Check timing chain SUZUKI SWIFT 2008 2.G Service Workshop Manual

SUZUKI SWIFT 2008 2.G Service Workshop Manual SWIFT 2008 2.G SUZUKI SUZUKI https://www.carmanualsonline.info/img/20/7607/w960_7607-0.png SUZUKI SWIFT 2008 2.G Service Workshop Manual

Page 47 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Table of Contents 1-iii
EVAP Canister Purge Valve and Its Circuit 
Inspection.......................................................... 1B-2
Va

Page 103 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine General Information and Diagnosis:  1A-53
DTC Troubleshooting
NOTE
• When measuring circuit voltage, resistance and/or pulse signal at

Page 157 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine General Information and Diagnosis:  1A-107
DTC P0327 / P0328: Knock Sensor 1 Circuit Low / HighS7RS0B1104040
Wiring Diagram
DTC Detectin

Page 292 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-7 Engine Mechanical: 
Replacement of Shim1) Close the valve whose shim (2) is to be replaced by  turning crankshaft, then tu rn tappet (3) t

Page 305 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-20
15) Install A/C compressor to its bracket (if equipped) referring to “Compressor Assembly Removal and 
Installation

Page 307 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-22
Installation1) Clean sealing surface on timing chain cover, cylinder  block and cylinder head.
Remove oil, old sealan

Page 308 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-23 Engine Mechanical: 
8) Install new O-ring (1) to oil gallery pipes No.2 (2) and 
No.3 (3).
9) Install oil gallery pipes  No.2 and No.3 to

Page 309 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-24
Oil Control Valve InspectionS7RS0B1406016
Oil Control Valve1) Inspect strainer (1) and mating surface (2) of oil  con

Page 310 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-25 Engine Mechanical: 
Timing Chain and Chain Tensioner Removal 
and Installation
S7RS0B1406018
Removal
CAUTION! 
After timing chain is remo

Page 311 of 1496

SUZUKI SWIFT 2008 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-26
3) Install timing chain by aligning dark blue plate (1) of timing chain and triangle mark (2) on camshaft 
timing spr
Page:   1-10 11-20 next >