battery Citroen BERLINGO 2005 1.G Owner's Manual
[x] Cancel search | Manufacturer: CITROEN, Model Year: 2005, Model line: BERLINGO, Model: Citroen BERLINGO 2005 1.GPages: 462, PDF Size: 10.48 MB
Page 231 of 462
Downloaded from www.Manualslib.com manuals search engine 225
ENGINE
CHECKING THE VALVE TIMING
Engine: RFK
Checking the timing (continued).
Suspend the engine, using a workshop hoist.
Remove:
- The RH engine support.
- The upper timing cover.
Peg the camshaft pulleys, using tool [1].
NOTE:The pegs [1] should go in without forcing.
WARNING: If the pegs go in only with difficulty, repeat the operation for fitting and tensioning
the timing belt
(see corresponding operation).
Remove the pegs [1]and [2].
Complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following a reconnection of the battery
(see corresponding operation).
B1EP1GRC
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 225
Page 232 of 462
Downloaded from www.Manualslib.com manuals search engine 226
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Tools.
[1]Camshaft setting peg: (-).0189.A
[2]Crankshaft setting peg: (-).0189.R
[3] Timing belt retaining pin: (-) 0189.K
[4]Adaptor for angular tightening: 4069-T
[5]Hub immobilising tool: (-).0189.S
[5a] : (-).0189.S1
[5b] : (-).0189.S2
Pliers for removing plastic pins: 7504-T
IMPERATIVE: Respect the safety and cleanliness requirements.
Checking and setting the timing.
Removing.
Disconnect the negative terminal of the battery
(see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove the auxiliaries drive belt
(see corresponding operation).
Unclip and move aside the fuel supply hose from the timing cover.
Remove the screw (1).
Move aside the power steering pipes.
Turn the engine by means of the screw (4)of the crankshaft pinion (3)to bring it to the pegging position.
B3EP15YC
B1BP36YC
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 226
Page 237 of 462
Downloaded from www.Manualslib.com manuals search engine 231
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Checking and setting the timing (continued).
Refitting (continued).
Remove the tools [1]and [2].
Refit the upper RH engine support.
Remove the workshop hoist.
Rotate the crankshaft ten times
(normal direction of rotation).
IMPERATIVE: No exterior pressure or action should be applied on the timing belt.
Suspend the engine using a workshop hoist.
Remove the upper RH engine support.
Peg the inlet camshaft pulley, using tool [1].
Checking.
Timing belt tension.
IMPERATIVE: Check the position of the index «a», it should be opposite the slot «f». If the position of the index «a» is not correct, repeat
the operations to tension the timig belt.
Complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following a reconnection of the battery
(see corresponding operation).
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 231
Page 238 of 462
Downloaded from www.Manualslib.com manuals search engine 232
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1BP2LXC
Tools.
[1] Pliers for removing plastic pegs: 7504-T
[2]Lever for detensioning the dynamic tensioner roller: (-).0194.E
[3]Engine flywheel setting peg: (-).0194.C
[4] Camshaft setting peg: (-).0194.B
[5]Crankshaft and high pressure pump setting peg: (-).0194.A
Preliminary operations.
Remove:
- The front RH wheel.
- The front RH splash-shield, using tool [1].
- The clips of the electrical harness on the upper timing cover.
- The accessories belt, using tool [2]
(see corresponding operation).
Checking the setting.
Disconnect the battery negative cable.
Remove the upper timing cover (1).
Rotate the engine using the screw (2)of the crankshaft pulley.
NOTE:The locking hole is located under the crankshaft bearing cap cover.
Undo the screw (2).
Detension the auxiliary drive belt dynamic tensioner roller, using tool [2].
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 232
Page 246 of 462
Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the catalytic converter flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 240
Page 248 of 462
Downloaded from www.Manualslib.com manuals search engine 242
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking the timing (continued).
Peg the camshaft at «c», using tool [2]
(oil the pegs).
WARNING: The magnetic track should not show any sign of damage and should not be
approached by any other magnetic source.
Peg the crankshaft at «d», using tool [3].
ESSENTIAL: Should it not be possible to peg the camshaft, check that the offset between
the camshaft pinion hole and the pegging hole is not more than 1 mm. If it is more, repeat
the operation to position the timing belt
(see corresponding operation).
Note : The index «e»of the dynamic tensioner roller should be centred in the interval «f».
Check the correct positioning of the index «e».
If it is not correct, repeat the operation to tension the timing belt
(see corresponding operation).
Remove tools [2]and [3].
Refitting.
Peg the flywheel at «b», using tool [1].
Remove the screw (8).
Refit the upper timing cover (11), lower timing cover (10), the accessories drive pulley (9), the screw (8).
Tightening method for the screw (8):
- Pre-tighten to 3 ± 0,3 m.daN.- Angular tighten: 180° ± 5°.
Remove the tool [1]and complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following a reconnection of the battery
(see corresponding operation).
B1EP1HKC
B1EP1E5C
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 242
Page 249 of 462
Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 243
Page 254 of 462
Downloaded from www.Manualslib.com manuals search engine 248
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
IMPERATIVE: Should it be impossible to peg the camshaft, check that the offset between the camshaft hole and the pegging hole is not
more than 1 mm. If the offset is too great, repeat the operation to position the timing belt
(see corresponding operation).
Remove the tools [2]and [3].
Refit tool [1]at «b».
Remove the screw (8).
Refit:
- The upper timing cover (11).
- The lower timing cover (12).
- The pulley (9).
- The screw (8).
Tightening methodfor the screw (8):
- Pre-tighten to 3 ± 0,3 m.daN.
- Angular tighten 180° ± 5°.
Remove tool [1].Refit:
- The engine support (7), tighten to 5,5 ± 0,9 m.daN.
- The engine support (3).
- The four screws (5), tighten to 5,5 ± 0,8 m.daN.
- The three screws (4), tighten to 5,5 ± 0,8 m.daN.
- The electrical harness (6).
Disengage the jack from under the engine.
Complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 248
Page 255 of 462
Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports (4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 249
Page 258 of 462
Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
Screw (10)Pre-tighten to : 3 ± 0,3 m.daN.
Angular tighten : 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
- Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 252