ignition NISSAN TEANA 2003 Service Manual
[x] Cancel search | Manufacturer: NISSAN, Model Year: 2003, Model line: TEANA, Model: NISSAN TEANA 2003Pages: 3502, PDF Size: 74.56 MB
Page 1961 of 3502
![NISSAN TEANA 2003 Service Manual EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-679
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is mea NISSAN TEANA 2003 Service Manual EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-679
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is mea](/img/5/57392/w960_57392-1960.png)
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-679
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.)TER-
MINAL
NO.WIRE
COLORITEM CONDITION DATA (DC Voltage)
45 PEVAP canister purge vol-
ume control solenoid valve[Engine is running]
Idle speedBATTERY VOLTAGE
(11 - 14V)
[Engine is running]
Engine speed: About 2,000 rpm (More than
100 seconds after starting engine).BATTERY VOLTAGE
(11 - 14V)
111 W / BECM relay
(Self shut-off)[Engine is running]
[Ignition switch: OFF]
For a few seconds after turning ignition
switch OFF0 - 1.0V
[Ignition switch: OFF]
More than a few seconds after turning igni-
tion switch OFFBATTERY VOLTAGE
(11 - 14V)
11 9
120R/G
R/GPower supply for ECM[Ignition switch: ON]BATTERY VOLTAGE
(11 - 14V)
SEC990C
SEC991C
Page 1962 of 3502
![NISSAN TEANA 2003 Service Manual EC-680
[VQ]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Diagnostic ProcedureBBS0056E
1. CHECK OVERALL FUNCTION
With CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose c NISSAN TEANA 2003 Service Manual EC-680
[VQ]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Diagnostic ProcedureBBS0056E
1. CHECK OVERALL FUNCTION
With CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose c](/img/5/57392/w960_57392-1961.png)
EC-680
[VQ]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Diagnostic ProcedureBBS0056E
1. CHECK OVERALL FUNCTION
With CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose connected to the EVAP canister.
3. Turn ignition switch ON.
4. Select “PURG VOL CONT/V” in “ACTIVE TEST” mode with
CONSULT-II.
5. Start engine and let it idle.
6. Change the valve opening percentage with touching “Qu” or
“Qd” on CONSULT-II screen, and check for vacuum existence at
the EVAP purge hose under the following conditions.
Without CONSULT-II
1. Turn ignition switch OFF.
2. Disconnect the EVAP purge hose connected to the EVAP canister.
3. Start engine and let it idle for at least 100 seconds.
4. Check for vacuum existence at the EVAP purge hose under the
following conditions.
OK or NG
OK >> GO TO 2.
NG >> GO TO 3.
2. CHECK EVAP CANISTER
Refer to EC-369, "
Component Inspection" .
OK or NG
OK >>INSPECTION END
NG >> Replace EVAP canister.
PBIB0569E
Conditions
(PURG VOL CONT/V)Vacuum
0% Should not exist
100% Should exist
PBIB2124E
Conditions Vacuum
At idle Should not exist
Engine speed: About 2,000 rpm Should exist
PBIB2124E
Page 1963 of 3502
![NISSAN TEANA 2003 Service Manual EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-681
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
3. CHECK EVAP PURGE LINE
Check EVAP purge line (pipe, rubber tube, fuel tank and EVAP canister) for cracks or NISSAN TEANA 2003 Service Manual EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-681
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
3. CHECK EVAP PURGE LINE
Check EVAP purge line (pipe, rubber tube, fuel tank and EVAP canister) for cracks or](/img/5/57392/w960_57392-1962.png)
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
EC-681
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
3. CHECK EVAP PURGE LINE
Check EVAP purge line (pipe, rubber tube, fuel tank and EVAP canister) for cracks or improper connection.
Refer to EC-367, "
EVAPORATIVE EMISSION LINE DRAWING" .
OK or NG
OK >> GO TO 4.
NG >> Repair or reconnect the hose.
4. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE POWER SUPPLY CIR-
CUIT
1. Turn ignition switch OFF.
2. Disconnect EVAP canister purge volume control solenoid valve
harness connector.
3. Turn ignition switch ON.
4. Check voltage between EVAP canister purge volume control
solenoid valve terminal 1 and ground with CONSULT-II or tester.
OK or NG
OK >> GO TO 6.
NG >> GO TO 5.
5. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors E11, E253
Harness connectors E102, M57
Harness connectors F103, M52
Harness connectors F1, F251
Harness for open or short between EVAP canister purge volume control solenoid valve and IPDM E/R
Harness for open or short between EVAP canister purge volume control solenoid valve and ECM
>> Repair harness or connectors.
PBIB2107E
Voltage: Battery voltage
PBIB0148E
Page 1964 of 3502
![NISSAN TEANA 2003 Service Manual EC-682
[VQ]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
6. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OUTPUT SIGNAL CIR-
CUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Di NISSAN TEANA 2003 Service Manual EC-682
[VQ]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
6. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OUTPUT SIGNAL CIR-
CUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Di](/img/5/57392/w960_57392-1963.png)
EC-682
[VQ]
EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
6. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OUTPUT SIGNAL CIR-
CUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 45 and EVAP canister purge volume control solenoid
valve terminal 2. Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK (With CONSULT-II)>>GO TO 8.
OK (Without CONSULT-II)>>GO TO 9.
NG >> GO TO 7.
7. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors F1, F251
Harness for open or short between EVAP canister purge volume control solenoid valve and ECM.
>> Repair open circuit or short to ground or short to power in harness or connectors.
8. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OPERATION
With CONSULT-II
1. Reconnect all harness connectors disconnected.
2. Start engine.
3. Perform “PURG VOL CONT/V” in “ACTIVE TEST” mode with
CONSULT-II. Check that engine speed varies according to the
valve opening.
OK or NG
OK >> GO TO 10.
NG >> GO TO 9.
9. CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE
Refer to EC-683, "
Component Inspection" .
OK or NG
OK >> GO TO 10.
NG >> Replace EVAP canister purge volume control solenoid valve.
10. CHECK INTERMITTENT INCIDENT
Refer to EC-450, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>>INSPECTION END Continuity should exist.
PBIB0147E
Page 1968 of 3502
![NISSAN TEANA 2003 Service Manual EC-686
[VQ]
FUEL INJECTOR
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals NISSAN TEANA 2003 Service Manual EC-686
[VQ]
FUEL INJECTOR
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals](/img/5/57392/w960_57392-1967.png)
EC-686
[VQ]
FUEL INJECTOR
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.)
Diagnostic ProcedureBBS0056M
1. INSPECTION START
Turn ignition switch to START.
Is any cylinder ignited?
Ye s o r N o
Yes (With CONSULT-II)>>GO TO 2.
Yes (Without CONSULT-II)>>GO TO 3.
No >> GO TO 7.
2. CHECK OVERALL FUNCTION
With CONSULT-II
1. Start engine.
2. Perform “POWER BALANCE” in “ACTIVE TEST” mode with
CONSULT-II.
3. Make sure that each circuit produces a momentary engine
speed drop.
OK or NG
OK >>INSPECTION END
NG >> GO TO 7.
TER-
MINAL
NO.WIRE
COLORITEM CONDITION DATA (DC Voltage)
21
22
23
40
41
42L/W
R/Y
R/B
P/B
LG/R
R/WFuel injector No. 5
Fuel injector No. 3
Fuel injector No. 1
Fuel injector No. 6
Fuel injector No. 4
Fuel injector No. 2[Engine is running]
Warm-up condition
Idle speed
NOTE:
The pulse cycle changes depending on rpm at
idleBATTERY VOLTAGE
(11 - 14V)
[Engine is running]
Warm-up condition
Engine speed: 2,000 rpmBATTERY VOLTAGE
(11 - 14V)
SEC984C
SEC985C
PBIB0133E
Page 1969 of 3502
![NISSAN TEANA 2003 Service Manual FUEL INJECTOR
EC-687
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
3. CHECK FUNCTION OF FUEL INJECTOR-I
Without CONSULT-II
1. Stop engine.
2. Disconnect harness connector F1, F251.
3. Turn ignition switch ON.
4. NISSAN TEANA 2003 Service Manual FUEL INJECTOR
EC-687
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
3. CHECK FUNCTION OF FUEL INJECTOR-I
Without CONSULT-II
1. Stop engine.
2. Disconnect harness connector F1, F251.
3. Turn ignition switch ON.
4.](/img/5/57392/w960_57392-1968.png)
FUEL INJECTOR
EC-687
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
3. CHECK FUNCTION OF FUEL INJECTOR-I
Without CONSULT-II
1. Stop engine.
2. Disconnect harness connector F1, F251.
3. Turn ignition switch ON.
4. Check voltage between harness connector F1 terminal 5 and
ground with CONSULT-II or tester.
5. Turn ignition switch OFF.
6. Disconnect ECM harness connector.
7. Check harness continuity between harness connector F1 and
ECM as follows.
Refer to Wiring Diagram.
8. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 5.
NG >> GO TO 4.
4. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M52, F103
Fuse block (J/B) connector M1
10A fuse
Harness for open or short between harness connector F1 and fuse
Harness for open or short between harness connector F251 and fuel injector
>> Repair open circuit or short to ground or short to power in harness or connectors.
5. CHECK FUNCTION OF FUEL INJECTOR-II
Provide battery voltage between harness connector F251 as follows
and then interrupt it. Listen to each fuel injector operating sound.
OK or NG
OK >> GO TO 6.
NG >> GO TO 7.Voltage: Battery voltage
CylinderHarness connector F1
terminalECM terminal
1623
3222
5121
Continuity should exist.
PBIB2323E
CylinderHarness connector F251 terminal
(+) (–)
156
352
551
Operating sound should exist.PBIB2324E
Page 1970 of 3502
![NISSAN TEANA 2003 Service Manual EC-688
[VQ]
FUEL INJECTOR
6. CHECK FUNCTION OF FUEL INJECTOR-III
1. Reconnect all harness connector disconnected.
2. Start engine.
3. Listen to fuel injectors No. 2, No. 4, No.6 operating sound.
OK NISSAN TEANA 2003 Service Manual EC-688
[VQ]
FUEL INJECTOR
6. CHECK FUNCTION OF FUEL INJECTOR-III
1. Reconnect all harness connector disconnected.
2. Start engine.
3. Listen to fuel injectors No. 2, No. 4, No.6 operating sound.
OK](/img/5/57392/w960_57392-1969.png)
EC-688
[VQ]
FUEL INJECTOR
6. CHECK FUNCTION OF FUEL INJECTOR-III
1. Reconnect all harness connector disconnected.
2. Start engine.
3. Listen to fuel injectors No. 2, No. 4, No.6 operating sound.
OK or NG
OK >>INSPECTION END
NG >> GO TO 7.
7. CHECK FUEL INJECTOR POWER SUPPLY CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect fuel injector harness connector.
3. Turn ignition switch ON.
4. Check voltage between fuel injector terminal 1 and ground with
CONSULT-II or tester.
OK or NG
OK >> GO TO 9.
NG >> GO TO 8.
8. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors M52, F103
Harness connectors F1, F251
Fuse block (J/B) connector M1
10A fuse
Harness for open or short between fuel injector and fuse
>> Repair harness or connectors. Clicking noise should exist.
PBIB1986E
Voltage: Battery voltage
PBIB2182E
PBIB0582E
Page 1971 of 3502
![NISSAN TEANA 2003 Service Manual FUEL INJECTOR
EC-689
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
9. CHECK FUEL INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness NISSAN TEANA 2003 Service Manual FUEL INJECTOR
EC-689
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
9. CHECK FUEL INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness](/img/5/57392/w960_57392-1970.png)
FUEL INJECTOR
EC-689
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EC
9. CHECK FUEL INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Check harness continuity between fuel injector terminal 2 and ECM terminals 21, 22, 23, 40, 41, 42.
Refer to Wiring Diagram.
4. Also check harness for short to ground and short to power.
OK or NG
OK >> GO TO 11.
NG >> GO TO 10.
10. DETECT MALFUNCTIONING PART
Check the following.
Harness connectors F1, F251
Harness for open or short between fuel injector and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
11 . CHECK FUEL INJECTOR
Refer to EC-689, "
Component Inspection" .
OK or NG
OK >> GO TO 12.
NG >> Replace fuel injector.
12. CHECK INTERMITTENT INCIDENT
Refer to EC-450, "
TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT" .
>>INSPECTION END
Component InspectionBBS0056N
FUEL INJECTOR
1. Disconnect fuel injector harness connector.
2. Check resistance between terminals as shown in the figure.
Removal and InstallationBBS0056O
FUEL INJECTOR
Refer to EM-155, "FUEL INJECTOR AND FUEL TUBE" . Continuity should exist.
Resistance:
VQ23DE: 13.5 - 17.5 [at 10 - 60°C (50 - 140°F)]
VQ35DE: 11.1 - 14.5 [at 10 - 60°C (50 - 140°F)]
PBIB1727E
Page 1972 of 3502
![NISSAN TEANA 2003 Service Manual EC-690
[VQ]
FUEL PUMP
FUEL PUMPPFP:17042
DescriptionBBS0056P
SYSTEM DESCRIPTION
*: ECM determines the start signal status by the signals of engine speed and battery voltage.
The ECM activates the fu NISSAN TEANA 2003 Service Manual EC-690
[VQ]
FUEL PUMP
FUEL PUMPPFP:17042
DescriptionBBS0056P
SYSTEM DESCRIPTION
*: ECM determines the start signal status by the signals of engine speed and battery voltage.
The ECM activates the fu](/img/5/57392/w960_57392-1971.png)
EC-690
[VQ]
FUEL PUMP
FUEL PUMPPFP:17042
DescriptionBBS0056P
SYSTEM DESCRIPTION
*: ECM determines the start signal status by the signals of engine speed and battery voltage.
The ECM activates the fuel pump for 1 second after the ignition switch is turned ON to improve engine start-
ability. If the ECM receives a engine speed signal from the camshaft position sensor (PHASE), it knows that
the engine is rotating, and causes the pump to operate. If the engine speed signal is not received when the
ignition switch is ON, the engine stalls. The ECM stops pump operation and prevents battery discharging,
thereby improving safety. The ECM does not directly drive the fuel pump. It controls the ON/OFF fuel pump
relay, which in turn controls the fuel pump.
COMPONENT DESCRIPTION
A turbine type design fuel pump is used in the fuel tank.
CONSULT-II Reference Value in Data Monitor ModeBBS0056Q
Specification data are reference values.
Sensor Input Signal to ECM ECM Function Actuator
Crankshaft position sensor (POS)
Camshaft position sensor (PHASE)Engine speed*
Fuel pump control Fuel pump relay
Battery Battery voltage*
Condition Fuel pump operation
Ignition switch is turned to ON. Operates for 1 second.
Engine running and crankingOperates.
When engine is stoppedStops in 1.5 seconds.
Except as shown aboveSto ps.
PBIB2259E
MONITOR ITEM CONDITION SPECIFICATION
FUEL PUMP RLY
For 1 second after turning ignition switch ON
Engine running or crankingON
Except above conditions OFF
Page 1974 of 3502
![NISSAN TEANA 2003 Service Manual EC-692
[VQ]
FUEL PUMP
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing s NISSAN TEANA 2003 Service Manual EC-692
[VQ]
FUEL PUMP
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing s](/img/5/57392/w960_57392-1973.png)
EC-692
[VQ]
FUEL PUMP
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
Diagnostic ProcedureBBS0056S
1. CHECK OVERALL FUNCTION
1. Turn ignition switch ON.
2. Pinch fuel feed hose with two fingers.
OK or NG
OK >>INSPECTION END
NG >> GO TO 2.
2. CHECK FUEL PUMP POWER SUPPLY CIRCUIT-I
1. Turn ignition switch OFF.
2. Disconnect ECM harness connector.
3. Turn ignition switch ON.
4. Check voltage between ECM terminal 113 and ground with
CONSULT-II or tester.
OK or NG
OK >> GO TO 5.
NG >> GO TO 3.
TER-
MINAL
NO.WIRE
COLORITEM CONDITION DATA (DC Voltage)
113 B/R Fuel pump relay[Ignition switch: ON]
For 1 second after turning ignition switch
ON.
[Engine is running]0 - 1.5V
[Ignition switch: ON]
More than 1 second after turning ignition
switch ON.BATTERY VOLTAGE
(11 - 14V)
Fuel pressure pulsation should be felt on the fuel feed
hose for 1 second after ignition switch is turned ON.
PBIB2125E
Voltage: Battery voltage
PBIB1187E