engine SSANGYONG MUSSO 2003 Service Manual

SSANGYONG MUSSO 2003 Service Manual MUSSO 2003 SSANGYONG SSANGYONG https://www.carmanualsonline.info/img/67/57511/w960_57511-0.png SSANGYONG MUSSO 2003 Service Manual

Page 418 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE MECHANICAL  1B3-153
Tools Required 
115 589 02 34 00 Sliding Hammer
116 589 20 33 00 Threaded  Pin Removal Procedure 
1. Removal the cylinder head cover. 
2. Pull off the tensioning lever

Page 419 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B3-154  OM600 ENGINE MECHANICAL 
4. Position the no. 1 cylinder at the TDC of OT.
6. Pull out the bearing pins (9, 11) with sliding hammer andremove the guide rail 10.
Sliding Hammer 116 589 20 33 00

Page 420 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE MECHANICAL  1B3-155
In this position, the marking on the camshaft / camshaft bearing cap (arrow) must also be aligned.
5. Install the guide pulley (12).
Tightening Torque 23 Nm
6. Attach

Page 421 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B3-156  OM600 ENGINE MECHANICAL
TIMING CASE COVER GUIDE RAIL Preceding Work : Removal of cylinder head cover1 Bearing Pin 
2 Bearing Pin 
3 Guide Rail 
4 Oil Pump Chain 5 Crankshaft
6 Spring 
7 Bushi

Page 422 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B3-158  OM600 ENGINE MECHANICAL 
CRANKSHAFT SPROCKET 
Preceding Work   : Removal of oil panRemoval of timing case cover
1 12-Sided Stretch Bolt (M11) .. Check, 25Nm + 90 °
2 Washer 
3 Camshaft Sproc

Page 423 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE MECHANICAL  1B3-159
Special Tools 
116 589 07 15 00  Drift102 589 05 33 00  Puller Removal Procedure 
1. Pull out the tensioning lever (19) together with the spring(17) and guide rail (16

Page 424 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B3-160  OM600 ENGINE MECHANICAL 
10. Remove the crankshaft sprocket (12) by using a puller(20).
Puller 102 589 05 33 00
5. Place alignment marks (arrow) on the timing chain (4) and
crankshaft sprocke

Page 425 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE MECHANICAL  1B3-161
Installation Procedure 
1. Put the same alignment mark on the new crankshaftsprocket as in the old sprocket. Notice Check the timing chain, camshaft sprocket, injectio

Page 426 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B3-162  OM600 ENGINE MECHANICALNotice If the max. length  ‘L’ of the stretch bolt exceeds 53.6mm,
replace it.
5. Fit the oil pump chain (9) on the crankshaft sprocket (12) and insert the oil pump

Page 427 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE MECHANICAL  1B3-163
PISTON 
Preceding Work : Removal of the cylinder headRemoval of the oil pump
1 Oil Ring 
2 2nd Ring
3 Top Ring 
4 Snap Ring............................................