service MITSUBISHI ECLIPSE 1991 Service Manual
[x] Cancel search | Manufacturer: MITSUBISHI, Model Year: 1991, Model line: ECLIPSE, Model: MITSUBISHI ECLIPSE 1991Pages: 1216, PDF Size: 67.42 MB
Page 670 of 1216

19-22STEERING - Manual Steering Gear Box
13Roo7!
J Mow&g clamp
SERVICE POINTS OF REMOVAL.dlSLl$iF
4. DISCONNECTION OF TIE ROD END
Using the special tool, disconnect the tie’ rod from the
knuckle.
Caution
1.Be sure to tie the cord of the special tool to the nearby
part*2. loosen the nut but do not remove it.
10. REMOVAL OF GEAR BOX ASSEMBLY
(1) Move the rack completely to the right and then remove
the gear box from the crossmember.
(2) While tilting the gear box downward, remove it to the
left.
Caution
When removing the gear box, pull it out carefully andslowly to avoid damaging the boots.
INSPECTIONNlSLCAFaGEAR BOX FOR TOTAL PINION TORQUE
Using the special tools, rotate the pinion gear at the rate of one
rotation in approximately 4 to 6 seconds to check the total pinion
torque.
Standard value:
From
0-90°0.6-l .3 Nm (5-11 in.lbs.1From
90°-650°0.2-1.0 Nm (2-9 in.lbs.1
NOTE
Measure the pinion torque through the whole stroke of the rack.If the measured value is not within the standard range, first
adjust the rack support cover, and then check the total pinion
torque again.If the total pinion torque cannot be adjusted to within the
standard range by adjusting the rack support cover,
,check the
rack support cover, rack support spring, rack support and
replace any parts necessary.
CHECK THE TIE ROD FOR SWING RESISTANCE
(1) Give 10 hard swings to the tie rod.
(2) Measure the tie rod swing resistance with a spring balance.Standard value:
B-20 N (1.8-4.4 Ikw.1
12-5 Nm (17-43 in.lbs.)l
(3) If the measured value exceeds the standard value, replace
tie rod assembly.
NOTE
Even if the measured value is below the standard vglue, thetie rod which swings smoothly without excessive
clay may
be used.
SERVICE POINTS OF INSTALLATIONNlSLDAF
11. INSTALLATION OF MOUNTING RUBBER/lo. GEAR BOX
ASSEMBLY
When installing the mounting rubber, align the projection ofthe mounting rubber with the indentation in the
cross-member to install the gear box.
Page 671 of 1216

STEERING - Manual Steering Gear Box
DISASSEMBLY AND REASSEMBLY
5i)-55 Nm36-40 ft.lbs.
58-72 ft.lbs.
50-55 Nm36-40 ft.lbs.
13A0275
Disassembly steps1. Tie-rod end locking nut
l a2. Tie-rod end
W M 3. Dust cover
4. Bellows clip
+I)5. Bellows band
w 6. Bellows
+*7. Tab washerl +8. Tie-rod*aAdjustment of total pinion torque
9. Locking nut
l 10. Rack support cover
H 11. Cushion rubberw 12. Rack support springl 4 13. Rack support
14.Locking nut
l 415.Top plug
l 16. Oil seal
l + 17. Pinion
18.Pinion collar
4~ l 19. Ball bearing+* l a 20. Rack21.Rack bushing
22.Rack housing
NOTE(1) Reverse the disassembly procedures to reass&mble.(2) +e : Refer to “Service Points of Disassemblk’,‘.(3) ** : Refer to “Service Points of Reas’sembly(4) $I : Non-reusable parts
Page 672 of 1216

STEERING - Manual Steering Gear Box
Pinion
Ball bearing
13K734-iSERVICE POINTS OF DISASSEMBLY
3. REMOVAL OF DUST COVER
Remove the dust cover from the tie rod end.
NlBLFAQ5. REMOVAL OF BELLOWS BAND
Cut the bellows band, and then remove the band.
7. REMOVAL OF TAB WASHER
Unstake the tab washer which fixes the tie rod and rack with
a chisel.
19. REMOVAL OF BALL BEARINGRemove the ball bearing from the pinion.20.REMOVAL OF RACK
Pull out the rack from the gear housing in the ‘direction
shown in the illustration.
Caution
If the rack is pulled out in the wrong direction,
the’bushingin the gear box may be damaged by the rack
tpreads.
Page 676 of 1216

19-28STEERING - Power Steering Gear Box
POWER STEERING GEAR BOXREMOVAL AND INSTALLATION
-
NlSPA--
Pre-removal Operation@Draining of the Power Steering Fluid@Removal of Transfer:1&&r:, GROUP 21 -Transfer.)50-65 Nm36-47 ft.lbs.
I/a
Post-installation Operationl Installation of Transfer(:zD:” GROUP 21 -Transfer.)
l SSy,lying of the Power Steeringl Bleedino of the Power Steering
Fluid
Liie(Refer to P.19-13.1l khecking of Steering Wheel Posi-tion with Wheels Straight Ahead*Adjustment of the Front Wheel
Alignment
(Refer to GROUP Z-Service Ad-
justment Procedures.)
Removal steps1.
“,;;rt assembly and gear box connecting
bolt
2. Connection for return tube
3. Connection for pressure hose
4. Cotter pin
5.
Aft-cd end and knuckle connecting
4I)f3: H,“a:od end
8. Stabilizer bar bracket
9. Front roll stopper mounting bolt10. Center member rear mounting bolt
4411. Front exhaust pipe
l + 13. Mounting rubber
(I) Reverse the removal procedures to reinstall.(2) +e : Refer to “Service Points of Removal”.(3) .* : Refer to “Service Points of Installation”.(4) q : Non-reusable parts(4) lli
3oh2 Nm22-30 ftlba.^a-aa I.au-IUU NrnI
IO-15 Nm22-29
ft.lbs.
15-20 Nm15-20 Nm
11-14 ft.lbs.
13A027612-18 Nm
A-34 IUm
K-
1 j-+ft.lbs.
:II I-.5
/ .2!
i!!1
NOTEW-W Nm43-58
ft.lbs.13A0353
Page 677 of 1216

STEERING - Power Steering Gear Box
lS1017S
I /Mounting rubber
IIMdting clamp13Roo77
5SERVICE POINTS OF REMOVAL
NIBPNAB6. DISCONNECTION OF TIE-ROD END
Using the special tool, disconnect the tie rod from the
knuckle.
Caution
1.Be sure to tie the cord of the special tool to the nearby
part.2. Loosen the nut but do not remove it.
11. REMOVAL OF FRONT EXHAUST PIPE
Refer to GROUP
2-Stabilizer Bar.
12. REMOVAL OF GEAR BOX ASSEMBLY
(I 1 Move the rack completely to the right and then remove
the gear box from the
crossmember.
(2) While tilting the gear box downward, remove it to the
left.
Caution
When removing the gear box, pull it out carefully andslowly to avoid damaging the boots.
INSPECTION
NlSPCADaGEAR BOX FOR TOTAL PINION TORQUE
Using the special tools, rotate the pinion gear at the rate of one
rotation in approximately 4 to 6 seconds to check the total pinion
torque.Standard value:
0.6-l .3 Nm (5-l 1 in.lbs.1
NOTE
Measure the pinion torque through the whole stroke of the rack.If the measured value is not within the standard range, first
adjust the rack support cover, and then check the total pinion
torque again.If the total pinion torque cannot be adjusted to within the
standard range by adjusting the rack support cover, check the
rack support cover, rack support spring, rack support and
replace any parts necessary.CHECK THE TIE ROD FOR SWING RESISTANCE
(1) Give 10 hard swings to the tie rod.I
(2) Measure the tie rod swing resistance with a spring balance.
’Standard value: 8-20 N (1.8-4.4 Ibs.)
12-5 Nm (17-43 in.lbs.)l
(3) If the measured value exceeds the standard value, replace
tie rod assembly.
NOTE
Even if the measured value is below the standard value, thetie rod which swings smoothly without excessive play may
be used.SERVICE POINTS OF INSTALLATION
Nl9PDA9
13. INSTALLATION OF MOUNTING RUBBER/lZ. GEAR BOX
ASSEMBLY
When installing the mounting rubber, align the projection ofthe mounting rubber with the indentation in the
cross-member to install the gear box.
Page 678 of 1216

19-30STEERING - Power Steering Gear Box
DISASSEMBLY AND REASSEMBLY
12-18
Nm9-13 ftlbs.
17-28 Nm17 ,-12 19 ft.lbs.rSteering gear seal k!t
Grease
23;>.
50155 Nm36-40 ft.lbs.I
I2b
I‘\SO-56 Nm36-40 ft.lbs.
80-100 Nm : _58-72 ft.lbs./ /
Disassembly steps1. Tie rod end locking nut
l 42. Tie rod end+I) I)+ 3. Dust cover
4. Bellows clip
a*5. Bellows band
*a 6. Bellows4,7. Tab washer
l 48. Tie rods
9. Feed tube
10. O-rings
*aAdjustment of total pinion torque
+* l * II. End plug12. Self-locking nut
13. Locking nut
l * l * 14. Rack support cover
_- -lb. Hack SUppOrt sprlngw 16. Rack support
17. Valve housing
+* l * 18. Oil seal,+ 19. Pinion and valve assembly
l + 20. Seal ringmo25a
+e l a 21. Ball bearingl * l * 22. Oil seall * l 4 23. Circlip
24. Rack stopper
l * 25. Rack bushing
4* l * 26. Rackl * 27. O-ring
+* l + 28. Oil seal29. Seal ring
30. O-ring
++ l 31. Ball bearing+W l 32. Needle roller bearing+* l a 33. Oil seal+* l a 34. Back-up washer
35. Rack housing
NOTE(1) Reverse the disassembly procedures to reassemble.(2) +e : Refer to “Service Points of Disassembly”.(3) l + : Refer to “Service Points of Reassembly”.(4) q : Non-reusable parts
Page 679 of 1216

STEERING - Power Steering Gear Box
13PO126SERVICE POINTS OF DISASSEMBLY
NISAK3. REMOVAL OF DUST COVER.4
IRemove the dust cover from the tie rod end.
5. REMOVAL OF BELLOWS BAND
Using a screwdriver or similar tool, loosen and then removethe boot retaining band.
7. REMOVAL OF TAB WASHER
Unstake the tab washer which fixes the tie rod and rack with
a chisel.11. REMOVAL OF END PLUG
Disconnect end plug caulking and remove end plug.
14. REMOVAL OF RACK SUPPORT COVER
Using the special tool, remove the rack support cover fromthe gear box.
Page 682 of 1216

19-34STEERING - Power Steering Gear Box
Guide
/Oil seal
Back-up washer13A0181
roller
13R0380
O-ring
13R037E
V&t hole
13K583-SERVICE POINTS OF REASSEMBLY
NlSPHAV
34. INSTALLATION OF BACK-UP WASHER133. OIL SEAL
(1) Apply a coating of the specified fluid to the outside of the
oil seal.
Specified fluid: MOPAR ATF PLUS (Automatic Trans-mission Fluid Type 7176)/Automatic
transmission fluid “DEXRON” or
“DEXRON II”
(2) Using a tool, press the back-up washer and the oil seal
into the rack housing to the specified position (where theupper surface of the press-in guide coincides with the
stepped part of the press-in tool).
32. INSTALLATION OF NEEDLE ROLLER BEARING
(1) Apply specified fluid to housing, bearing and oil seal
press fitting surface.
Specified fluid:MOPAR ATF PLUS (Automatic Trans-mission Fluid Type 7176)/Automatic
transmission fluid “DEXRON” or
“DEXRON II”
(2) Press fit needle roller bearing.
Caution
Press fit straight as valve housing is aluminium.
31. INSTALLATION OF BALL BEARING
Press fit ball bearing.28. INSTALLATION OF OIL SEAL/27. O-RING(I
1 Apply a coating of the specified fluid to the outside of the
oil seal and O-ring.
Specified fluid: MOPAR ATF PLUS (Automatic Trans-
mission Fluid Type 7176VAutomatictransmission fluid “DEXRON” or
“DEXRON II”
(2) Press fit oil seal until it touches rack bush end.
26. INSTALLATION OF RACK ASSEMBLY
(1) Apply a coating of multipurpose grease to the rack teeth
face.Grease: MOPAR Multi-mileage Lubricant PartNo.2525035 or equivalent
CautionDo not close the vent hole in the rack with grease.
Page 687 of 1216

STEERING - Power Steering Oil Pump1849
POWER STEERING OIL PUMP
“@REMOVAL AND INSTALLATION
< 1.8L Engine >35-45 Nm25-33 ft.lbs.
20-30 ft.lbs.
13A0270
< 2.0L DOHC Engine >
35-45 Nm25-33 ft.lbs./
NlgRA-
Pre-removal Operation0 Draining the Power Steering Fluid
‘/1
7
25-33 Nm18-24 ft.lbs.
35-45 Nm
Post-installation Operation0 Supplying of the Power Steering
Fluid0 Bleeding the Power Steering Fluid
Line(Refer to P.79-13.)0 Checking of the Oil Pump Pressure(Refer to P.l9-14.)~
9-14 Nm
7-10 ft.lbs.
\
1
9-14 Nm7-10 ft.lbs.
13AO269
Removal steps1. Pressure switch connector
a*2. Return hose
4*3. Suction hose+r) .+ 4. Pressure hose
5. O-ring
6. V-belt
7. Oil pump
8. Oil pump bracket
9. Heat protector
<2.0L DOHC Engine>10. Oil reservoir
1 1. Reservoir bracket
NOTE(I) Reverse the removal procedures to reinstall.
(2) *I) : Refer to “Service Points of Removal”.(3) l a : Refer to “Service Points of Installation”.(4) 0 : Non-reusable parts
Page 688 of 1216

1 S-40STEERING - Power Steering Oil Pump
SERVICE POINTS OF REMOVAL
Nl8RW2. DISCONNECTION OF RETURN HOSE
(1) Removal the reservoir cap and disconnect the return
hose from the reservoir to drain the fluid.
(2) Jack up the front wheels.
(3) Disconnect the high tension cable and turn the engine
over several times to drain the fluid from the gear box.
3. DISCONNECTION OF SUCTION
HOSE14. PRESSURE
HOSE
Caution
The alternator is located under the oil pump. If any of the
hoses are to
be removed, cover the alternator with a ragto protect it from oil.
INSPECTION
NIRCAA0 Check the V-belt for cracks.0 Check the pulley assembly for uneven rotation.
SERVICE POINTS OF INSTALLATION
4. INSTALLATION OF PRESSURE HOSE
NlSRDAH
Connect the pressure hose so that its slit part contacts theoil pump’s guide bracket.