Ground DODGE RAM 1500 1998 2.G Workshop Manual

DODGE RAM 1500 1998 2.G Workshop Manual RAM 1500 1998 2.G DODGE DODGE https://www.carmanualsonline.info/img/12/5702/w960_5702-0.png DODGE RAM 1500 1998 2.G Workshop Manual

Page 1235 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (17) Connect the engine to body ground straps at
the left side of the cowl.
(18) Install the intake manifold.
(19) Install the engine oil dipstick tube.
(20) Install the power brake booster vacuum hos

Page 1247 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (20) Remove the left side secondary chain
guide(Refer to 9 - ENGINE/VALVE TIMING/TIMING
BELT/CHAIN AND SPROCKETS - REMOVAL).
(21) Remove the retaining bolt and the camshaft
drive gear.
CAUTION: Do not

Page 1257 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
NOTE: The cylinder head bolts are tightened using
a torque plus angle procedure. The bolts must be
examined BEFORE reuse. If the threads are necked
down the bolts should be replaced.
Neck

Page 1290 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (12) Install the front crossmember(Refer to 13 -
FRAME & BUMPERS/FRAME/FRONT CROSS-
MEMBER - INSTALLATION).
(13) Fill engine oil.
(14) Reconnect the negative battery cable.
(15) Start engine and check

Page 1296 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (1) Start the engine.
(2) Spray a small stream of water (spray bottle) at
the suspected leak area.
(3) If engine RPMS change, the area of the sus-
pected leak has been found.
(4) Repair as required.

Page 1318 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual to one gasket surface. Be certain the material sur-
rounds each mounting hole. Excess material can eas-
ily be wiped off. Components should be torqued in
place within 15 minutes. The use of a locating

Page 1320 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual ²Secure the lifting fixture to the three studs
using three 7/16 ± 14 N/C locknuts.
²Make sure the lifting loop in the lifting fixture is
in the last hole (closest to the throttle body) to min-
imiz

Page 1321 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual Position both the left and right side engine mount
brackets and install the through bolts and nuts.
Tighten nuts to4X2 vehicles95 N´m (70 ft. lbs.).
4X4 vehicles102 N´m (75 ft. lbs.).
(2)4X4 vehicle

Page 1335 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
INSTALLATION - LEFT CYLINDER HEAD
NOTE: The cylinder head bolts are tightened using
a torque plus angle procedure. The bolts must be
examined BEFORE reuse. If the threads are necked
down

Page 1336 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (9) Install the left side secondary chain guide
(Refer to 9 - ENGINE/VALVE TIMING/TIMING
BELT/CHAIN AND SPROCKETS - INSTALLA-
TION).
(10) Install the cylinder head access plug (Fig. 20).
(11) Re-set a