torque GEELY FC 2008 User Guide
[x] Cancel search | Manufacturer: GEELY, Model Year: 2008, Model line: FC, Model: GEELY FC 2008Pages: 419, PDF Size: 13.87 MB
Page 53 of 419

Engine mechanism - Engine assembly73. Install transmission assembly.(a) Install transmission assembly.
Torque: bolt A: Bolt B: Bolt C: (b) Install 6 bolts.
Torque: 74. nstall starter mounting components.Torque: bolt: Nut: 75. Install sub frame together with side member.Install front mounting assembly and rear mounting
assembly.
Torque: front: Rear: 76. Install power steering pump assembly.Torque: 77. Install engine assembly together with
transmission assembly.(a) Erect engine together with transmission assembly on
engine crane.
(b) Install engine assembly to vehicle.
(c) Temporarily install side member and 6 bolts.
(d) Install left engine mounting assembly.
Torque: (e) Install right engine mounting assembly.
(f) Insert special tool into location hole on right side of sub
frame and vehicle.
(g) Temporarily lock bolt A at first, and then lock bolt B.
(h) Insert special tool into location hole on left side of sub
frame and vehicle.
(i) Temporarily lock bolt A at first, and then lock bolt B.
(j) Insert special tool into location hole on right side of sub
frame and vehicle, and then tighten bolts up to speci-
fied torque.
Torque: bolt A: m
Bolt B: Special
tool
Special tool42
Page 54 of 419

(k) Insert special tool into location hole on left side of sub
frame and vehicle, and then tighten bolts up to speci-
fied torque.
Torque: bolt A: Bolt B: m
(l) As shown in the diagram, tighten 2 bolts.
Torque: Note: after installing sub frame, check the sub
frame is aligned with location hole on
vehicle.78. Install compressor.Torque: 79. Install lower left control arm assembly.(a) Install drive shaft to steering knucle.
(b) Install lower left control arm.
Torque: Hint: perform the same steps at another side.80. Install front left shaft hub nut.(a) Install fixed nut with socket wrench (39mm).
Torque: (b) Drive the cutout part of hub nut into groove with chisel.
Hint: perform the same steps at another side.81. Install left end front stabilizer link assembly.Fix bolts with hex socket wrench.
Torque: Hint: perform the same steps at another side.82. Install left side transversal lever assembly.(a) Connect transversal lever assembly to steering knucle
and install new nuts.
Torque: Note:Do not coat lubricant on thread and conical surface.After tightening nuts up to specified torque, con-
tinue turning nuts for 60¡ãand insert open pin.
(b) Insert new open pin.83. Connect fuel hose assembly.
84. Install battery tray.Torque: Engine mechanism - Engine assembly 43
Page 55 of 419

Engine mechanism - Engine assembly85. Install alternator mounting components.Torque: 12mm bolt head A: 14mm bolt head B: 86. Install drive belt.
87. Install engine wire harness and all hoses
not connected.(a) Check and connect all joints of engine wire harness.
(b) Check and connect all hoses.88. Install transmission control pull cable assembly
and valve control pull cable.
89. Install air filter assembly and its hose.
90. Install steering middle shaft assembly.(a) Align alignment mark on steering middle shaft.
(b) Install 2 bolts.
Torque: m
(c) Install steering column cover.91. Install front exhaust pipe assembly.
92. Install front chassis bracket.Torque: 93. Install battery and connect wire.
94. Install engine plastic hood components.
95. Install front wheel and engine bottom shield.
96. Refill transmission lubricant.
97. Refill engine oil.
98. Refill coolant.
99. Check there is oil leakage.
100. Check there is coolant leakage.
101. Check idle speed and ignition timing.
102. Check CO/HC.Alignment
mark
Sliding in
Pulling 44
Page 58 of 419

Engine mechanism - Timing chain assembly(2) Use damping pulley bolts to turn crankshaft with its key
toward upward.
(b) Install timing chain on crankshaft timing sprocket and
align the chain link having yellow mark with timing mark
of crankshaft timing sprocket.
Hint: there are 3 yellow chain links on the timing chain.(c) Install crankshaft timing sprocket with special tool.
(d) Install timing chain on camshaft timing sprocket and
align the chain link having yellow mark with camshaft
timing sprocket.27. Install chain guide rail components.Torque: m28. Install chain tension rail components.Torque: 29. Install speed sensor signal panel.Install signal panel with “F” mark toward forward.Toward portSet key
Yellow
mark
Timing mark
Special tool
Color (yellow) mark
Timing mark 47
Page 59 of 419

Engine mechanism - Timing chain assembly30. Install crankshaft front oil seal assembly.(a) Coat a little MP grease on oil seal lip.
(b) Gently knock new oil seal in with special tool and ham-
mer until the seal surface is parallel and level with the
edge of timing chain cover.
Note: do not let oil seal mouth contact with foreign
matters.31. Install timing chain hood components.(a) Eliminate all old seal materials from contact surface.
(b) As shown in the diagram, coat sealant on the edge
(diameter 3.5mm-4.5mm).
Sealant: silicon rubber flange sealant 1596 (Kesaixin
1596).
(c) Install timing chain hood with 12 bolts and nuts.
Torque: Notes:Eliminate all grease on contact surface.After coating sealant, finish installation of timing chain
hood within 3 minutes.After installing, do not refill engine oil within 2 minutes.32. Install chain tensioner components.(a) Check o-ring is clean, and buckle on the hook as shown
in the diagram.Special
tool 48 SealantSealant widthChain cover
groove
Cylinder
head groove Sealant
concentrationEntering
Hook
PinLifting
Page 60 of 419

Engine mechanism - Timing chain assembly(b) Coat engine oil on the chain tensioner, and then install
it.
Torque: Note: when installing the chain temsioner, buckle
on the hook again if plunger has ejected.33. Install damping pulley.(a) Align the key groove on the damping pulley with the
key on the crankshaft, and slide damping pulley in.
(b) Install damping pulley bolts with special tool.
Torque: (c) Turn crankshaft counterclockwise to separate the hook
from lock pin on the plunger.
(d) Turn crankshaft clockwise, and check the chain ten-
sion rail is blocked by plunger.
Hint: if the plunger does not eject, press the chain ten-
sion rail toward chain tensioner with screwdriver
or fingers to separate the hook from lock pin and
make the plunger eject.Special
tool 49 Pushing intoSeparationHook
Pin
TurningPlunger
Pushing
intoTurning
Page 61 of 419
![GEELY FC 2008 User Guide Engine mechanism - Timing chain assembly34. Install speed sensor.Torque: 35. Install engine fixing bracketTorque: 36. Install water pump mounting components
[4G18-1307100].(a) Install new o-ring GEELY FC 2008 User Guide Engine mechanism - Timing chain assembly34. Install speed sensor.Torque: 35. Install engine fixing bracketTorque: 36. Install water pump mounting components
[4G18-1307100].(a) Install new o-ring](/img/58/57161/w960_57161-60.png)
Engine mechanism - Timing chain assembly34. Install speed sensor.Torque: 35. Install engine fixing bracketTorque: 36. Install water pump mounting components
[4G18-1307100].(a) Install new o-ring on water pump.
(b) Install water pump with 6 bolts.
Torque: bolt A: m37. Install drive belt tensioner device.Torque: nut: Bolt: m38. Install right engine mounting assembly.Torque: 39. Install cylinder head cover components.(a) Install gasket to cylinder head cover.
(b) Eliminate all old seal materials.
(c) Coat sealant on 2 positions shown in the diagram.
Sealant: silicon rubber flange sealant 1596
(Kesaixin 1596).
Notes:Eliminate all grease on contact surface.After coating sealant, finish installation of cylinder
head cover within 3 minutes.After installing, do not refill engine oil within 2
minutes.
(d) Install cylinder head cover and cable bracket with 9 bolts,
2 seal washers and 2 nuts.
Torque: nut: Bolt: m40. Install ignition coil mounting components.Torque: 50
Page 62 of 419

Engine mechanism - Timing chain assembly41. Install alternator mounting components.Torque: 12mm bolt head: 14mm bolt head: m42. Refill coolant.
43. Check there is coolant leakage.
44. Check there is oil leakage.
51
Page 67 of 419

Engine mechanism - CamshaftWarning: if the air pressure in timing advance side oil duct is released earlier than that in
timing delay side oil duct, VVT driver assembly will move suddenly toward
delay side.This will cause the damage of lock pin.
(g) Remove VVT drive fixed bolts.
Notes:
It is strictly forbidden to remove other 4 bolts.
Under the condition of repeating using camshaft
timing sprocket, release lock pin at first, and then
install sprocket.12. Install VVT driver assembly.
13. Install camshaft.Put VVT driver assembly together with intake camshaft.
(a) As shown in the diagram, gently make VVT assembly
hold camshaft and turn it toward left until straight pin is
inserted into groove.
Warning: it is strictly forbidden to turn camshaft
timing sprocket toward timing delay side
(toward right).
(b) Check there is no clearance between sprocket flange
and camshaft.
(c) Fix camshaft timing sprocket and then tighten flange
bolt.
Torque: 70 ±5N.m
(d) Check VVT driver assembly could move to timing
delay side and is locked at max. timing delay position.
(f) As shown in the diagram, align alignment mark with
timing mark on camshaft timing sprocket, and install
timing chain on the timing sprocket.
(g) Check forward mark and figure, and tighten bolts as
sequences shown in the diagram.
Torque: 13 ±0.78N.m
(h) Align alignment mark on the chain with timing mark on
camshaft timing sprocket, and place exhaust camshaft
in cylinder head.Straight pin
key
grooveFlange bolt
Straight pin56Timing remark
chain linkTiming mark
Timing remark chain link
Timing mark
Page 68 of 419

Engine mechanism - Camshaft(i) Temporarily tighten fixed bolts.
(j) Check forward mark and figure, and tighten bolts as
sequences shown in the diagram.
Torque: ±0.78N.m
(k) Install camshaft front bearing cover.
Torque: 23 ±1.38N.m
(l) Fix camshaft with variable wrench and then tighten the
fixed bolts of exhaust camshaft timing sprocket.
Torque: 54 ±10.8N.m
Note: be careful not to damage valve lifter.
(m)Check the alignment marks on timing chain and cam-
shaft timing sprocket, and then align the groove of damp-
ing pulley with the timing mark on timing chain hood as
shown in the diagram.Fixing
Tightening57Mark
Mark
Mark
Timing chain hood
Groove