mount INFINITI FX35 2008 Service Manual
[x] Cancel search | Manufacturer: INFINITI, Model Year: 2008, Model line: FX35, Model: INFINITI FX35 2008Pages: 3924, PDF Size: 81.37 MB
Page 2681 of 3924
![INFINITI FX35 2008 Service Manual
ROCKER COVEREM-197
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
7. Remove grommets from right and left cowl top panel.
Remove right side grommet as follows:
- Remove battery. Re INFINITI FX35 2008 Service Manual
ROCKER COVEREM-197
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
7. Remove grommets from right and left cowl top panel.
Remove right side grommet as follows:
- Remove battery. Re](/img/42/57017/w960_57017-2680.png)
ROCKER COVEREM-197
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
7. Remove grommets from right and left cowl top panel.
Remove right side grommet as follows:
- Remove battery. Refer to SC-4, "
How to Handle Battery".
- Remove battery tray.
- Remove grommet.
8. Loosen mounting bolts in reverse order as shown in the figure. CAUTION:
Do not hold oil filler neck (right bank) not to damage it.
NOTE:
Loosen No. 10 bolt of the right bank and No. 10 and 12 bolts of
the left bank from cowl top panel hole with using tool.
9. Remove rocker cover gaskets from rocker covers.
10. Use scraper to remove all traces of liquid gaske t from cylinder head and camshaft bracket (No. 1 and 6).
CAUTION:
Do not scratch or damage the mating su rface when cleaning off oil liquid gasket.
INSTALLATION
PBIC2339E
PBIC0027E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2682 of 3924
![INFINITI FX35 2008 Service Manual
EM-198
< SERVICE INFORMATION >[VK45DE]
ROCKER COVER
1. Apply liquid gasket with tube presser (commercial service tool)
to joint among rocker cover, cylinder head and camshaft bracket
(No. 1 and 6) as INFINITI FX35 2008 Service Manual
EM-198
< SERVICE INFORMATION >[VK45DE]
ROCKER COVER
1. Apply liquid gasket with tube presser (commercial service tool)
to joint among rocker cover, cylinder head and camshaft bracket
(No. 1 and 6) as](/img/42/57017/w960_57017-2681.png)
EM-198
< SERVICE INFORMATION >[VK45DE]
ROCKER COVER
1. Apply liquid gasket with tube presser (commercial service tool)
to joint among rocker cover, cylinder head and camshaft bracket
(No. 1 and 6) as follows:
Use Genuine RTV Silicone Seal ant or equivalent. Refer to
GI-44, "
Recommended Chemical Product and Sealant".
NOTE:
The figure shows an example of left bank side [zoomed in shows
camshaft bracket (No. 1)]. Apply only to camshaft bracket (No.
1) for right bank side.
a. Refer to the figure “a” to apply liquid gasket to joint part of cam- shaft bracket (both No. 1 and 6) and cylinder head.
b. Refer to the figure “b” to apply liquid gasket to the figure “a” squarely.
2. Install new rocker cover gaskets to rocker covers.
3. Install rocker cover. Check if rocker cover gasket is not dropped from installation groove of rocker cover.
4. Tighten mounting bolts in two steps separately in numerical order as shown in the figure.
CAUTION:
Do not hold oil filler neck (r ight bank) not to damage it.
NOTE:
Tighten No. 10 bolt of the right bank and No. 10 and 12 bolts of
the left bank from cowl top panel hole with using tool.
5. Install oil filler cap and oil catcher to rocker cover (right bank), if removed.
6. Install new O-rings and PCV valves to rocker covers (right and left bank), if removed.
7. Install in the reverse order of removal.
PBIC2444E
1st step : 2.0 N·m (0.2 kg-m, 18 in-lb)
2nd step : 8.3 N·m (0.85 kg-m, 73 in-lb)
PBIC0027E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2685 of 3924
![INFINITI FX35 2008 Service Manual
TIMING CHAINEM-201
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
5. Remove intake valve timing control cover as follows:
a. Loosen and remove mounting bolts in the reverse order a INFINITI FX35 2008 Service Manual
TIMING CHAINEM-201
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
5. Remove intake valve timing control cover as follows:
a. Loosen and remove mounting bolts in the reverse order a](/img/42/57017/w960_57017-2684.png)
TIMING CHAINEM-201
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
5. Remove intake valve timing control cover as follows:
a. Loosen and remove mounting bolts in the reverse order as
shown in the figure.
b. Use seal cutter [SST: KV10111100 (J37228)] to cut liquid gasket for removal.
CAUTION:
Exercise care not to damage mating surfaces.
Pull out cover keeping level ness without an angle, as
inner part of cover is engaged with the center of camshaft
sprocket (INT).
6. Remove O-rings from front cover.
7. Obtain No. 1 cylinder at TDC of its compression stroke as follows:
a. Rotate crankshaft pulley clockwise to align the TDC identifica- tion notch (without paint mark) with timing indicator on front
cover.
b. Make sure that both intake and exhaust cam noses of No. 1 cyl- inder (engine front side of left bank) are located as shown in the
figure.
If not, turn crankshaft one revolution (360 degrees) and alignas shown in the figure.
8. Remove crankshaft pulley as follows:
PBIC0051E
SBIA0374E
PBIC2341E
KBIA0400J
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2686 of 3924
![INFINITI FX35 2008 Service Manual
EM-202
< SERVICE INFORMATION >[VK45DE]
TIMING CHAIN
a. Remove rear plate cover, and set ring gear stopper (SST).
b. Loosen crankshaft pulley bolt, and then pull crankshaft pulley
with both hands to r INFINITI FX35 2008 Service Manual
EM-202
< SERVICE INFORMATION >[VK45DE]
TIMING CHAIN
a. Remove rear plate cover, and set ring gear stopper (SST).
b. Loosen crankshaft pulley bolt, and then pull crankshaft pulley
with both hands to r](/img/42/57017/w960_57017-2685.png)
EM-202
< SERVICE INFORMATION >[VK45DE]
TIMING CHAIN
a. Remove rear plate cover, and set ring gear stopper (SST).
b. Loosen crankshaft pulley bolt, and then pull crankshaft pulley
with both hands to remove it.
CAUTION:
Do not remove crankshaft pulley bolt. Keep loosenedcrankshaft pulley bolt in place to protect removed crank-
shaft pulley from dropping.
Do not remove balance weight (inner hexagon bolt) at the
front of crankshaft pulley.
9. Remove oil pan and oil strainer. Refer to EM-183, "
Component".
10. Remove front cover as follows:
a. Loosen mounting bolts in reverse order as shown in the figure.
b. Use seal cutter [SST: KV10111100 (J37228)] to cut liquid gasket for removal.
CAUTION:
Exercise care not to damage mating surfaces.
After removal, handle front cover carefully so it does not
tilt, cant, or warp under a load.
11. Remove front oil seal from front cover using suitable tool. Use screwdriver for removal.
CAUTION:
Be careful not to damage front cover.
12. Remove O-rings from cylinder heads (right and left bank) and
cylinder block.
13. Remove chain tensioner cover from front cover. Use seal cutter [SST: KV10111100 (J37228)] to cut liquid gasket for remove.
14. Remove oil pump drive spacer. Set bolts in the two bolt holes [M6 × pitch 1.0 mm (0.04 in)] on
front surface. Using suitable puller, pull oil pump drive spacer
off from crankshaft.
NOTE:
The dimension between the centers of the two bolt holes is 33
mm (1.30 in).
In the figure, a commercial steering puller is used.
15. Remove oil pump. Refer to LU-29, "
Component".
16. Remove chain tensioner (left bank) as follows:
PBIC1656E
KBIA0354J
SBIA0373E
PBIC2342E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2687 of 3924
![INFINITI FX35 2008 Service Manual
TIMING CHAINEM-203
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
NOTE:
To remove timing chain and related parts, start with those on left bank. The procedure for removing parts
on INFINITI FX35 2008 Service Manual
TIMING CHAINEM-203
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
NOTE:
To remove timing chain and related parts, start with those on left bank. The procedure for removing parts
on](/img/42/57017/w960_57017-2686.png)
TIMING CHAINEM-203
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
NOTE:
To remove timing chain and related parts, start with those on left bank. The procedure for removing parts
on right bank is omitted because it is
the same as that for left bank.
a. Press tab in the direction of arrow (or turn lever in the direction of arrow) to unlock the locking with the groove that stops ten-
sioner plunger from returning.
Lightly press tensioner plunger to release the tension of springfor this operation.
b. Push in tensioner plunger to align the hole on lever and that on pump main body.
Pushing in tensioner too far does not allow the holes to align.Therefore, push in plunger to the degree at which the start of
stopper groove and tab engages.
c. Insert stopper pin [hard wire with approx. 0.5 mm (0.020 in) diameter or similar tool] to fix plunger. With plunger fixed,
remove chain tensioner.
17. Remove chain tension guide and timing chain slack guide.
18. Remove timing chain and crankshaft sprocket. CAUTION:
After removing timing chain, do not turn cranksh aft and camshaft separately, or valves will strike
the piston head.
19. With hexagonal part of camshaft locked with wrench, loosen mounting bolts securing camshaft sprocket to remove camshaft
sprocket.
CAUTION:
Do not loosen mounting bolts with securing anything other
than the camshaft hexagonal porti on or with tensioning the
timing chain.
20. Perform same procedure as for left bank, remove timing chain and related parts on right side.
21. Use scraper to remove all traces of old liquid gasket from front cover and opposite mating surfaces. Remove oil liquid gasket from bolt hole and thread.
22. Use scraper to remove all trace of liquid gasket from chain tensioner cover and intake valve timing control covers.
INSPECTION AFTER REMOVAL
Timing Chain
PBIC2343E
PBIC0030E
PBIC2084E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2689 of 3924
![INFINITI FX35 2008 Service Manual
TIMING CHAINEM-205
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
1. Make sure that crankshaft key and dowel pin of each camshaft
are located as shown in the figure. (No. 1 cylinder INFINITI FX35 2008 Service Manual
TIMING CHAINEM-205
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
1. Make sure that crankshaft key and dowel pin of each camshaft
are located as shown in the figure. (No. 1 cylinder](/img/42/57017/w960_57017-2688.png)
TIMING CHAINEM-205
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
1. Make sure that crankshaft key and dowel pin of each camshaft
are located as shown in the figure. (No. 1 cylinder at compres-
sion TDC)
NOTE:
Though camshaft does not stop at the position as shown in the
figure, for the placement of cam nose, it is generally accepted
camshaft is placed for the same direction of the figure.
2. Install camshaft sprockets. Install onto correct side by checking with identification mark onsurface.
Install camshaft sprocket (EXH) by selectively using the
groove of dowel pin according to the bank. (Common part
used for both banks.)
Lock the hexagonal part of camshaft in the same procedure as for removal, and tighten mounting bolts.
3. Install crankshaft sprockets for both banks. Install each crankshaft sprocket so that its flange side (thelarger diameter side without teeth) faces in the direction shown
in the figure.
NOTE:
The same parts are used but facing directions are different. Camshaft dowel pin
: At cylinder head upper face side in each bank
Crankshaft key : At cylinder head side of left bank
SBIA0356E
PBIC2345E
PBIC0057E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2691 of 3924
![INFINITI FX35 2008 Service Manual
TIMING CHAINEM-207
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
Install it so that each seal lip is oriented as shown in the figure.
CAUTION:
Be careful not to scratch or make b INFINITI FX35 2008 Service Manual
TIMING CHAINEM-207
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
Install it so that each seal lip is oriented as shown in the figure.
CAUTION:
Be careful not to scratch or make b](/img/42/57017/w960_57017-2690.png)
TIMING CHAINEM-207
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
Install it so that each seal lip is oriented as shown in the figure.
CAUTION:
Be careful not to scratch or make burrs on circumference
of oil seal.
Using front oil seal drift (commerc ial service tool), press fit until
the height of front oil seal is level with the mounting surface.
Make sure the garter spring is in position and seal lips not inverted.
9. Install chain tensioner cover to front cover. Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to front cover as shown in the figure.
Use Genuine RTV Silicone Seal ant or equivalent. Refer to
GI-44, "
Recommended Chemical Product and Sealant".
10. Install front cover as follows:
a. Install new O-rings onto cyli nder heads (right and left bank) and
cylinder block.
SEM715A
Front oil seal drift
Outer diameter : 56 mm (2.20 in)
Inner diameter : 49 mm (1.93 in)
PBIC0059E
SBIA0372E
SBIA0373E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2692 of 3924
![INFINITI FX35 2008 Service Manual
EM-208
< SERVICE INFORMATION >[VK45DE]
TIMING CHAIN
b. Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to front cover as shown in the figure.
Use Genuine RTV Sili INFINITI FX35 2008 Service Manual
EM-208
< SERVICE INFORMATION >[VK45DE]
TIMING CHAIN
b. Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to front cover as shown in the figure.
Use Genuine RTV Sili](/img/42/57017/w960_57017-2691.png)
EM-208
< SERVICE INFORMATION >[VK45DE]
TIMING CHAIN
b. Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to front cover as shown in the figure.
Use Genuine RTV Silicone Seal ant or equivalent. Refer to
GI-44, "
Recommended Chemical Product and Sealant".
c. make sure again that the mating marks on timing chain and that on each sprocket are aligned. Then, install front cover.
CAUTION:
Be careful to avoid interferen ce with the front end of oil
pump drive spacer. Such interf erence may damage front oil
seal.
d. Tighten mounting bolts in numerical order as shown in the fig- ure.
There are four type mounting bolts.
e. After all mounting bolts are tightened, retighten t hem in numerical order as shown in the figure.
CAUTION:
Be sure to wipe off any excessive liquid gasket leaking onto surface mating with oil pan.
11. Install intake valve timing control cover as follows:
a. At the back of intake valve timing control cover, in stall new seal rings (three for each bank) to the area to
be inserted into camshaft sprocket (INT).
CAUTION:
Do not spread seal ring excessively to avoid breaks and deformation.
b. Install new O-rings on front cover.
PBIC0062E
KBIA0354J
PBIC1681E
SBIA0374E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2693 of 3924
![INFINITI FX35 2008 Service Manual
TIMING CHAINEM-209
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
c. Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to intake valve timing cont INFINITI FX35 2008 Service Manual
TIMING CHAINEM-209
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
c. Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to intake valve timing cont](/img/42/57017/w960_57017-2692.png)
TIMING CHAINEM-209
< SERVICE INFORMATION > [VK45DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
c. Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to intake valve timing control covers as
shown in the figure.
Use Genuine RTV Silicone Seal ant or equivalent. Refer to
GI-44, "
Recommended Chemical Product and Sealant".
d. Tighten mounting bolts in numerical order as shown in the fig- ure.
12. Install intake valve timing control position sensor, intake valve timing control solenoid valve and camshaft position sensor (PHASE) to intake valve timing control cover and front cover if removed.
Be sure to tighten mounting bolts with flanges completely seated.
13. Install oil pan and oil strainer. Refer to EM-183, "
Component".
14. Install crankshaft pulley as follows:
a. Fix crankshaft with ring gear stopper [SST: J-45476].
b. Install crankshaft pulley, taking care not to damage front oil seal. Install according to dowel pin of oil pump drive spacer.
Lightly tapping its center with plastic hammer, insert pulley.CAUTION:
Do not tap pulley on the side surface where belt is installed (outer circumference).
c. Apply engine oil onto threaded parts of crankshaft pulley bolt and seating area.
d. Tighten crankshaft pulley bolt.
e. Put a paint mark on crankshaft pulley aligning with angle mark on crankshaft pulley bolt.
f. Further tighten by 90 degrees. (Angle tightening) Check the tightening angle by referencing to the notches. Theangle between two notches is 90 degrees.
15. Rotate crankshaft pulley in normal direction (clockwise when viewed from engine front) to confirm it turns smoothly.
16. Install in the reverse order of removal after this step. NOTE:
SBIA0375E
PBIC0051E
: 93.1 N·m (9.5 kg-m, 69 ft-lb)
PBIC2346E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C
Page 2696 of 3924
![INFINITI FX35 2008 Service Manual
EM-212
< SERVICE INFORMATION >[VK45DE]
CAMSHAFT
3. With hexagonal part of camshaft locked with wrench, loosen
bolts securing camshaft sprocket to remove camshaft sprocket.
CAUTION:
Do not loosen m INFINITI FX35 2008 Service Manual
EM-212
< SERVICE INFORMATION >[VK45DE]
CAMSHAFT
3. With hexagonal part of camshaft locked with wrench, loosen
bolts securing camshaft sprocket to remove camshaft sprocket.
CAUTION:
Do not loosen m](/img/42/57017/w960_57017-2695.png)
EM-212
< SERVICE INFORMATION >[VK45DE]
CAMSHAFT
3. With hexagonal part of camshaft locked with wrench, loosen
bolts securing camshaft sprocket to remove camshaft sprocket.
CAUTION:
Do not loosen mounting bol ts with securing anything
other than the camshaft hexagonal portion or with ten-
sioning the timing chain.
After removing timing chain, do not turn crankshaft and
camshaft separately, or valves will strike the piston head.
4. Remove intake and exhaust camshaft brackets. Mark camshafts, camshaft brackets and bolts so placed in the same position and direction for installa-
tion.
Equally loosen camshaft brackets and bolts in several steps in reverse order as shown in the figure.
Lightly tapping with plastic hammer, remove camshaft bracket (No. 1) and camshaft bracket (No. 6).
NOTE:
The bottom surface of each bracket will be stuck to cylinder
head because of liquid gasket.
5. Remove camshaft.
6. Remove valve lifter if necessary. Identify installation positions, and store them without mixing them up.
INSPECTION AFTER REMOVAL
Camshaft Runout
1. Put V-block on precise flat table, and support No. 2 and 5 journalof camshaft.
CAUTION:
Do not support journal No. 1 (on the side of camshaft
sprocket) because it has a differe nt diameter from the other
four locations.
2. Set dial indicator vertically to No. 3 journal.
3. Turn camshaft to one direction with hands, and measure the camshaft runout on dial indicator. (Total indicator reading)
4. If it exceeds the limit, replace camshaft.
Camshaft Cam Height
PBIC0030E
PBIC0031E
Limit : 0.02 mm (0.001 in)PBIC2499E
3AA93ABC3ACD3AC03ACA3AC03AC63AC53A913A773A893A873A873A8E3A773A983AC73AC93AC03AC3
3A893A873A873A8F3A773A9D3AAF3A8A3A8C3A863A9D3AAF3A8B3A8C