ignition NISSAN ALMERA 2001 Service Manual

NISSAN ALMERA 2001 Service Manual ALMERA 2001 NISSAN NISSAN https://www.carmanualsonline.info/img/5/57348/w960_57348-0.png NISSAN ALMERA 2001 Service Manual

Page 1380 of 2898

NISSAN ALMERA 2001  Service Manual CONSULT-II Reference Value in Data Monitor
Mode
NJEC0634Remarks:
+Specification data are reference values.
+Specification data are output/input values which are detected or supplied by the ECM at the

Page 1381 of 2898

NISSAN ALMERA 2001  Service Manual MONITOR ITEM CONDITION SPECIFICATION
BARO SEN+Ignition switch: ONAltitude
Approx.0m(0ft): Approx. 100.62
kPa (1.0062 bar, 1.026 kg/cm
2,
14.59 psi)
Approx. 1,000 m (3,281 ft): Approx.
88.95 kPa (0.889

Page 1385 of 2898

NISSAN ALMERA 2001  Service Manual TERMI-
NAL
NO.WIRE
COLORITEM CONDITIONDATA (DC Voltage and Pulse
Signal)
104
105
106B
B
BECM ground[Engine is running]
+Idle speedApproximately 0V
107
108
109R
R
RPower supply for ECM[Ignition switch

Page 1386 of 2898

NISSAN ALMERA 2001  Service Manual TERMI-
NAL
NO.WIRE
COLORITEM CONDITIONDATA (DC Voltage and Pulse
Signal)
331 ORCrankshaft position sen-
sor (TDC) ground[Engine is running]
+Warm-up condition
+Idle speedApproximately 0V
334 B/REngine

Page 1387 of 2898

NISSAN ALMERA 2001  Service Manual TERMI-
NAL
NO.WIRE
COLORITEM CONDITIONDATA (DC Voltage and Pulse
Signal)
417 PU/R Vehicle speed sensor[Engine is running]
+Lift up the vehicle
+In 1st gear position
+Vehicle speed is 10 km/h (6 MPH)0

Page 1388 of 2898

NISSAN ALMERA 2001  Service Manual TERMI-
NAL
NO.WIRE
COLORITEM CONDITIONDATA (DC Voltage and Pulse
Signal)
439 L/OR Tachometer[Engine is running]
+Warm-up condition
+Idle speedApproximately 4.8V
SEF325Y
[Engine is running]
+Warm-up co

Page 1390 of 2898

NISSAN ALMERA 2001  Service Manual Main Power Supply and Ground Circuit
ECM TERMINALS AND REFERENCE VALUENJEC0639Remarks: Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use EC

Page 1393 of 2898

NISSAN ALMERA 2001  Service Manual DIAGNOSTIC PROCEDURENJEC0641
1 INSPECTION START
Start engine.
Is engine running?
YesorNo
Ye s©GO TO 13.
No©GO TO 2.
2 CHECK ECM POWER SUPPLY CIRCUIT-I
1. Turn ignition switch ªONº.
2. Check voltag

Page 1394 of 2898

NISSAN ALMERA 2001  Service Manual 5 CHECK ECM POWER SUPPLY CIRCUIT-II
1. Reconnect ECM harness connector.
2. Turn ignition switch ªONº and then ªOFFº.
3. Check voltage between ECM terminals 107, 108, 109 and ground with CONSULT-II

Page 1396 of 2898

NISSAN ALMERA 2001  Service Manual 13 CHECK ECM POWER SUPPLY CIRCUIT-V
1. Turn ignition switch ªOFFº.
2. Disconnect ECM relay. (For ECM relay location, refer to ªEngine Control Component Parts Locationº.)
3. Disconnect ECM harness