wheel Citroen C4 2005 2.G Repair Manual
[x] Cancel search | Manufacturer: CITROEN, Model Year: 2005, Model line: C4, Model: Citroen C4 2005 2.GPages: 462, PDF Size: 10.48 MB
Page 240 of 462

Downloaded from www.Manualslib.com manuals search engine 234
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1EP18GC
Setting the timing.
Remove the upper timing cover (1).
Rotate the engine by means of the crankshaft screw (2).
NOTE:The pegging hole is located under the crankshaft bearing cap cover.
Peg the engine flywheel, using tool [3].
Remove the lower timing cover (3).
Uncouple the exhaust line from the manifold.
IMPERATIVE: Uncouple the exhaust line in order to avoid damaging the front flexible pipe. Twisting,
pulling and bending the front flexible pipe reduces its life.
Remove:
- The engine speed sensor (6).
- The belt retaining stop (5).
- The screw (2).
- The crankshaft pinion (4)
(with its magnetic track «a»).
IMPERATIVE: The magnetic track should show no signs of damage and should not be approached
by any other source of magnetism. Should this not be adhered to, it is essential to replace the
crankshaft pinion.
Refit the screw (2).
B1BP2LXC
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 234
Page 245 of 462

Downloaded from www.Manualslib.com manuals search engine 239
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1EP18LCB1BP2LZC
Setting the timing (continued).
Refit:
- The intermediate RH engine support, tighten the screws (16)to 5,5 ± 0,5 m.daN.
- The RH engine support, tighten the screws (17)to 4,5 ± 0,4 m.daN.
- The bottom timing cover (3).
Immobilise the engine flywheel, using tool [3].
Remove the screw (2).
Refit the accessories drive pulley and tighten to:
- Pre-tighten to : 3 ± 0,3 m.daN.
- Angular tighten to: 180° ± 1,8°.
Remove tool [3].
Refit:
- The top cover (1).
- The accessories belt
(see corresponding operation).
- The exhaust line
(see corresponding operation).
- The front RH splash-shield.
- The front RH wheel.
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 239
Page 246 of 462
![Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3 Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3](/img/9/4138/w960_4138-245.png)
Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the catalytic converter flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 240
Page 247 of 462
![Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 241
ENGINE
CHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Turn the engine in the normal direction of rotation until the peg [1]engages in t Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 241
ENGINE
CHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Turn the engine in the normal direction of rotation until the peg [1]engages in t](/img/9/4138/w960_4138-246.png)
Downloaded from www.Manualslib.com manuals search engine 241
ENGINE
CHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Turn the engine in the normal direction of rotation until the peg [1]engages in the setting hole.
Peg the flywheel at «b», using tool [1].
Move aside the electrical harness (6).
Remove:
- The engine support (7).
- The screw (8).
- The accessories drive pulley (9).
- The lower timing cover (10).
- The upper timing cover (11).
- The tool [1].
Refit the screw (8).
Rotate the crankshaft six times
(clockwise).
IMPERATIVE: Never turn it backwards.
B1BP305C
B1EP1HJD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 241
Page 248 of 462
![Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 242
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking the timing (continued).
Peg the camshaft at «c», using tool [2]
(oil t Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 242
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking the timing (continued).
Peg the camshaft at «c», using tool [2]
(oil t](/img/9/4138/w960_4138-247.png)
Downloaded from www.Manualslib.com manuals search engine 242
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking the timing (continued).
Peg the camshaft at «c», using tool [2]
(oil the pegs).
WARNING: The magnetic track should not show any sign of damage and should not be
approached by any other magnetic source.
Peg the crankshaft at «d», using tool [3].
ESSENTIAL: Should it not be possible to peg the camshaft, check that the offset between
the camshaft pinion hole and the pegging hole is not more than 1 mm. If it is more, repeat
the operation to position the timing belt
(see corresponding operation).
Note : The index «e»of the dynamic tensioner roller should be centred in the interval «f».
Check the correct positioning of the index «e».
If it is not correct, repeat the operation to tension the timing belt
(see corresponding operation).
Remove tools [2]and [3].
Refitting.
Peg the flywheel at «b», using tool [1].
Remove the screw (8).
Refit the upper timing cover (11), lower timing cover (10), the accessories drive pulley (9), the screw (8).
Tightening method for the screw (8):
- Pre-tighten to 3 ± 0,3 m.daN.- Angular tighten: 180° ± 5°.
Remove the tool [1]and complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following a reconnection of the battery
(see corresponding operation).
B1EP1HKC
B1EP1E5C
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 242
Page 249 of 462
![Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg:](/img/9/4138/w960_4138-248.png)
Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 243
Page 250 of 462

Downloaded from www.Manualslib.com manuals search engine 244
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking and setting the timing (continued).
Turn the engine in the normal direction of rotation until the peg [1]engages in the setting hole.
Peg the flywheel at «b», using tool [1].
Move aside the electrical harness (6).
Remove:
- The engine support (7).
- The screw (8).
- The accessories drive pulley (9).
- The lower timing cover (10).
- The upper timing cover (11).
- The tool [1].
Refit the screw (8).
Rotate the crankshaft to bring the camshaft to its pegging point.
Peg:
- The camshaft at «c», using tool [2]
(oil the pegs).
- The fuel high pressure pump pulley (15)at «f»using a 5 mmdiameter peg.
WARNING: Do not touch or damage the track of the engine speed sensor target (14).
B1BP305C
B1EP1HJD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 244
Page 255 of 462
![Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting pe Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting pe](/img/9/4138/w960_4138-254.png)
Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports (4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 249
Page 256 of 462

Downloaded from www.Manualslib.com manuals search engine 250
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1EP1E3D
Rotate the engine to drive it in its normal direction of rotation.
Peg the flywheel, using tool [1]at «b».
Move aside the harness (7).
Remove:
- The engine support (8).
- The screw (10).
- The accessories drive pulley (9).
- The lower timing cover (11).
- The upper timing cov (12).
- The tool [1].
B1BP305C
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 250
Page 258 of 462
![Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe Citroen C4 2005 2.G Repair Manual Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe](/img/9/4138/w960_4138-257.png)
Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
Screw (10)Pre-tighten to : 3 ± 0,3 m.daN.
Angular tighten : 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
- Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 252