wheel alignment JEEP CHEROKEE 1995 Service Repair Manual

JEEP CHEROKEE 1995 Service Repair Manual CHEROKEE 1995 JEEP JEEP https://www.carmanualsonline.info/img/16/57039/w960_57039-0.png JEEP CHEROKEE 1995 Service Repair Manual

Page 14 of 2198

JEEP CHEROKEE 1995  Service Repair Manual 4WD YJ VEHICLES
(1) Raise the rear of the vehicle off the ground and
install tow dollies under rear wheels.
CAUTION: Use tow chains with T-hooks for con-
necting to the disabled vehicles frame rails.

Page 36 of 2198

JEEP CHEROKEE 1995  Service Repair Manual FRONT SUSPENSION AND AXLE
CONTENTS
page page
AXLE NOISE/VIBRATION DIAGNOSIS........ 18
AXLE SPECIFICATIONS................... 49
FRONT WHEEL ALIGNMENT................ 5
GENERAL INFORMATION............

Page 40 of 2198

JEEP CHEROKEE 1995  Service Repair Manual FRONT WHEEL ALIGNMENT
INDEX
page page
Alignment Measurements and Adjustments....... 8
General Information........................ 5Pre-Alignment Inspection.................... 6
GENERAL INFORMATION
Fr

Page 41 of 2198

JEEP CHEROKEE 1995  Service Repair Manual even tire wear. The wheel toe position is thefinal
front wheel alignment adjustment.
²STEERING AXIS INCLINATION ANGLE is mea-
sured in degrees and is the angle that the steering
knuckles are tilted (

Page 43 of 2198

JEEP CHEROKEE 1995  Service Repair Manual ALIGNMENT MEASUREMENTS AND ADJUSTMENTS
Before each alignment reading, the vehicle should
be jounced (rear first, then front). Grasp each
bumper at the center and jounce the vehicle up and
down several

Page 45 of 2198

JEEP CHEROKEE 1995  Service Repair Manual TOE POSITIONÐYJ VEHICLES
The wheel toe position should be the final front
wheel alignment adjustment. In all instances follow
the equipment manufacturers recommended proce-
dure.
(1) Start the engin

Page 58 of 2198

JEEP CHEROKEE 1995  Service Repair Manual CAUTION: If axle is submerged in water, lubricant
must be replaced immediately to avoid possible
premature axle failure.
LUBRICANT CHANGE
The gear lubricant will drain quicker if the vehicle
has been

Page 59 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (6) Install the shock absorber and tighten the bolt
to 23 Nzm (17 ft. lbs.) torque.
(7) Install the stabilizer bar link to the axle
bracket. Tighten the nut to 95 Nzm (70 ft. lbs.)
torque.
(8) Install

Page 60 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (17) Tighten the track bar nut at the axle bracket
to 100 Nzm (74 ft. lbs.) torque.
(18) Check the front wheel alignment.
PINION SEAL REPLACEMENT
REMOVAL
(1) Raise and support the vehicle.
(2) Remove

Page 94 of 2198

JEEP CHEROKEE 1995  Service Repair Manual AXLE NOISE/VIBRATION DIAGNOSIS
INDEX
page page
Driveline Snap........................... 10
Gear and Bearing Noise..................... 9
General Information........................ 9
Limited Slip Dif
Page:   1-10 11-20 21-30 31-40 41-50 ... 60 next >