wiring NISSAN PICK-UP 2001 Owner's Manual

NISSAN PICK-UP 2001 Owner's Manual PICK-UP 2001 NISSAN NISSAN https://www.carmanualsonline.info/img/5/57372/w960_57372-0.png NISSAN PICK-UP 2001 Owner's Manual

Page 33 of 1306

NISSAN PICK-UP 2001 Owners Manual Special Service Tool (YD25DDTi)
Tool number
Tool nameDescription
KV111060S0
Removal/Installation tool kit for
fuel injection pump
NT814
Supplemental Restraint System (SRS) ªAIR
BAGº
The Supplemental

Page 37 of 1306

NISSAN PICK-UP 2001 Owners Manual Supplemental Restraint System (SRS) ªAIR
BAGº and ªSEAT BELT PRE-TENSIONERº
NEEC0002The Supplemental Restraint System such as ªAIR BAGº and ªSEAT BELT PRE-TENSIONERº used along with
a seat bel

Page 40 of 1306

NISSAN PICK-UP 2001 Owners Manual SEF348N
+When measuring ECM signals with a circuit tester, never
allow the two tester probes to contact.
Accidental contact of probes will cause a short circuit and
damage the ECM power transistor.
+D

Page 107 of 1306

NISSAN PICK-UP 2001 Owners Manual MEF036D
IntroductionNEEC0036
SEF233G
SEF234G
The engine has an ECM to control major systems such as fuel
control, ignition control, idle air control system, etc. The ECM
accepts input signals from sen

Page 110 of 1306

NISSAN PICK-UP 2001 Owners Manual DESCRIPTION FOR WORK FLOWNEEC0037S01
STEP DESCRIPTION
STEP IGet detailed information about the conditions and the environment when the incident/symptom occurred using the
ªDIAGNOSTIC WORK SHEETº, EC

Page 111 of 1306

NISSAN PICK-UP 2001 Owners Manual Basic InspectionNEEC0038Precaution:
Perform Basic Inspection without electrical or mechanical
loads applied;
+Headlamp switch is OFF,
+Air conditioner switch is OFF,
+Rear window defogger switch is OF

Page 149 of 1306

NISSAN PICK-UP 2001 Owners Manual Main Power Supply and Ground Circuit
WIRING DIAGRAMNEEC0047
GEC233A
TROUBLE DIAGNOSIS FOR POWER
SUPPLY
KA24DE (EURO OBD)
Main Power Supply and Ground Circuit
EC-3124

Page 152 of 1306

NISSAN PICK-UP 2001 Owners Manual DIAGNOSTIC PROCEDURE=NEEC0049
1 INSPECTION START
Start engine.
Is engine running?
YesorNo
Ye s©GO TO 9.
No©GO TO 2.
2 CHECK POWER SUPPLY-I
1. Turn ignition switch OFF and then ON.
2. Check voltage b

Page 153 of 1306

NISSAN PICK-UP 2001 Owners Manual 5 CHECK POWER SUPPLY-II
1. Disconnect ECM relay.
LEC106A
2. Check voltage between ECM relay terminals 1, 3 and ground with CONSULT-II or tester.
SEC313D
Voltage: Battery voltage
OK or NG
OK©GO TO 7.

Page 160 of 1306

NISSAN PICK-UP 2001 Owners Manual Wiring DiagramNEEC0141
GEC247A
DTC P0031, P0032 HO2S1 HEATERKA24DE (EURO OBD)
Wiring Diagram
EC-3135