diagram YAMAHA YZ250F 2005 User Guide
[x] Cancel search | Manufacturer: YAMAHA, Model Year: 2005, Model line: YZ250F, Model: YAMAHA YZ250F 2005Pages: 668, PDF Size: 15.74 MB
Page 146 of 668

2 - 20
SPEC
1CDI unit
2Hot starter cable
3Throttle cable (pull)
4Throttle cable (return)
5Cable guide
6Ignition coil
7Radiator hose 2
8Radiator breather hose
9Radiator hose 4
0CDI unit bracket
ACDI unit bandÈPass the hot starter cable and
throttle cables through the
cable guides.
ÉPass the hot starter cable and
throttle cables between the
radiator and frame, then over
the radiator mounting boss.
ÊPass the throttle cables on the
outside of the ignition coil.
ËPass the radiator breather
hose in front of the radiator
hose 2, on the left of the chas-
sis, and then between the
frame and radiator hose 4.
ÌInsert the CDI unit band over
the CDI unit bracket as far as
possible.ÍFirst install the CDI unit and
CDI unit band to the CDI unit
bracket, then the CDI unit
bracket to the frame.
A10
ÍÌ
B7
8
9Ë
A
2
3
4
5
È 1
É
Ê
6
A
B
CABLE ROUTING DIAGRAM
Page 147 of 668

2 - 20
SPEC
1Zündbox
2Warmstartzug
3Gasgeberzug
4Gasnehmerzug
5Kabelführung
6Zündspule
7Kühler-Schlauch 2
8Kühler-Entlüftungsschlauch
9Kühler-Schlauch 4
0Zündbox-Halterung
AZündbox-Halteband
ÈDie Warmstart- und Gaszüge durch
die Kabelführungen leiten.
ÉDie Warmstart- und Gaszüge zwi-
schen Kühler und Rahmen und dann
über der Kühlerbefestigung führen.
ÊDie Gaszüge über die Zündspule füh-
ren.
ËDen Kühler-Entlüftungsschlauch vor
dem Kühler-Schlauch 2 links vom
Rahmen und dann zwischen Rahmen
und Kühler-Schlauch 4 führen.
ÌDas Zündbox-Halteband so weit wie
möglich über die Zündbox-Halterung
führen.
ÍZunächst die Zündbox und das Zünd-
box-Halteband an der Zündbox-Halte-
rung und dann die Zündbox-Halterung
am Rahmen montieren. 1Boîtier CDI
2Câble de démarrage à chaud
3Câble des gaz (tiré)
4Câble des gaz (retour)
5Guide-câble
6Bobine d’allumage
7Durit de radiateur 2
8Durit de mise à l’air du radiateur
9Durit de radiateur 4
0Support de boîtier CDI
ASangle du boîtier CDI
ÈAcheminer le câble de démarrage à chaud
et les câbles des gaz dans les guide-
câbles.
ÉAcheminer le câble de démarrage à chaud
et les câbles des gaz entre le radiateur et le
cadre, puis sur la noix de montage du
radiateur.
ÊAcheminer les câbles des gaz à l’extérieur
de la bobine d’allumage.
ËAcheminer la durit de mise à l’air du
radiateur devant la durit de radiateur 2, à
la gauche du châssis, puis entre le cadre et
la durit de radiateur 4.
ÌInsérer la sangle du boîtier CDI le plus
loin possible sur le support du boîtier
CDI.
ÍMonter d’abord le boîtier CDI et sa sangle
sur le support du boîtier CDI, puis ce der-
nier sur le cadre.1Unità CDI
2Cavo starter per partenze a caldo
3Cavo acceleratore (tirato)
4Cavo acceleratore (posizione iniziale)
5Guida cavo
6Bobina di accensione
7Flessibile radiatore 2
8Flessibile di sfiato radiatore
9Flessibile radiatore 4
0Staffa unità CDI
ANastro unità CDI
ÈFar passare il cavo starter per partenze a
caldo e i cavi dell’acceleratore attraverso
le guide cavi.
ÉFar passare il cavo starter per partenze a
caldo e i cavi dell’acceleratore tra il radia-
tore e il telaio, quindi sotto la sporgenza
di montaggio del radiatore.
ÊFar passare i cavi dell’acceleratore
all’esterno della bobina di accensione.
ËFar passare il flessibile di sfiato radiatore
davanti al flessibile radiatore 2, nella
parte sinistra della parte ciclistica, quindi
tra il telaio e il flessibile radiatore 4.
ÌInserire il più lontano possibile il nastro
dell’unità CDI sopra la relativa staffa.
ÍInstallare prima l’unità CDI e il nastro
dell’unità CDI sulla staffa dell’unità CDI,
quindi la staffa sul telaio.
DIAGRAMME D’ACHEMINEMENT DES CABLES
KABELFÜHRUNGSDIAGRAMME
SCHEMA PERCORSO DEI CAVI
Page 148 of 668

2 - 21
SPECCABLE ROUTING DIAGRAM
1Brake master cylinder
2Brake hose holder
3Brake hoseÈInstall the brake hose so that its pipe portion
directs as shown and lightly touches the projection
on the brake caliper.
ÉPass the brake hose into the brake hose holders.
ÊIf the brake hose contacts the spring (rear shock
absorber), correct its twist.
ËInstall the brake hose so that its pipe portion
directs as shown and lightly touches the projection
on the brake master cylinder.
Page 149 of 668

2 - 21
SPEC
1Hauptbremszylinder
2Bremsschlauch-Halterung
3Bremsschlauch
ÈDen Bremsschlauch so montieren,
daß der Metallstutzen am Schlau-
chende, wie abgebildet, an der Nase
des Bremssattels anliegt.
ÉDen Bremsschlauch durch die ent-
sprechenden Schlauchhalterungen
führen.
ÊFalls der Bremsschlauch die Feder
des Federbeins berührt, den
Schlauch entsprechend umbiegen.
ËDen Bremsschlauch so montieren,
daß der Metallstutzen am Schlau-
chende, wie abgebildet, an der Nase
des Bremssattels anliegt. 1Maître-cylindre de frein
2Support de durit de frein
3Durit de frein
ÈMonter la durit de frein de manière que sa
partie tubulaire soit orientée comme sur
l’illustration et touche légèrement la
saillie de l’étrier de frein.
ÉAcheminer la durit de frein dans les sup-
ports de durit de frein.
ÊSi la durit de frein entre en contact avec le
ressort (amortisseur arrière), en corriger la
torsion.
ËMonter la durit de frein de manière que sa
partie tubulaire soit orientée comme sur
l’illustration et touche légèrement la
saillie du maître-cylindre de frein.1Pompa del freno
2Supporto tubo flessibile del freno
3Tubo flessibile del freno
ÈInstallare il tubo flessibile del freno in
modo che la porzione di tubo sia rivolta
nella direzione mostrata dalla figura e toc-
chi leggermente la sporgenza sulla pinza
del freno.
ÉFar passare il tubo flessibile del freno nei
relativi supporti.
ÊSe il tubo flessibile del freno entra in con-
tatto con la molla (ammortizzatore poste-
riore), correggerne la rotazione.
ËInstallare il tubo flessibile del freno in
modo che la porzione di tubo sia rivolta
nella direzione mostrata dalla figura e toc-
chi leggermente la sporgenza sulla pompa
del freno.
DIAGRAMME D’ACHEMINEMENT DES CABLES
KABELFÜHRUNGSDIAGRAMME
SCHEMA PERCORSO DEI CAVI
Page 150 of 668

2 - 22
SPECCABLE ROUTING DIAGRAM
1Throttle cable
2Fuel tank breather hose
3Clamp
4Clutch cable
5Hot starter cable
6Engine stop switch lead
7Brake hose
8Hose guideÈFasten the engine stop switch lead to the handlebar.
ÉPass the brake hose in front of the number plate.
123
4
5
6
7
8 È
É
40˚±10˚
A
A
3
6
Page 151 of 668

2 - 22
SPEC
1Gaszug
2Kraftstofftank-Belüftungsschlauch
3Klemme
4Kupplungszug
5Warmstartzug
6Motorstoppschalter-Kabel
7Bremsschlauch
8Schlauchführung
ÈDas Motorstoppschalter-Kabel am
Lenker befestigen.
ÉDen Bremsschlauch an der Vorder-
seite des Nummernschildes entlang-
führen. 1Câble des gaz
2Durit de mise à l’air du réservoir de car-
burant
3Collier à pince
4Câble d’embrayage
5Câble de démarrage à chaud
6Fil du coupe-circuit du moteur
7Durit de frein
8Guide de durit
ÈAttacher le fil du coupe-circuit du moteur
au guidon.
ÉAcheminer la durit de frein devant la pla-
que d’identification.1Cavo acceleratore
2Flessibile di sfiato del serbatoio carbu-
rante
3Morsetto
4Cavo della frizione
5Cavo starter per partenze a caldo
6Cavo interruttore di arresto motore
7Tubo flessibile del freno
8Guida flessibile
ÈFissare il cavo interruttore di arresto
motore al manubrio.
ÉFar passare il tubo flessibile del freno
davanti alla targa.
DIAGRAMME D’ACHEMINEMENT DES CABLES
KABELFÜHRUNGSDIAGRAMME
SCHEMA PERCORSO DEI CAVI
Page 268 of 668

4 - 7
ENGRADIATOR
3. Install:
Right radiator 1
Bolt (right radiator) 2
Radiator hose 3 3
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
4. Install:
Left radiator 1
Bolt (left radiator) 2
Radiator hose 1 3
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
5. Tighten:
Radiator hose clamp 4
6. Install:
Radiator guard 1
Bolt (radiator guard) 2
NOTE:
Fit the hook a on the inner side first into the
radiator.
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
T R..2 Nm (0.2 m · kg, 1.4 ft · lb)
T R..2 Nm (0.2 m · kg, 1.4 ft · lb)
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
Page 269 of 668

ENG
4 - 7
3. Montieren:
Kühler rechts
1
Schraube (Kühler rechts)
2
Kühler-Schlauch 3
3
Siehe unter “KABELFÜH-
RUNGSDIAGRAMME” in
KAPITEL 2.
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
4. Montieren:
Kühler links
1
Schraube (Kühler links)
2
Kühler-Schlauch 1
3
Siehe unter “KABELFÜH-
RUNGSDIAGRAMME” in
KAPITEL 2.
5. Festziehen:
Kühler-Schlauchschelle
4
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
T R..2 Nm (0,2 m · kg, 1,4 ft · lb)
T R..2 Nm (0,2 m · kg, 1,4 ft · lb)
6. Montieren:
Kühlerschutz
1
Kühlerschutz-Schraube
2
HINWEIS:
Zuerst den Haken
a an der Innen-
seite des Kühlers einhaken.
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
3. Monter:
Radiateur droit 1
Boulon (radiateur droit) 2
Durit de radiateur 3 3
Se reporter à la section “DIA-
GRAMME D’ACHEMINE-
MENT DES CABLES” au
CHAPITRE 2.
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
4. Monter:
Radiateur gauche 1
Boulon (radiateur gauche) 2
Durit de radiateur 1 3
Se reporter à la section “DIA-
GRAMME D’ACHEMINE-
MENT DES CABLES” au
CHAPITRE 2.
5. Serrer:
Collier de durit du radiateur 4
6. Monter:
Plaque de protection de radiateur
1
Boulon (protection du radiateur)
2
N.B.:
Insérer le crochet a dans le radiateur, en
commençant par le côté intérieur.
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
T R..2 Nm (0,2 m · kg, 1,4 ft · lb)
T R..2 Nm (0,2 m · kg, 1,4 ft · lb)
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
3. Installare:
Radiatore destro 1
Bullone (radiatore destro) 2
Flessibile radiatore 3 3
Fare riferimento al paragrafo
“SCHEMA PERCORSO DEI
CAVI” nel CAPITOLO 2.
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
4. Installare:
Radiatore sinistro 1
Bullone (radiatore sinistro) 2
Flessibile radiatore 1 3
Fare riferimento al paragrafo
“SCHEMA PERCORSO DEI
CAVI” nel CAPITOLO 2.
5. Serrare:
Giunto flessibile radiatore 4
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
T R..2 Nm (0,2 m · kg, 1,4 ft · lb)
T R..2 Nm (0,2 m · kg, 1,4 ft · lb)
6. Installare:
Riparo radiatore 1
Bullone (riparo radiatore) 2
NOTA:
Montare il gancio a prima sul lato
interno nel radiatore.
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
RADIATEUR
KÜHLER
RADIATORE
Page 294 of 668

4 - 20
ENG
5. Install:
Throttle cable (pull) 1
Throttle cable (return) 2
6. Adjust:
Throttle grip free play
Refer to “THROTTLE CABLE ADJUST-
MENT” section in the CHAPTER 3.2
1
T R..4 Nm (0.4 m · kg, 2.9 ft · lb)
T R..11 Nm (1.1 m · kg, 8.0 ft · lb)
7. Install:
Throttle cable cover 1
Screw (throttle cable cover) 2
2 1
T R..4 Nm (0.4 m · kg, 2.9 ft · lb)
8. Install:
Throttle position sensor lead coupler 1
Clamp 2
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
CARBURETOR
Page 295 of 668

ENG
4 - 20
5. Montieren:
Gasgeberzug
1
Gasnehmerzug
2
6. Einstellen:
Gaszugspiel am Gasdrehgriff
Siehe unter “GASZUG EIN-
STELLEN” in KAPITEL 3.
T R..4 Nm (0,4 m · kg, 2,9 ft · lb)
T R..11 Nm (1,1 m · kg, 8,0 ft · lb)
7. Montieren:
Gaszug-Abdeckung
1
Schraube (Gaszug-Abdek-
kung)
2
T R..4 Nm (0,4 m · kg, 2,9 ft · lb)
8. Montieren:
Drosselklappensensor-Steck-
verbinder
1
Klemme
2
Siehe unter “KABELFÜH-
RUNGSDIAGRAMME” in
KAPITEL 2. 5. Monter:
Câble des gaz (tiré) 1
Câble des gaz (retour) 2
6. Régler:
Jeu de la poignée des gaz
Se reporter à la section
“REGLAGE DU CABLE DES
GAZ” au CHAPITRE 3.
T R..4 Nm (0,4 m · kg, 2,9 ft · lb)
T R..11 Nm (1,1 m · kg, 8,0 ft · lb)
7. Monter:
Couvercle du logement du câble
des gaz 1
Vis (couvercle du logement de
câble des gaz) 2
T R..4 Nm (0,4 m · kg, 2,9 ft · lb)
8. Monter:
Fiche rapide du fil du capteur de
position de papillon des gaz 1
Collier à pince 2
Se reporter à la section “DIA-
GRAMME D’ACHEMINE-
MENT DES CABLES” au
CHAPITRE 2.5. Installare:
Cavo acceleratore (tirare) 1
Cavo acceleratore (posizione ini-
ziale) 2
6. Regolare:
Gioco manopola acceleratore
Fare riferimento al paragrafo
“REGOLAZIONE CAVO
ACCELERATORE” nel CAPI-
TOLO 3.
T R..4 Nm (0,4 m · kg, 2,9 ft · lb)
T R..11 Nm (1,1 m · kg, 8,0 ft · lb)
7. Installare:
Rivestimento cavo acceleratore
1
Vite (rivestimento cavo accelera-
tore) 2
T R..4 Nm (0,4 m · kg, 2,9 ft · lb)
8. Installare:
Accoppiatore cavo sensore posi-
zione farfalla 1
Morsetto 2
Fare riferimento al paragrafo
“SCHEMA PERCORSO DEI
CAVI” nel CAPITOLO 2.
CARBURATEUR
VERGASER
CARBURATORE