
Page 276 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 270
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- Tools [3]and [5], Screw (7)and the spacer.
Refit:
- The lower, i Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 270
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- Tools [3]and [5], Screw (7)and the spacer.
Refit:
- The lower, i](/img/9/4138/w960_4138-275.png)
Downloaded from www.Manualslib.com manuals search engine 270
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- Tools [3]and [5], Screw (7)and the spacer.
Refit:
- The lower, intermediate and upper covers (5).
- Screw (7), tighten to 1,5 ± 0,1 m.daN.
- Screws (3), (4)and (6).
- The bracket (13).
Screws (11), tighten to 6,1 ± 0,5 m.daN.
The nut (12), tighten to 4,5 ± 0,5 m.daN.
Fit the bearing shell (10).
Take away the workshop hoist.
Clip the fuel delivery and return pipes.
Remove the tool [7].
Couple:
- The fuel delivery pipe (12).
- The fuel return pipe (1).
- Coat the screw (8)with loctite FRENETANCH.
Refit the tool [6]and the screw (8)with the washer (22), tighten to 7 ± 0,2 m.daN
and angular tighten to A= 60°±5°.
Refit the torque reaction rod on the lower engine support.
Remove the tool [6].
Reposition and reclip the cooling hose.
Complete the refitting of components in reverse order to removal.
B1EP1A7CB1BP2R4CB1EP1ADC
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 270
Page 277 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 271
ENGINE
CHECKING THE VALVE TIMING
Engine: RHR
Tools.
[1] Kit of plugs: (-).0188.T
[2] Double flywheel setting peg: (-).0188.X Toolkit 0188-T Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 271
ENGINE
CHECKING THE VALVE TIMING
Engine: RHR
Tools.
[1] Kit of plugs: (-).0188.T
[2] Double flywheel setting peg: (-).0188.X Toolkit 0188-T](/img/9/4138/w960_4138-276.png)
Downloaded from www.Manualslib.com manuals search engine 271
ENGINE
CHECKING THE VALVE TIMING
Engine: RHR
Tools.
[1] Kit of plugs: (-).0188.T
[2] Double flywheel setting peg: (-).0188.X Toolkit 0188-T
[3]Camshaft setting peg: (-).0188.M
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Remove the engine cover and the battery.
Disconnect the negative terminal of the battery.
Raise and support the front of the vehicle.
Remove the under-engine sound-deadening and the front RH splash-shield.
Uncouple, plug and move aside, using tool [1], the fuel supply and fuel return pipes..
Suspend the engine, using a workshop hoist.
Remove the engine support bracket and the engine support.
Move aside the electrical harness (1).
Remove:
- The camshaft position sensor.
- The inlet cylinder head cover (2).
- The upper timing cover screws.
- The upper timing cover (3).
B1EP1GFC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 271
Page 278 of 462

Downloaded from www.Manualslib.com manuals search engine 272
ENGINECHECKING THE VALVE TIMING
Engine: RHR
Checks.
Turn the crankshaft in the normal direction of rotation.
Line up the black markings «b»and «c»on the chain with the teeth «a»and «d» of the camshaft drive
pinions
(40 turnsof the camshafts maximum).
IMPERATIVE: If it is impossible to line up the markings on the chain with the camshaft drive
pinions, repeat the setting of the camshafts
(see operation: removing-refitting camshafts).
Peg:
- The crankshaft, using tool [2].
- The camshaft pinion, using tool [3].
Remove tools [1]and [3].
Complete the refitting.
B1EP1FND
B1BP31FC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 272
Page 279 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 273
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Tools.
[1]Kit of plugs: (-).0188.T
[2]Double flywheel setting peg: (-).0188.X
[3]C Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 273
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Tools.
[1]Kit of plugs: (-).0188.T
[2]Double flywheel setting peg: (-).0188.X
[3]C](/img/9/4138/w960_4138-278.png)
Downloaded from www.Manualslib.com manuals search engine 273
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Tools.
[1]Kit of plugs: (-).0188.T
[2]Double flywheel setting peg: (-).0188.X
[3]Camshaft setting peg: (-).0188.M
[4]Belt clamp: (-).0188.AD
[5]Pinion centrer: (-).0188.AH
[6]Flywheel lock: (-).0188.F
[7]Pulley(-).0188.P
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel injection (HDi) engine versions.
Removing.
Slacken the front RH wheel bolts.
Raise and support the front RH side of the vehicle.
Disconnect the negative terminal of the battery.
Remove:
- The under-engine sound-deadening.
- The front RH wheel.
- The front RH splash-shield.
- The engine cover.
Remove the auxiliaries drive belt
(see corresponding operation).
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 273
Page 280 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 274
ENGINE
274
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Uncouple, plug and move aside, using tool [7],
the fuel delivery pipe (1)and t Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 274
ENGINE
274
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Uncouple, plug and move aside, using tool [7],
the fuel delivery pipe (1)and t](/img/9/4138/w960_4138-279.png)
Downloaded from www.Manualslib.com manuals search engine 274
ENGINE
274
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Uncouple, plug and move aside, using tool [7],
the fuel delivery pipe (1)and the fuel return pipe (2).
Suspend the engine, using a workshop hoist.
Remove the bracket (3)and the RH engine
support (4).
Move aside the electrical harness (5).
Remove:
- The upper timing cover screws.
- The upper timing cover (6).
Rotate the engine by means of the auxiliaries drive
pulley.
Orient the camshaft pinion in the pegging position,
use a mirror if necessary.
Peg the camshaft, using tool [3].
Peg the engine flywheel, using tool [2].
Lock the flywheel, using tool [6].
B1BP351C
B1EP1FAC
B1EP1FBC
B1BP31EC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 274
Page 281 of 462

Downloaded from www.Manualslib.com manuals search engine 275
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Remove:
- The screw (8).
- The auxiliaries drive pulley (7).
- The crankshaft position sensor (11).
- The lower timing cover (9).
- The target of the crankshaft position sensor (10), using tool [7].
- The lower torque reaction rod.
- The tool [6].
Slacken the screw (12)of the tensioner roller (17).
Remove the timing belt (13).
Checks.
IMPERATIVE: Just before refitting, carry out the checks below.
Check:
- That the rollers (14)and (17)turn freely
(without play and without
any tight spot).
- That the coolant pump pulley (16)turns freely (without play and
without any tight spot).
- That there are no traces of oil leaks from the crankshaft and
camshaftseals, etc.
- That the crankshaft pinion travels freely on the keyway (15).
Replace defective components if necessary.
B1EP1FCC
B1EP1FDC
B1EP1FEC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 275
Page 282 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 276
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
Centre the crankshaft pinion (15), using tool [5].
Reposition the timimg Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 276
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
Centre the crankshaft pinion (15), using tool [5].
Reposition the timimg](/img/9/4138/w960_4138-281.png)
Downloaded from www.Manualslib.com manuals search engine 276
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
Centre the crankshaft pinion (15), using tool [5].
Reposition the timimg belt on the pulley (18).
Put the tool [4]in place
(tighten moderately).
Reposition the timimg belt, strip «a»well tensioned
in the following order:
- Guide roller (14).
- Crankshaft pinion (15).
- Coolant pump pinion (16).
- Tensioner roller (17).
Remove tools [4]and [5].
Bring the index «d»outside the plate at «c», by
turning the tensioner roller in the direction of the
arrow «b», using a hexagonal spanner at «e».
Tighten screw (12)of the tensioner roller (17)to
2,1 ± 0,2 m.daN.
Lock the flywheel, by means of tool [6].
Refit the auxiliaries drive pulley (7).
Tighten the screw (8)to 7 ± 0,7 m.daN.
Remove tools [6], [2]and [3].
B1EP1FFC
B1EP1FGC
B1EP1FHC
B1EP1FJC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 276
Page 283 of 462

Downloaded from www.Manualslib.com manuals search engine 277
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
Rotate the crankshaft ten times
(in the direction of rotation of the engine).
Peg the crankshaft, using tool [2] and the camshaft drive pinion, using tool [3].
Lock the flywheel, using tool [6].
Slacken the screw (8)of the auxiliaries drive pulley (7) and the screw (12)of
the tensioner roller (17).
Turn the tensioner roller
(clockwise), using a hexagonal spanner at «e».
Position the index «d»opposite the notch «f».
Tighten:
- The screw (12)of the tensioner roller (17)to 2,1 ± 0,2 m.daN.
- The auxiliaries drive pulley to 7 ± 0,7 m.daN.
Remove tools [2], [3]and [6].
Rotate the crankshaft two times
(in the direction of rotation of the engine).
Refit tools [2]and [3].
Check the position of the index «d», it should be opposite the notch «f».
B1EP1FKC
B1EP1FLC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 277