belt ACURA CSX 2006 Service Repair Manual

Page 2878 of 2893

 
 Î 
Î 
Seat Belt Tensioner
Seat Belt Buckle Tensioner
24-197
A
A A
A
30 ft
(10 m) 07HAZ-SG00500
A 30 ft
(10 m)
07HAZ-SG00500
8. Disconnect the floor wire harness 4P connector (A) from the seat belt tensioner. Pull the seat belt out
all the way and cut it.
9. Disconnect the floor wire harness 2P connector (A) from the seat belt buckle tensioner. 10. Cut off each connector, and strip the ends of the
wires. Twist each pair of unlike colored wires
together, and clip an alligator clips (A) from the
deployment tool to each pair.
NOTE: Place the deployment tool at least 30 ft (10 m) away from the vehicle.
 The driver’s and front passenger’s airbags have dual inflators. Twist each pair of unlike colored
wires together, and clip an alligator clip to each
pair.
(cont’d)
08/08/21 14:01:59 61SNR030_240_0197
ProCarManuals.com
DYNOMITE -2009-

Page 2880 of 2893

Disposal of Damaged ComponentsDeployment Tool Check
24-199
1. If installed in a vehicle, follow the removal
procedure for the driver’s airbag (see page 24-188),
front passenger’s airbag (see page 24-189), side
airbag (see page 24-191), side curtain airbag
(see page 24-192), seat belt tensioner (see page
24-4), and seat belt buckle tensioner (see page 24-6).
2. In all cases, make a short circuit by cutting, stripping, and twisting together the two inflator
wires.
NOTE: The driver’s and front passenger’s airbags
have dual inflators. The like color wires go to the
individual inflators.
3. Package the component in exactly the same
packaging that the new replacement part came in.
4. Mark the outside of the box DAMAGED AIRBAG NOT DEPLOYED, DAMAGED SIDE AIRBAG NOT
DEPLOYED, DAMAGED SIDE CURTAIN AIRBAG
NOT DEPLOYED, or DAMAGED SEAT BELT
TENSIONER NOT DEPLOYED so it does not get
confused with your parts stock.
5. Contact your Acura District Parts and Service Manager for instructions on how and where to
return it for disposal. 1. Connect the yellow clips to both switch protector
handles on the tool.
2. Then connect the red lead to the positive battery post and the black lead to the negative battery post.
3. Push the operation switch: The green light should come on, indicating that the tool is operating
properly and is ready for use. If the red light stays
on, the tool is faulty, and another one must be used
for the procedure.
4. Disconnect the tool clips and connectors from the protector handles and the battery.
08/08/21 14:01:59 61SNR030_240_0199
ProCarManuals.com
DYNOMITE -2009-

Page 2884 of 2893

 
 
(#'      
 ) 
Removal Installation
24-203
SRS Unit Replacement
C
A B B
9.8 N·m
(1.0 kgf·m, 7.2 lbf·ft)
A
C
NOTE: If you are disconnecting only SRS unit connector
A, skipstep 2. 1. Do the battery terminal disconnection procedure (see page 22-68), then wait at least 3 minutes
before starting work.
2. Disconnect both seat belt tensioner connectors (see page 24-21) and both seat belt buckle
tensioner connectors (see page 24-21).
3. Remove the center console (see page 20-92).
4. Disconnect SRS unit connector A (28P), B (28P) and remove the TORX bolts (C), then pull out the SRS
unit. 1. Install the SRS unit (A) with new TORX bolts (B),
then connect the connectors (C) to the SRS unit;
push them into position until they click.
NOTE: Be sure the SRS unit is sitting squarely
against its bracket before torquing the TORX bolt.
2. Reconnect both seat belt tensioner connectors (see page 24-21) and both seat belt buckle
tensioner connector (see page 24-21).
3. Do the battery terminal reconnection procedure (see page 22-68).
4. Calibrate the ODS unit (see page 24-27).
5. Do the ODS unit operation check (see page 24-28).
6. Confirm proper SRS operation: Turn the ignition switch to ON (II); the SRS indicator should come on
for about 6 seconds and then go off.
7. Reinstall all removed parts.
Replace.
08/08/21 14:02:01 61SNR030_240_0203
ProCarManuals.com
DYNOMITE -2009-

Page:   < prev 1-10 ... 121-130 131-140 141-150 151-160 161-170