power steering Citroen C4 2005 2.G User Guide
[x] Cancel search | Manufacturer: CITROEN, Model Year: 2005, Model line: C4, Model: Citroen C4 2005 2.GPages: 462, PDF Size: 10.48 MB
Page 219 of 462
Downloaded from www.Manualslib.com manuals search engine 213
ENGINE
213
CHECKING AND SETTING THE VALVE TIMING
Engine: RFN
Checking and setting the timing (continued).
A:Pegging on the manualgearbox.
B:Pegging on the automatic gearbox.
Peg the crankshaft, using tool [2].
Remove the fixing bracket screw (4).
Move aside the power steering pipes.
Peg the camshaft pulleys (6)and (7), using tool [1].
Remove the screw (3), the crankshaft pulley (2)and
the lower timing cover (5).
IMPERATIVE: Never remove the crankshaft
pulley (2), without pegging the crankshaft and
the camshafts.
Slacken the screw (10)of the tensioner roller (9).
Turn the tensioner roller (9)
(clockwise).
Remove the timing belt (8).
B1BP2V3D
B3EP15JCB1EP1G8D
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 213
Page 232 of 462
Downloaded from www.Manualslib.com manuals search engine 226
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Tools.
[1]Camshaft setting peg: (-).0189.A
[2]Crankshaft setting peg: (-).0189.R
[3] Timing belt retaining pin: (-) 0189.K
[4]Adaptor for angular tightening: 4069-T
[5]Hub immobilising tool: (-).0189.S
[5a] : (-).0189.S1
[5b] : (-).0189.S2
Pliers for removing plastic pins: 7504-T
IMPERATIVE: Respect the safety and cleanliness requirements.
Checking and setting the timing.
Removing.
Disconnect the negative terminal of the battery
(see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove the auxiliaries drive belt
(see corresponding operation).
Unclip and move aside the fuel supply hose from the timing cover.
Remove the screw (1).
Move aside the power steering pipes.
Turn the engine by means of the screw (4)of the crankshaft pinion (3)to bring it to the pegging position.
B3EP15YC
B1BP36YC
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 226
Page 255 of 462
Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports (4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 249
Page 258 of 462
Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
Screw (10)Pre-tighten to : 3 ± 0,3 m.daN.
Angular tighten : 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
- Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 252
Page 259 of 462
Downloaded from www.Manualslib.com manuals search engine 253
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1]Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports(4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 253
Page 264 of 462
Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
- Screw (10)Pre-tighten to: 3 ± 0,3 m.daN.
Angular tighten: 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 258
Page 272 of 462
Downloaded from www.Manualslib.com manuals search engine 266
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- The fixings of the pipe linking the power steering pump with the rotary valve.
- The clutch lower closing plate.
- Lock the engine flywheel, using tool [6].
Remove the screw (8).
Refit the screw (8)without its thrust washer.
Remove:
- The accessories pulley (9), using tool [8].
- Tool [6].
- The lower torque reaction rod.
Support the engine by means of a workshop hoist.
Remove:
- The bearing shell fitting (10).
- The nut (12).
- Screws (11).
- The bracket (13).
NOTE:Lift then lower the engine with the workshop hoist, to have access to the
timing cover fixing screws.
Remove:
- The intermediate timing cover.
- The lower timing cover.
B1CP04BCB1BP2R3CB1BP2R4C
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 266
Page 374 of 462
Downloaded from www.Manualslib.com manuals search engine 368
AXLES
SUSPENSION
STEERING
C4TIGHTENING TORQUES: POWER-ASSISTED STEERING
Steering column
Ref. Description Tightening
1Fixed central controls steering wheel screw2,2 ± 0,2
2Steering column interface nuts
3Upper nuts
4Lower nuts
5Fixing of steering cardan on valve stem
Steering mechanism with integral ram
Ref. Description Tightening
6Union of hydraulic pipe on ram0,8 ± 0,1
7Fixing of distributor valve on steering mechanism1,5 ± 0,1
8Fixing of bracket on distributor valve2 ± 0,2
9Union of hydraulic pipe on distributor valve0,8 ± 0,1
10Steering ball-joint nut3,5 ± 0,3
11Locking nut for adjustment of steering track rods5,5 ± 0,5
12Fixing of ball-joint on steering rack7 ± 0,7
13Stud on steering mechanism0,8 ± 0,1
14Nut fixing mechanism on subframe8 ± 0,8
B3EP177D
B3EP176D
2,2 ± 0,2
Angl.-t2-page361-397-2005 9/01/06 10:22 Page 368
Page 375 of 462
Downloaded from www.Manualslib.com manuals search engine 369
AXLES
SUSPENSION
STEERING
C4TIGHTENING TORQUES: POWER-ASSISTED STEERING
Steering assistance electrovalve
Ref. Description Tightening
15Fixing of electrovalve on chassis member2,3 ± 0,2
16Screw fixing bracket on electrovalve2 ± 0,2
17Fixing of electrovalve on chassis member2,2 ± 0,2
B3EP178D
Angl.-t2-page361-397-2005 9/01/06 10:22 Page 369
Page 377 of 462
Downloaded from www.Manualslib.com manuals search engine 371
AXLES
SUSPENSION
STEERING
C4CHECKING THE POWER STEERING ASSISTANCE PRESSURE
Tools.
[1]Pressure gauge: (-).0710.AZ
[2]Checking tube: pressure gauge to tap: (-).0710.B1
[3]Checking tube: high pressure pipe to tap: (-).0710.B2
[4]Checking tube: high pressure pump to tap: (-).0710.B3
[5]3-way tap: (-).0710.C
[6]Union: (-).0710.J
[7]Union: (-).0710.K
[8] Plugs for checking valve sealing: (-).0710.H
Precautions to be taken.
Work with care to avoid entry of polluting particles into the circuit.
NOTE:The correct operation of the system requires perfect cleanliness of the fluid and of the
hydraulic components.
Check:
- The level of the power steering fluid.
- The condition of the piping and unions.
Using the tools.
Prepare the checking assembly [1], [2], [3], [4], [5], [6]and [7].
Attach the tool [1].
Remove the front RH wheel, the splash-shield and the screen wash reservoir.
B3EP16CC
B3EP16DC
Angl.-t2-page361-397-2005 9/01/06 10:22 Page 371